I want to search for...

Permit #2021031866

Permit Details

Status: COED

Parcel Id: 07-11-31-7012-00160-0550
CONDITIONED SPACE: 2130 sqft
GARAGE: 592 sqft
OPENED PORCH (WITH ROOF) : 199 sqft
OPENED PORCH (WITH ROOF) : 40 sqft
Total Square Footage: 2961 sqft
Block: 00160
Subdivision: 2187 - SECTION 12-BELLE TERRE
Job Phone: 321-610-3924
Location Address: 48 BASSETT LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/20/2021
NOC: RECORDED
Applicant name: KENNETH WAYNE CAMBELL JR
Owner: VINTAGE ESTATE HOMES LLC

Address

4885 N WICKHAM ROAD

MELBOURNE, FL 32940

Lot: 0550
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES PREMIER HOMES LLC
Status Location Address Mailing Address State License Number Phone
CANCEL

4885 N WICKHAM RD

MELBOURNE, FL 32940

SUITE 101

MELBOURNE, FL 32940

CBC058803 (Exp: 08/31/2022) 321-610-3924

Sub Contractors

THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/04/2022 FINAL APPROVED MKRASKI
U-CROSS CONNECTION 03/03/2022 APPROVED DHANEY
BLD - BUILDING FINAL 03/03/2022 Disapproved - NO FEE KSANDOE
Note: Energy calcs do not match installed equipment. Submit revision to Buildinig Department. Anti-tip bracket on stove not installed Garage door bucking anchors have been cut off to install garage door track Drain in owners shower not functioning.
U -UTILITY RESIDENTIAL FINAL 03/03/2022 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 02/24/2022 APPROVED KRUTH
ROW - STORMWATER FINAL 02/24/2022 APPROVED KRUTH
ROW - FINAL APRON (AFTER POUR) 02/24/2022 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 02/24/2022 APPROVED KRUTH
U - SEWER TIE IN 02/23/2022 APPROVED MGIBSON
Note: THIS IS A REINSPECTION SEWR TAP NOT MADE U-SEWER CONNECTION NOT READY
U - SEWER TIE IN 02/22/2022 CANCELLED BY APPLICANT WEB
U - SEWER TIE IN 02/22/2022 CANCELLED BY APPLICANT WEB
U - SEWER TIE IN 02/22/2022 Disapproved - NO FEE MGIBSON
Note: SEWR TAP NOT MADE U-SEWER CONNECTION NOT READY
ELECTRIC - EARLY POWER 02/16/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:00 am
ROW- PRE-APRON (PRE-POUR) 01/24/2022 APPROVED - AS NOTED KRUTH
Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
LATH/BRICK/ WATER BARRIER 12/07/2021 APPROVED FWILLIS
INSULATION 12/03/2021 APPROVED FWILLIS
ALL ROUGH 11/24/2021 APPROVED RMARTIN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/01/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION TRUSS G1 2 PLY CALLS FOR #203, THATS 2 HTS20'S CONNECTING TO COLUMN. PAGE S301 BEARING FRAME, 2 MSTA18'S MISSING AT HEADER. 11/1/21 - Items corrected.
ROOF VALLEY & METAL 10/28/2021 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/28/2021 Disapproved - NO FEE FWILLIS
Note: TRUSS G1 2 PLY CALLS FOR #203, THATS 2 HTS20'S CONNECTING TO COLUMN. PAGE S301 BEARING FRAME, 2 MSTA18'S MISSING AT HEADER.
FOUND SURVEY APPROVED (OFFICE) 09/02/2021 APPROVED TBAKER
TIE BEAM / LINTEL 09/01/2021 APPROVED FWILLIS
MONOLITHIC SLAB 08/02/2021 APPROVED RMARTIN
PLUMBING 1ST ROUGH UNDERGROUND 07/28/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 07/28/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 07/12/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH HOLD 03/04/2022 03/07/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs are not from subcontractor listed. Update subcontractor
ENGIN1 COMPLETE 09/02/2021 09/02/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/02/2021 09/02/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC COMPLETE 04/09/2021 04/09/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 04/09/2021 04/09/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 04/09/2021 04/13/2021
Note: Released By: HALEIGH HAND - -
SW1 COMPLETE 04/09/2021 04/14/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
SWALE COMPLETE 03/30/2021 06/25/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 03/29/2021 04/02/2021
Note: Released By: JPI
CUSVC HOLD 03/29/2021 03/31/2021
Note: Held By: HALEIGH HAND - - Please correct the utility application to reflect the correct parcel number.
ELEC HOLD 03/29/2021 03/30/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need to reference the 2017 NEC
ENGIN1 COMPLETE 03/29/2021 03/30/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
LOCATE COMPLETE 03/29/2021 03/31/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 03/29/2021 03/30/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from 2020 7Th edition code cycle
PLUM COMPLETE 03/29/2021 04/02/2021
Note: Released By: JPI
SW1 HOLD 03/29/2021 04/06/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM the right side of the lot need to drain down the property line and have a 2:1 slope to the vaccant . You can have a W swale down the left side but the right needs to be able to have a common swale for when the vaccant lot is built on review the stormwater checklist
ZON COMPLETE 03/29/2021 04/07/2021
Note: Released By: ESTELLE LENS - (386)986-2655 -
MECH PENDING

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 04/20/2021
WATER- TURN ON ¤25.00 04/20/2021
ADMIN FEE ¤20.00 04/20/2021
CONNECTION FEES ¤1,017.83 04/20/2021
BUILDING DISCOUNT 100% (¤20.00) 04/20/2021
ELECTRIC FEE ¤210.00 04/20/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 04/20/2021
IMPACT FEE FIRE ¤367.00 04/20/2021
IMPACT FEE PARKS ¤1,199.12 04/20/2021
IMPACT FEE SCHOOL ¤3,600.00 04/20/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 04/20/2021
MECHANICAL FEE ¤210.00 04/20/2021
WATER -IRRIGATION INSPECTION ¤25.00 04/20/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 04/20/2021
PLAN CHECK FEE ¤100.00 04/20/2021
PLUMBING FEE ¤210.00 04/20/2021
NEW RESIDENTIAL INSPECTIONS ¤500.00 04/20/2021
SITE PLAN 20 ¤20.00 04/20/2021
SURCHARGE FS 533.721 ¤11.50 04/20/2021
SURCHARGE - FS 468.631 ¤17.42 04/20/2021
STORM WATER PERMIT FEES ¤80.00 04/20/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 04/20/2021
SEWER CREDIT (¤1,146.51) 04/20/2021
SEWER INSPECTION ¤25.00 04/20/2021
SEWER CAPITAL FACILITY ¤4,664.55 04/20/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 04/20/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,239.84