Permit Details

Status: COED

Parcel Id: 07-11-31-7060-00090-0010
CONDITIONED SPACE: 1589 sqft
CONDITIONED SPACE: 1589 sqft
GARAGE: 427 sqft
GARAGE: 427 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
OPENED PORCH (WITH ROOF) : 163 sqft
OPENED PORCH (WITH ROOF) : 163 sqft
Total Square Footage: 4464 sqft
Block: 00090
Subdivision: -
Job Phone: 386-237-1210
Location Address: 112 SLUMBER MEADOW TR
Type: DU - DUPLEX
Issue Date: 04/13/2021
NOC: RECORDED
Applicant name: ANDRIY POPOV
Owner: CFHA INVESTMENTS LLC

Address

9738 US HIGHWAY 192

CLERMONT, FL 34714

Lot: 0010
Contracted Stated Job Value: ¤350,000.00
Job Description: DUPLEX
Type: CN

Contractor

SILVER BREEZE HOMES
Status Location Address Mailing Address State License Number Phone
CANCEL

1 SEATHORN PATH

PALM COAST, FL 32164

PALM COAST, FL 32164

RR282812121 (Exp: 08/31/2023) 386-237-1210

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/05/2022 FINAL APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Install lockout for dishwasher in panel
BLD - BUILDING FINAL 05/04/2022 Disapproved - NO FEE TSTAUFFACHER
Note: Install lockout for dishwasher in panel
ROW - FINAL APRON (AFTER POUR) 03/07/2022 APPROVED PFLANAGAN
Note: THIS IS A REINSPECTION NEED TO REMOVE THE SAND INSIDE THE CULVERT PIPES
ROW - FINAL APRON (AFTER POUR) 03/03/2022 Disapproved - NO FEE GBERTOLA
Note: NEED TO REMOVE THE SAND INSIDE THE CULVERT PIPES
U -UTILITY RESIDENTIAL FINAL 02/23/2022 FINAL APPROVED JHARDING
ROW - FINAL INSPECTION 02/22/2022 APPROVED RGROSS
U-CROSS CONNECTION 02/17/2022 CANCELLED BY APPLICANT WEB
U-CROSS CONNECTION 02/17/2022 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/16/2022 APPROVED - AS NOTED PFLANAGAN
Note: Looks good at time of inspection
FINAL SURVEY (OFFICE USE ONLY) 02/16/2022 APPROVED PFLANAGAN
ELECTRIC - EARLY POWER 01/28/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 8:53 am
GRAVITY SEWER TEST 01/07/2022 APPROVED - AS NOTED MGIBSON
Note: C/O ON LEFTSDE OF DUPLEX NEEDS 18'' CLEARENCE FOR RODDING
U - SEWER TIE IN 01/07/2022 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 12/30/2021 APPROVED RGROSS
Note: READY TO POUR
PEP TANK INSTALLATION REQUEST 12/03/2021 APPROVED CSTONE
INSULATION 12/03/2021 APPROVED TSTAUFFACHER
Note: Foam in right side unit has been verified. At lath inspection, insulator was onsite and I personally saw yellow foam from gun that was class A fire rated.
ALL ROUGH 12/02/2021 APPROVED TSTAUFFACHER
LATH/BRICK/ WATER BARRIER 11/24/2021 APPROVED TSTAUFFACHER
ROOF VALLEY & METAL 10/19/2021 APPROVED TSTAUFFACHER
FIREWALL FINAL 10/11/2021 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/05/2021 APPROVED TSTAUFFACHER
FIREWALL DRYWALL NAILING 10/05/2021 APPROVED TSTAUFFACHER
Note: Approved with braces and tie downs
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/04/2021 CANCELLED BY APPLICANT WEB
ELECTRIC TEMP POLE 10/04/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 8:21 am
TIE BEAM / LINTEL 09/01/2021 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 07/26/2021 APPROVED TBAKER
MONOLITHIC SLAB 07/08/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Back porch is missing 30 x 30 footings with #5 rebar per plans. Circled on the plans for reference
MONOLITHIC SLAB 07/07/2021 Disapproved - NO FEE TSTAUFFACHER
Note: Back porch is missing 30 x 30 footings with #5 rebar per plans. Circled on the plans for reference
PLUMBING 1ST ROUGH UNDERGROUND 06/16/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 06/03/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 07/26/2021 07/26/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/26/2021 07/26/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/25/2021 06/01/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 05/25/2021 05/26/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
UTL COMPLETE 05/25/2021 05/28/2021
Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM
ZON COMPLETE 05/25/2021 05/25/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 04/09/2021 04/09/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 04/09/2021 04/09/2021
Note: Released By: JPI
ZON COMPLETE 04/09/2021 04/09/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/09/2021 04/12/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 04/09/2021 04/13/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
BLD COMPLETE 03/29/2021 04/02/2021
Note: Released By: JPI
CUSVC COMPLETE 03/29/2021 03/31/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 03/29/2021 03/30/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/29/2021 03/29/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
LOCATE COMPLETE 03/29/2021 03/31/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 03/29/2021 03/30/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be from 2020 7Th edition Code Cycle 2. Energy Calcs need to be signed by the builder
PLUM HOLD 03/29/2021 04/02/2021
Note: Held By: JPI Held By: JPI 1. DWV illustrates two showers. Plans illustrate one tub and one shower.
SW1 COMPLETE 03/29/2021 04/06/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 03/29/2021 04/06/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Left side front does not meet the minimum front setback of 25ft All windows facing the street (left side) must have banding
SWALE COMPLETE 03/29/2021 06/25/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤120.00 04/13/2021
WATER- TURN ON ¤50.00 04/13/2021
ADMIN FEE ¤20.00 04/13/2021
CONNECTION FEES ¤2,035.66 04/13/2021
BUILDING DISCOUNT 100% (¤1,901.00) 04/13/2021
ELECTRIC FEE ¤303.00 04/13/2021
3% FIRE IMPACT FEE CREDIT (¤22.02) 04/13/2021
IMPACT FEE FIRE ¤734.00 04/13/2021
IMPACT FEE PARKS ¤2,398.24 04/13/2021
IMPACT FEE SCHOOL ¤7,200.00 04/13/2021
IMPACT FEE TRANSPORTATION ¤2,666.00 04/13/2021
MECHANICAL FEE ¤303.00 04/13/2021
WATER -IRRIGATION INSPECTION ¤50.00 04/13/2021
3% PARKS IMPACT FEE CREDIT (¤71.95) 04/13/2021
PLAN CHECK FEE ¤162.00 04/13/2021
PLUMBING FEE ¤303.00 04/13/2021
NEW RESIDENTIAL INSPECTIONS ¤810.00 04/13/2021
SITE PLAN 20 ¤20.00 04/13/2021
SURCHARGE FS 533.721 ¤2.00 04/13/2021
SURCHARGE - FS 468.631 ¤2.00 04/13/2021
STORM WATER PERMIT FEES ¤80.00 04/13/2021
3% TRANS IMPACT FEE CREDIT (¤79.98) 04/13/2021
SEWER CREDIT (¤1,806.00) 04/13/2021
SEWER INSPECTION ¤25.00 04/13/2021
SEWER CAPITAL FACILITY ¤9,329.10 04/13/2021
WATER CAPITAL FACILITY FEE ¤6,848.90 04/13/2021
Fees Total Due: ¤0.00 Total Paid: ¤29,580.95