Permit #2021031795
Permit Details
Status: COED
| Parcel Id: 07-11-31-7060-00090-0010 |
| CONDITIONED SPACE: 1589 sqft |
| CONDITIONED SPACE: 1589 sqft |
| GARAGE: 427 sqft |
| GARAGE: 427 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| OPENED PORCH (WITH ROOF) : 163 sqft |
| OPENED PORCH (WITH ROOF) : 163 sqft |
| Total Square Footage: 4464 sqft |
| Block: 00090 |
| Subdivision: - |
| Job Phone: 386-237-1210 |
| Location Address: 112 SLUMBER MEADOW TR |
| Type: DU - DUPLEX |
| Issue Date: 04/13/2021 |
| NOC: RECORDED |
| Applicant name: ANDRIY POPOV |
| Owner: CFHA INVESTMENTS LLC |
|
Address 9738 US HIGHWAY 192 CLERMONT, FL 34714 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
SILVER BREEZE HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
1 SEATHORN PATH PALM COAST, FL 32164 |
PALM COAST, FL 32164 |
RR282812121 (Exp: 08/31/2023) | 386-237-1210 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/05/2022 | FINAL APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Install lockout for dishwasher in panel | |||
| BLD - BUILDING FINAL | 05/04/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Install lockout for dishwasher in panel | |||
| ROW - FINAL APRON (AFTER POUR) | 03/07/2022 | APPROVED | PFLANAGAN |
| Note: THIS IS A REINSPECTION NEED TO REMOVE THE SAND INSIDE THE CULVERT PIPES | |||
| ROW - FINAL APRON (AFTER POUR) | 03/03/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: NEED TO REMOVE THE SAND INSIDE THE CULVERT PIPES | |||
| U -UTILITY RESIDENTIAL FINAL | 02/23/2022 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 02/22/2022 | APPROVED | RGROSS |
| U-CROSS CONNECTION | 02/17/2022 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 02/17/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/16/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: Looks good at time of inspection | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/16/2022 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 01/28/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:53 am | |||
| GRAVITY SEWER TEST | 01/07/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: C/O ON LEFTSDE OF DUPLEX NEEDS 18'' CLEARENCE FOR RODDING | |||
| U - SEWER TIE IN | 01/07/2022 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 12/30/2021 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| PEP TANK INSTALLATION REQUEST | 12/03/2021 | APPROVED | CSTONE |
| INSULATION | 12/03/2021 | APPROVED | TSTAUFFACHER |
| Note: Foam in right side unit has been verified. At lath inspection, insulator was onsite and I personally saw yellow foam from gun that was class A fire rated. | |||
| ALL ROUGH | 12/02/2021 | APPROVED | TSTAUFFACHER |
| LATH/BRICK/ WATER BARRIER | 11/24/2021 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 10/19/2021 | APPROVED | TSTAUFFACHER |
| FIREWALL FINAL | 10/11/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/05/2021 | APPROVED | TSTAUFFACHER |
| FIREWALL DRYWALL NAILING | 10/05/2021 | APPROVED | TSTAUFFACHER |
| Note: Approved with braces and tie downs | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/04/2021 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC TEMP POLE | 10/04/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:21 am | |||
| TIE BEAM / LINTEL | 09/01/2021 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 07/26/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/08/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Back porch is missing 30 x 30 footings with #5 rebar per plans. Circled on the plans for reference | |||
| MONOLITHIC SLAB | 07/07/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Back porch is missing 30 x 30 footings with #5 rebar per plans. Circled on the plans for reference | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/16/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 06/03/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 07/26/2021 | 07/26/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/26/2021 | 07/26/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/25/2021 | 06/01/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/25/2021 | 05/26/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 05/25/2021 | 05/28/2021 |
| Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/25/2021 | 05/25/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/09/2021 | 04/09/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 04/09/2021 | 04/09/2021 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 04/09/2021 | 04/09/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/09/2021 | 04/12/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/09/2021 | 04/13/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/29/2021 | 04/02/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 03/29/2021 | 03/31/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 03/29/2021 | 03/30/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/29/2021 | 03/29/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| LOCATE | COMPLETE | 03/29/2021 | 03/31/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/29/2021 | 03/30/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be from 2020 7Th edition Code Cycle 2. Energy Calcs need to be signed by the builder | |||
| PLUM | HOLD | 03/29/2021 | 04/02/2021 |
| Note: Held By: JPI Held By: JPI 1. DWV illustrates two showers. Plans illustrate one tub and one shower. | |||
| SW1 | COMPLETE | 03/29/2021 | 04/06/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/29/2021 | 04/06/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Left side front does not meet the minimum front setback of 25ft All windows facing the street (left side) must have banding | |||
| SWALE | COMPLETE | 03/29/2021 | 06/25/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤120.00 | 04/13/2021 |
| WATER- TURN ON | ¤50.00 | 04/13/2021 |
| ADMIN FEE | ¤20.00 | 04/13/2021 |
| CONNECTION FEES | ¤2,035.66 | 04/13/2021 |
| BUILDING DISCOUNT 100% | (¤1,901.00) | 04/13/2021 |
| ELECTRIC FEE | ¤303.00 | 04/13/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 04/13/2021 |
| IMPACT FEE FIRE | ¤734.00 | 04/13/2021 |
| IMPACT FEE PARKS | ¤2,398.24 | 04/13/2021 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 04/13/2021 |
| IMPACT FEE TRANSPORTATION | ¤2,666.00 | 04/13/2021 |
| MECHANICAL FEE | ¤303.00 | 04/13/2021 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 04/13/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 04/13/2021 |
| PLAN CHECK FEE | ¤162.00 | 04/13/2021 |
| PLUMBING FEE | ¤303.00 | 04/13/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤810.00 | 04/13/2021 |
| SITE PLAN 20 | ¤20.00 | 04/13/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 04/13/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 04/13/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/13/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤79.98) | 04/13/2021 |
| SEWER CREDIT | (¤1,806.00) | 04/13/2021 |
| SEWER INSPECTION | ¤25.00 | 04/13/2021 |
| SEWER CAPITAL FACILITY | ¤9,329.10 | 04/13/2021 |
| WATER CAPITAL FACILITY FEE | ¤6,848.90 | 04/13/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤29,580.95 |