Permit #2021031540

Permit Details

Status: COED

Parcel Id: 07-11-31-7007-00480-0190
CONDITIONED SPACE: 2448 sqft
OPENED PORCH (WITH ROOF) : 444 sqft
OPENED PORCH (WITH ROOF) : 64 sqft
GARAGE: 607 sqft
Total Square Footage: 3563 sqft
Block: 00480
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: 386-627-0430
Location Address: 9 FULTON PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/01/2021
NOC: RECORDED
Applicant name: ANNA WIKTORIA LISOWSKI
Owner: DYBANOWSKI ARTUR

Address

207 NASSAU AVE

BROOKLYN, NY 11222

Lot: 0190
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLDEN FOX HOME REMODELING, INC
Status Location Address State License Number Phone
ACTIVE

72 HERNANDEZ AVE

PALM COAST, FL 32137

CBC1259266 (Exp: 08/31/2026) 386-627-0430

Sub Contractors

CHRISTOPHER DANIEL FULTON
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CCC1331939 (Exp: 08/31/2026) 386-445-7945
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/06/2022 FINAL APPROVED AGAETANO
Note: 10/5/2022 - PREVIOUS INSPECTION NOTES 10-5-2022 1. Master bath no hot water 2. Pool bath no hot water. 3. Kitchen sink no hot water 4. AHU and AC energy calcs do not match with units installed. Please resubmit to the building department for review.
BLD - BUILDING FINAL 10/05/2022 Disapproved - NO FEE AGAETANO
Note: 10-5-2022 1. Master bath no hot water 2. Pool bath no hot water. 3. Kitchen sink no hot water 4. AHU and AC energy calcs do not match with units installed. Please resubmit to the building department for review. 5. Homeowner has moved items including beds into the home. Contractor on site to move items around for inspection.
ROW - FINAL APRON (AFTER POUR) 10/05/2022 APPROVED EMADISON
ROW - STORMWATER FINAL 10/05/2022 FINAL APPROVED EMADISON
Note: ** 10/05/22 EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION
U -UTILITY RESIDENTIAL FINAL 10/04/2022 FINAL APPROVED DHANEY
U-CROSS CONNECTION 10/04/2022 APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/03/2022 APPROVED EMADISON
Note: 9/27/2022 8:29:56 AM- PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9270 THIS IS A REINSPECTION ** READY TO INSTALL PAVERS ** APRON AND PAVER RESTRAINTS READY TO POUR ** SCHEDULE ANOTHER PRE-POUR WHEN PAVER BASE IS IN AND COMPACTION IS CHECKED
ROW FIELD SURVEY /GRADING CERTIFICATION 10/03/2022 APPROVED RGROSS
Note: On site with super. Builder to place sod along the bottom of the wall before the Final Stormwater Inspection.
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/28/2022 CANCELLED BY APPLICANT BBEMBRY
Note: Inspector Notes from Inspection 9270 THIS IS A REINSPECTION ** READY TO INSTALL PAVERS ** APRON AND PAVER RESTRAINTS READY TO POUR ** SCHEDULE ANOTHER PRE-POUR WHEN PAVER BASE IS IN AND COMPACTION IS CHECKED
ROW- PRE-APRON (PRE-POUR) 07/21/2022 APPROVED - AS NOTED EMADISON
Note: THIS IS A REINSPECTION ** READY TO INSTALL PAVERS ** APRON AND PAVER RESTRAINTS READY TO POUR ** SCHEDULE ANOTHER PRE-POUR WHEN PAVER BASE IS IN AND COMPACTION IS CHECKED
ROW- PAVER RESTRAINTS 07/19/2022 APPROVED - AS NOTED EMADISON
Note: ** READY TO POUR
ROW- PRE-APRON (PRE-POUR) 07/19/2022 PARTIALLY APPROVED EMADISON
Note: ** APRON AND PAVER RESTRAINTS READY TO POUR ** SCHEDULE ANOTHER PRE-POUR WHEN PAVER BASE IS IN AND COMPACTION IS CHECKED
ELECTRIC - EARLY POWER 05/12/2022 APPROVED AGAETANO
Note: FPL notified at 9:12
RETAINING WALL 04/21/2022 APPROVED DCUSHING
Note: THIS IS A REINSPECTION New inspection due to canceled inspection New inspection due to canceled inspection THIS IS A REINSPECTION 1. Retaining wall not installed as per plans. 2. Please provide revision for areas not built as per plans. partial inspection scheduled for 4/11/22 4/11/22 - PARTIAL INSPECTION, SIDES ONLY. WILL D&E LATER AS PER PLAN. 4.21.22 - last section ready to pour
RETAINING WALL FOUNDATION 04/21/2022 APPROVED DCUSHING
Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Contractor not ready. 4/11/22 - SIDE WALLS ONLY, WILL D&E LATER AS PER PLAN. Rebar not constructed as per detis 1-F. Bottom left note (#5 horizontal reinforcement bars space @ 16" max) and (#5 vertical horizontal bars 12" oc tie to tension & compressionbar, typical). 02-23-2022 - Rebar not constructed as per drawings detail. 03-28-2022 - 1. Retaining wall not installed as per plans. 2. Please provide revision for areas not built as per plans. 4.21.22 - last section ready to pour
RETAINING WALL FOUNDATION 04/11/2022 PARTIALLY APPROVED FWILLIS
Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Contractor not ready. 4/11/22 - SIDE WALLS ONLY, WILL D&E LATER AS PER PLAN. Rebar not constructed as per detis 1-F. Bottom left note (#5 horizontal reinforcement bars space @ 16" max) and (#5 vertical horizontal bars 12" oc tie to tension & compressionbar, typical). 02-23-2022 - Rebar not constructed as per drawings detail. 03-28-2022 - 1. Retaining wall not installed as per plans. 2. Please provide revision for areas not built as per plans.
RETAINING WALL 04/11/2022 PARTIALLY APPROVED FWILLIS
Note: New inspection due to canceled inspection New inspection due to canceled inspection THIS IS A REINSPECTION 1. Retaining wall not installed as per plans. 2. Please provide revision for areas not built as per plans. partial inspection scheduled for 4/11/22 4/11/22 - PARTIAL INSPECTION, SIDES ONLY. WILL D&E LATER AS PER PLAN.
RETAINING WALL FOUNDATION 04/08/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Contractor not ready. Rebar not constructed as per detis 1-F. Bottom left note (#5 horizontal reinforcement bars space @ 16" max) and (#5 vertical horizontal bars 12" oc tie to tension & compressionbar, typical). 02-23-2022 - Rebar not constructed as per drawings detail. 03-28-2022 - 1. Retaining wall not installed as per plans. 2. Please provide revision for areas not built as per plans.
RETAINING WALL 04/08/2022 CANCELLED BY APPLICANT WEB
Note: New inspection due to canceled inspection THIS IS A REINSPECTION 1. Retaining wall not installed as per plans. 2. Please provide revision for areas not built as per plans.
RETAINING WALL 04/07/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION 1. Retaining wall not installed as per plans. 2. Please provide revision for areas not built as per plans.
RETAINING WALL 03/28/2022 Disapproved - NO FEE AGAETANO
Note: 1. Retaining wall not installed as per plans. 2. Please provide revision for areas not built as per plans.
RETAINING WALL FOUNDATION 03/28/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Contractor not ready. Rebar not constructed as per detis 1-F. Bottom left note (#5 horizontal reinforcement bars space @ 16" max) and (#5 vertical horizontal bars 12" oc tie to tension & compressionbar, typical). 02-23-2022 - Rebar not constructed as per drawings detail. 03-28-2022 - 1. Retaining wall not installed as per plans. 2. Please provide revision for areas not built as per plans.
RETAINING WALL FOUNDATION 02/23/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Contractor not ready. Rebar not constructed as per detis 1-F. Bottom left note (#5 horizontal reinforcement bars space @ 16" max) and (#5 vertical horizontal bars 12" oc tie to tension & compressionbar, typical). 02-23-2022 - Rebar not constructed as per drwings detail.
FOOTER 02/23/2022 APPROVED AGAETANO
Note: Inspection is for footer only.
RETAINING WALL FOUNDATION 02/22/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION Contractor not ready. Rebar not constructed as per detis 1-F. Bottom left note (#5 horizontal reinforcement bars space @ 16" max) and (#5 vertical horizontal bars 12" oc tie to tension & compressionbar, typical).
RETAINING WALL FOUNDATION 02/18/2022 Disapproved - NO FEE AGAETANO
Note: Contractor not ready.
INSULATION 10/05/2021 APPROVED DCUSHING
Note: need the following by insulation 1. FIREBLOCKING REQUIRED R302.11 (1-6) (check all) 2. need to check sliders and garage arched window nailing
LATH/BRICK/ WATER BARRIER 10/05/2021 APPROVED DCUSHING
GRAVITY SEWER TEST 10/05/2021 APPROVED MGIBSON
U - SEWER TIE IN 10/05/2021 APPROVED MGIBSON
ALL ROUGH 09/13/2021 APPROVED - AS NOTED LMILLER
Note: need the following by insulation 1. FIREBLOCKING REQUIRED R302.11 (1-6) (check all) 2. need to check sliders and garage arched window nailing
ROOF VALLEY & METAL 08/24/2021 APPROVED WMILLER
ELECTRIC-TUG 08/12/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 2:20
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/26/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Incomplete inspection, not ready for inspection, too many items wrong.... partial list follows... 1. missing second heta straps per roof plan 2. Missing MTs 18's per roof plan 3. missing MGT per roof plan All highlighted on roof plans no other items looked at 7-23-21... Missing 6X6 post agt bearing wall per plans (highlighted) 7-26-21... notes above resolved
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/23/2021 Disapproved - NO FEE WMILLER
Note: THIS IS A REINSPECTION Incomplete inspection, not ready for inspection, too many items wrong.... partial list follows... 1. missing second heta straps per roof plan 2. Missing MTs 18's per roof plan 3. missing MGT per roof plan All highlighted on roof plans no other items looked at 7-23-21... Missing 6X6 post agt bearing wall per plans (highlighted)
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/21/2021 Disapproved -FEE REQUIRED WMILLER
Note: Incomplete inspection, not ready for inspection, too many items wrong.... partial list follows... 1. missing second heta straps per roof plan 2. Missing MTs 18's per roof plan 3. missing MGT per roof plan All highlighted on roof plans no other items looked at
TIE BEAM / LINTEL 06/22/2021 APPROVED BGREVE
FOUND SURVEY APPROVED (OFFICE) 06/15/2021 APPROVED TBAKER
MONOLITHIC SLAB 06/07/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION missing vertical bar at right corner of garage as facing from street. circled on drawings
MONOLITHIC SLAB 06/04/2021 Disapproved - NO FEE BGREVE
Note: missing vertical bar at right corner of garage as facing from street. circled on drawings
PLUMBING 1ST ROUGH UNDERGROUND 05/26/2021 APPROVED JGIBSON
ROW - DRAINAGE 05/20/2021 APPROVED - AS NOTED KRUTH
Note: Inspect the property for erosion in to the rear ditch if needed require builder to install silt fence. Inspect for stormwater negatively impacting the neighboring properties. 1)-Builder has silt fence installed at the ditchline 2)-Builder is going to add siltfence up the bank to stop any sediment erosion from going into the ditch
WATER METER INSTALLATION REQUEST 05/10/2021 APPROVED TCHURCHILL
WILDLIFE CHECK - ENVIRONMENTAL 04/19/2021 APPROVED DBEVAN

Review History

Department Status Date In Date Out
BLD COMPLETE 04/06/2022 04/06/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 12/29/2021 12/29/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 12/19/2021 12/20/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 12/19/2021 12/29/2021
Note: Released By: HALEIGH HAND - -
ENGIN1 COMPLETE 12/19/2021 12/20/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 12/19/2021 12/20/2021
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM As per Land Development Code, block walls must be finished to not have visible seams and match the house (ie: stucco and painted to match. Finished masonry walls shall also include a tile, brick or decorative trim at or near the top of the wall. Please include this information on plans.
ENGIN1 COMPLETE 06/15/2021 06/15/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/15/2021 06/15/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN HOLD 06/14/2021 06/14/2021
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM rename to foundation survey
BADMIN COMPLETE 06/14/2021 06/14/2021
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
ELEC COMPLETE 05/12/2021 05/12/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 04/19/2021 04/20/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Plumbing no longer needed
PLENV COMPLETE 04/13/2021 04/14/2021
Note: Released By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The letter from Tri-County Bobcat Services has been accepted.
ZON COMPLETE 04/13/2021 04/14/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 04/13/2021 04/14/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 04/13/2021 04/18/2021
Note: Held By: JPI 1. On the revised page A-3, the plumbing isometric is unreadable.
PLFM COMPLETE 03/31/2021 03/31/2021
Note: Released By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM According to the site plan submitted on 3/23/21, the structure will be outside of the SFHA. No elevation certificates will be required.
ZON HOLD 03/31/2021 03/31/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM AC pad location on plans are not in the same location as on site and landscape plans
PLENV HOLD 03/31/2021 04/01/2021
Note: Held By: DENISE BEVAN - - dbevan@ci.palm-coast.fl.us On April 1, 2021, staff performed a site inspection to determine if gopher tortoise, a protected species, utilizes the subject property. Two burrows were observed; however, it could not be determined if each were active and/or occupied by gopher tortoise. Provide an assessment from a qualified environmental professional confirming the burrow condition and verify if a permit is required from Florida Fish and Wildlife Conservation.
SWALE COMPLETE 03/25/2021 06/22/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 03/24/2021 03/30/2021
Note: Held By: JPI 1. Provide construction details of wall framing at area above fixed glass system in Nook area in which walls are not perpendicular to trusses. 2. Provide details of construction of exterior frame wall at SGD door stack. 3. Block knee wall under fixed glass system is not illustrated on floor plans, only section cut. Provide dowel placement for said wall. 4. Provide lintel schedule.
CUSVC COMPLETE 03/24/2021 03/24/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 03/24/2021 03/24/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electrical load calcs.
ENGIN1 COMPLETE 03/24/2021 03/25/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
LOCATE COMPLETE 03/24/2021 03/25/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/24/2021 03/25/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 03/24/2021 03/30/2021
Note: Released By: JPI
SW1 COMPLETE 03/24/2021 03/31/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 03/24/2021 03/31/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM If installing a paver driveway a right of way agreement will need to signed by all owners on deed and notarized. Original document will have to be turned in to us AC pad location on plans are not in the same location as on site and landscape plans

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 10/05/2022
REINSPECTION RESIDENTIAL ¤40.00 10/05/2022
REINSPECTION RESIDENTIAL ¤40.00 10/05/2022
PLAN REVIEW - REVISION ¤32.50 10/05/2022
PLAN REVIEW - REVISION ¤32.50 01/26/2022
REINSPECTION FEE ¤40.00 01/26/2022
METER - DEPOSIT ¤60.00 01/26/2022
WATER-METER ¤467.09 01/26/2022
WATER- TURN ON ¤25.00 01/26/2022
WATER -IRRIGATION INSPECTION ¤25.00 01/26/2022
3% PARKS IMPACT FEE CREDIT (¤35.97) 05/01/2021
PLAN CHECK FEE ¤126.80 05/01/2021
PLUMBING FEE ¤250.20 05/01/2021
WATER- TURN ON ¤25.00 05/01/2021
ADMIN FEE ¤20.00 05/01/2021
CONNECTION FEES ¤1,017.83 05/01/2021
BUILDING DISCOUNT 100% (¤1,531.40) 05/01/2021
ELECTRIC FEE ¤250.20 05/01/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 05/01/2021
IMPACT FEE FIRE ¤367.00 05/01/2021
IMPACT FEE PARKS ¤1,199.12 05/01/2021
IMPACT FEE SCHOOL ¤3,600.00 05/01/2021
RECORDING FEE REIMBURSE DOC ¤44.00 05/01/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 05/01/2021
MECHANICAL FEE ¤250.20 05/01/2021
WATER -IRRIGATION INSPECTION ¤25.00 05/01/2021
NEW RESIDENTIAL INSPECTIONS ¤634.00 05/01/2021
SITE PLAN 20 ¤20.00 05/01/2021
SURCHARGE FS 533.721 ¤2.00 05/01/2021
SURCHARGE - FS 468.631 ¤2.00 05/01/2021
STORM WATER PERMIT FEES ¤80.00 05/01/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 05/01/2021
SEWER INSPECTION ¤25.00 05/01/2021
SEWER CAPITAL FACILITY ¤4,664.55 05/01/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 05/01/2021
METER - DEPOSIT ¤60.00 05/01/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,977.52