I want to search for...
Permit #2021040476
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01470-0070 |
| CONDITIONED SPACE: 2430 sqft |
| GARAGE: 699 sqft |
| OPENED PORCH (WITH ROOF) : 504 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| Total Square Footage: 3729 sqft |
| Block: 01470 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-627-0430 |
| Location Address: 147 ERIC DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/19/2021 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: RUSSO ANNETTE EMILY TRUSTEE |
|
Address 1341 HAYTON AVE DELAND, FL 32724 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/10/2021 | FINAL APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION The washer outlet needs to be GFIC protected The extra water line in the utility sink cabinet needs to have shut off valve remove and capped off The hot and cold water are reversed at the sink in the back bath near the lanai. Seal the wall and the ceiling in the garage where the duct. Have garage door installation paper work on site to verify track attachment to p.t. blocking. | |||
| BLD - BUILDING FINAL | 12/09/2021 | Disapproved - NO FEE | JWALKER |
| Note: The washer outlet needs to be GFIC protected The extra water line in the utility sink cabinet needs to have shut off valve remove and capped off The hot and cold water are reversed at the sink in the back bath near the lanai. Seal the wall and the ceiling in the garage where the duct. Have garage door installation paper work on site to verify track attachment to p.t. blocking. | |||
| U-CROSS CONNECTION | 12/07/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/07/2021 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 12/06/2021 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/06/2021 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 12/06/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 12/06/2021 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 11/19/2021 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC - EARLY POWER | 11/19/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:55 am | |||
| ROW- PRE-APRON (PRE-POUR) | 10/15/2021 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| U - SEWER TIE IN | 09/07/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 09/07/2021 | APPROVED | JGIBSON |
| INSULATION | 08/26/2021 | APPROVED | JPI |
| PEP TANK INSTALLATION REQUEST | 08/24/2021 | APPROVED | CSTONE |
| ALL ROUGH | 08/18/2021 | APPROVED | TSTAUFFACHER |
| LATH/BRICK/ WATER BARRIER | 08/17/2021 | APPROVED | JPI |
| ROOF VALLEY & METAL | 08/17/2021 | APPROVED | JPI |
| ELECTRIC-TUG | 07/20/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL 8:15 am | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/15/2021 | APPROVED - AS NOTED | JWALKER |
| Note: THIS IS A REINSPECTION Girder truss t-25 Missing MGT and MG2 anchor hold downs Garage bering wall detail at truss T-O1 is not shown. Truss T35 and T36 the heta straps are not embedded in the CMU mortar submitt a revision for a fix. Trusses To5 and To6 the engineering webbing is placed the wrong way. Submitt an engineering revision. Girder truss T34 and T23 call for HTT22 hold downs MGT were used submitt a revision for change or install proper holddowns. 7/15/21 Revised drawing Sheet 10 Knee wall detail. Knee wall is missing 48 o.c. all thread. Install per detail. The bearing wall point detail is not showing the bottom of 2x4 connection. please up date detail. That detail also states compression system all thread at 6' O.C. Install all thread at 6' o..c | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/06/2021 | Disapproved - NO FEE | JWALKER |
| Note: Girder truss t-25 Missing MGT and MG2 anchor hold downs Garage bering wall detail at truss T-O1 is not shown. Truss T35 and T36 the heta straps are not embedded in the CMU mortar submitt a revision for a fix. Trusses To5 and To6 the engineering webbing is placed the wrong way. Submitt an engineering revision. Girder truss T34 and T23 call for HTT22 hold downs MGT were used submitt a revision for change or install proper holddowns. The Cripple wall at front entry no detail is provided in the prints please povide a detail showing anchor downs and framing. strapping if any this area is consider a shear wall. Roof sheating passed inspection ok to cover. | |||
| TIE BEAM / LINTEL | 06/18/2021 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 06/15/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/27/2021 | APPROVED | TSTAUFFACHER |
| Note: SUPER NOTES: Island conduit missing | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/24/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED TO REMOVE STUMP IN FOOTER AREA BY SUMMER KITCHEN. '' IN EXTERIOR FOOTER !!! '' | |||
| WATER METER INSTALLATION REQUEST | 05/03/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| CUSVC | COMPLETE | 10/04/2021 | 10/06/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| BLD | COMPLETE | 07/08/2021 | 07/14/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/15/2021 | 06/15/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/15/2021 | 06/15/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 06/14/2021 | 06/14/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM rename to foundation survey | |||
| BADMIN | COMPLETE | 06/14/2021 | 06/14/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/19/2021 | 05/26/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision - modification of master bathroom & dining room. | |||
| ZON | COMPLETE | 05/19/2021 | 05/19/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Revision does not appear to have any exterior changes. | |||
| MECH | COMPLETE | 04/16/2021 | 04/16/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/16/2021 | 04/19/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/16/2021 | 04/16/2021 |
| Note: Released By: JPI | |||
| BLD | HOLD | 04/09/2021 | 04/15/2021 |
| Note: Held By: JPI 1. Provide design loads, live and dead. | |||
| CUSVC | COMPLETE | 04/09/2021 | 04/12/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 04/09/2021 | 04/12/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlet on front of the house. NEC 2017 210.52 (E) (1) | |||
| ENGIN1 | COMPLETE | 04/09/2021 | 04/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/09/2021 | 04/15/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/09/2021 | 04/12/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Orientation of heatload does not match the site plan. Revise to match the site plan | |||
| PLUM | COMPLETE | 04/09/2021 | 04/15/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 04/09/2021 | 04/13/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/09/2021 | 04/14/2021 |
| Note: Released By: ESTELLE LENS - (386)986-2655 - | |||
| SWALE | COMPLETE | 04/09/2021 | 09/28/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 12/07/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/07/2021 |
| METER - DEPOSIT | ¤60.00 | 12/07/2021 |
| WATER-METER | ¤441.07 | 12/07/2021 |
| WATER- TURN ON | ¤25.00 | 12/07/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 12/07/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/19/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 04/19/2021 |
| SEWER CREDIT | (¤850.00) | 04/19/2021 |
| SEWER INSPECTION | ¤25.00 | 04/19/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 04/19/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 04/19/2021 |
| WATER- TURN ON | ¤25.00 | 04/19/2021 |
| ADMIN FEE | ¤20.00 | 04/19/2021 |
| CONNECTION FEES | ¤1,017.83 | 04/19/2021 |
| METER - DEPOSIT | ¤60.00 | 04/19/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 04/19/2021 |
| PLAN CHECK FEE | ¤129.20 | 04/19/2021 |
| PLUMBING FEE | ¤253.80 | 04/19/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤646.00 | 04/19/2021 |
| SITE PLAN 20 | ¤20.00 | 04/19/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 04/19/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 04/19/2021 |
| BUILDING DISCOUNT 100% | (¤1,556.60) | 04/19/2021 |
| ELECTRIC FEE | ¤253.80 | 04/19/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 04/19/2021 |
| IMPACT FEE FIRE | ¤367.00 | 04/19/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 04/19/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/19/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 04/19/2021 |
| MECHANICAL FEE | ¤253.80 | 04/19/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/19/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,892.50 |