I want to search for...

Permit #2021031930

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-00430-0260
CONDITIONED SPACE: 2129 sqft
GARAGE: 595 sqft
OPENED PORCH (WITH ROOF) : 41 sqft
OPENED PORCH (WITH ROOF) : 199 sqft
Total Square Footage: 2964 sqft
Block: 00430
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 321-610-3924
Location Address: 27 LANCASTER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/20/2021
NOC: RECORDED
Applicant name: KENNETH WAYNE CAMBELL JR
Owner: VINTAGE ESTATE HOMES LLC

Address

4885 N WICKHAM ROAD

MELBOURNE, FL 32940

Lot: 0260
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES PREMIER HOMES LLC
Status Location Address Mailing Address State License Number Phone
CANCEL

4885 N WICKHAM RD

MELBOURNE, FL 32940

SUITE 101

MELBOURNE, FL 32940

CBC058803 (Exp: 08/31/2022) 321-610-3924

Sub Contractors

ZACHARY PETER BOERA
Status Location Address State License Number Phone
CANCEL

7225 SANDSCOVE COURT, SUITE 1

WINTER PARK, FL 32792

CAC1817652 (Exp: 08/31/2022) 407-629-6920
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/10/2021 FINAL APPROVED DCUSHING
U-CROSS CONNECTION 10/28/2021 APPROVED DHANEY
U -UTILITY RESIDENTIAL FINAL 10/28/2021 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 10/27/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 10/27/2021 APPROVED KRUTH
ROW - FINAL APRON (AFTER POUR) 10/27/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 10/27/2021 APPROVED KRUTH
U - SEWER TIE IN 10/08/2021 APPROVED RMARTIN
ROW- PRE-APRON (PRE-POUR) 10/08/2021 APPROVED - AS NOTED KRUTH
Note: the pipe has more than 1 tenth of pitch it is out of tolerance pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 10/06/2021 Disapproved -FEE REQUIRED KRUTH
Note: THIS IS A REINSPECTION the pipe has more than 1 tenth of pitch it is out of tolerance
ROW- PRE-APRON (PRE-POUR) 10/04/2021 CANCELLED BY APPLICANT KRUTH
ROW- PRE-APRON (PRE-POUR) 10/01/2021 CANCELLED BY APPLICANT WEB
WINDOW NAILING 10/01/2021 Disapproved - NO FEE FWILLIS
Note: 10/1/21 - AUGUST 23RD INSULATION WAS PASSED AND A WINDOW INSPECTION ADDED. IT APPEARS CONTRACTOR DID NOT SCHEDULE A WINDOW INSPECTION AFTER HIS WINDOWS WERE DELIVERED AND INSTALLED AS HE WAS INSTRUCTED. HOUSE IS COMPLETE AND WINDOWS INSTALLED.
WINDOW NAILING 10/01/2021 APPROVED FWILLIS
ELECTRIC - EARLY POWER 09/29/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 9:45
ELECTRIC - EARLY POWER 09/28/2021 Disapproved - NO FEE RMARTIN
Note: ALL DOORS LOCKED, NEED ACCESS FOR INSPECTION
PEP TANK INSTALLATION REQUEST 09/03/2021 APPROVED CSTONE
INSULATION 08/23/2021 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION Contractors were notified April 30, 2021. TYVEK IS NOT THE PROPER SEALING. •At time of insulation inspection, window and door rough openings shall be covered by wood structural panels applied over the water resistive barrier and sufficiently fastened and sealed to prevent any water entry into the building AND in between exterior cladding materials and the wall surface. •If the inspector determines the panel attachment is inadequate, the insulation inspection will be failed with a correction to properly fasten, secure and seal the wood panel(s) and a re-inspection fee charged. 8/23/21 WILL ADD WINDOW NAILING INSPECTION TO PERMIT, WILL NEED TO SCHEDULE WHEN WINDOWS ARE INSTALLED
LATH/BRICK/ WATER BARRIER 08/20/2021 APPROVED FWILLIS
INSULATION 08/19/2021 Disapproved -FEE REQUIRED FWILLIS
Note: Contractors were notified April 30, 2021. TYVEK IS NOT THE PROPER SEALING. •At time of insulation inspection, window and door rough openings shall be covered by wood structural panels applied over the water resistive barrier and sufficiently fastened and sealed to prevent any water entry into the building AND in between exterior cladding materials and the wall surface. •If the inspector determines the panel attachment is inadequate, the insulation inspection will be failed with a correction to properly fasten, secure and seal the wood panel(s) and a re-inspection fee charged.
ALL ROUGH 08/16/2021 APPROVED - AS NOTED RMARTIN
Note: NEED TO HAVE PRESSURE ON WASHER GAUGE BY INSULATION, 5' HEAD IS OUT SIDE, ALSO IF DOORS AND WINDOWS ARE NOT IN AT INSULATION A WINDOW NAILING WILL NEED TO BE ADDED TO PERMIT
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/28/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION HTT5's NOT INSTALLED ON REAR BEARING WALL. FLOOR PLAN DETAIL SHEET MISSING. 7/22/21 - HTT5 MISSING ANCHOR BOLT ON BOTTOM, NO CONNECTING BOLT AT TOP PLATE AND NO NAILS.
ROOF VALLEY & METAL 07/23/2021 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/22/2021 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION HTT5's NOT INSTALLED ON REAR BEARING WALL. FLOOR PLAN DETAIL SHEET MISSING. 7/22/21 - HTT5 MISSING ANCHOR BOLT ON BOTTOM, NO CONNECTING BOLT AT TOP PLATE AND NO NAILS.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/20/2021 Disapproved - NO FEE FWILLIS
Note: HTT5's NOT INSTALLED ON REAR BEARING WALL. FLOOR PLAN DETAIL SHEET MISSING.
FOUND SURVEY APPROVED (OFFICE) 07/09/2021 APPROVED TBAKER
TIE BEAM / LINTEL 06/15/2021 APPROVED FWILLIS
MONOLITHIC SLAB 05/25/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION PERMIT NOT MATCHING PERMIT FOR THIS DWELLING. PLANS ARE FOR 4 LUCAS LN AND PAPER WORK IN THE CONSTRUCTION BOX IS FOR 4 LUCAS LN. PLANS DO NOT MATCH THE LAYOUT.
MONOLITHIC SLAB 05/24/2021 Disapproved -FEE REQUIRED FWILLIS
Note: PERMIT NOT MATCHING PERMIT FOR THIS DWELLING. PLANS ARE FOR 4 LUCAS LN AND PAPER WORK IN THE CONSTRUCTION BOX IS FOR 4 LUCAS LN. PLANS DO NOT MATCH THE LAYOUT.
GRAVITY SEWER TEST 05/20/2021 APPROVED - AS NOTED JGIBSON
Note: THIS WAS APPROVED WITH FIRST RUOGH PLUMBING ON 5/19/21
PLUMBING 1ST ROUGH UNDERGROUND 05/19/2021 APPROVED - AS NOTED JGIBSON
Note: FIRST ROUGH PLUMBING OK, ALSO GRAVITY SEWER APPROVED CALL FOR INSPECTION TOMMOROW 5/20/21
WATER METER INSTALLATION REQUEST 05/19/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 07/09/2021 07/09/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/09/2021 07/09/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 04/12/2021 04/12/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 04/12/2021 04/12/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 03/30/2021 04/05/2021
Note: Released By: JPI
CUSVC COMPLETE 03/30/2021 04/05/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 03/30/2021 03/31/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need to reference the 2017 NEC
ENGIN1 COMPLETE 03/30/2021 03/30/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
LOCATE COMPLETE 03/30/2021 04/06/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/30/2021 03/31/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 03/30/2021 04/05/2021
Note: Released By: JPI
SW1 COMPLETE 03/30/2021 04/07/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 03/30/2021 04/07/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Section and lot number swapped in description on site plan/survey
SWALE COMPLETE 03/30/2021 06/25/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 11/10/2021
SW ENG - FIELD SURVEY INSPECT ¤20.00 11/10/2021
SW ENG REINSPECTION 30 ¤30.00 11/10/2021
REINSPECTION FEE ¤40.00 11/10/2021
REINSPECTION FEE ¤40.00 11/10/2021
NEW RESIDENTIAL INSPECTIONS ¤540.00 04/20/2021
SITE PLAN 20 ¤20.00 04/20/2021
SURCHARGE FS 533.721 ¤2.00 04/20/2021
SURCHARGE - FS 468.631 ¤2.00 04/20/2021
METER - DEPOSIT ¤60.00 04/20/2021
WATER- TURN ON ¤25.00 04/20/2021
ADMIN FEE ¤20.00 04/20/2021
STORM WATER PERMIT FEES ¤80.00 04/20/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 04/20/2021
SEWER CREDIT (¤1,147.00) 04/20/2021
SEWER INSPECTION ¤25.00 04/20/2021
SEWER CAPITAL FACILITY ¤4,664.55 04/20/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 04/20/2021
CONNECTION FEES ¤1,017.83 04/20/2021
BUILDING DISCOUNT 100% (¤1,334.00) 04/20/2021
ELECTRIC FEE ¤222.00 04/20/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 04/20/2021
IMPACT FEE FIRE ¤367.00 04/20/2021
IMPACT FEE PARKS ¤1,199.12 04/20/2021
IMPACT FEE SCHOOL ¤3,600.00 04/20/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 04/20/2021
MECHANICAL FEE ¤222.00 04/20/2021
WATER -IRRIGATION INSPECTION ¤25.00 04/20/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 04/20/2021
PLAN CHECK FEE ¤108.00 04/20/2021
PLUMBING FEE ¤222.00 04/20/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,154.43