I want to search for...
Permit #2021040483
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00860-0040 |
| CONDITIONED SPACE: 2552 sqft |
| GARAGE: 634 sqft |
| OPENED PORCH (WITH ROOF) : 275 sqft |
| OPENED PORCH (WITH ROOF) : 35 sqft |
| Total Square Footage: 3496 sqft |
| Block: 00860 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 321-610-3924 |
| Location Address: 119 EVANS DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/04/2021 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMBELL JR |
| Owner: VINTAGE ESTATE HOMES LLC |
|
Address 4885 NORTH WICKHAM RD MELBOURNE, FL 32940 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
SUITE 101 MELBOURNE, FL 32940 |
CBC058803 (Exp: 08/31/2022) | 321-610-3924 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
ZACHARY PETER BOERA
| Status | Location Address | State License Number | Phone |
| CANCEL |
7225 SANDSCOVE COURT, SUITE 1 WINTER PARK, FL 32792 |
CAC1817652 (Exp: 08/31/2022) | 407-629-6920 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/28/2022 | FINAL APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Exterior outlets need to have waterproof boxes and water resistant outlets. Front entry light fixture not installed Support the expansion overflow pvc line at the water heater. Seal the penetrations going through the garage ceiling. The duct for the stove hood needs to be sealed. The ceiling where the duct penetrates needs to also be sealed. Please leave the finish cover off for reinspection. Seal the hole in the HVAC closet. Master tub tile has not been grouted. 1/26/22 Exterior outlets and covers have not been correct. One penetration at garage ceiling not sealed. | |||
| BLD - BUILDING FINAL | 01/27/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION Exterior outlets need to have waterproof boxes and water resistant outlets. Front entry light fixture not installed Support the expansion overflow pvc line at the water heater. Seal the penetrations going through the garage ceiling. The duct for the stove hood needs to be sealed. The ceiling where the duct penetrates needs to also be sealed. Please leave the finish cover off for reinspection. Seal the hole in the HVAC closet. Master tub tile has not been grouted. 1/27/22 The exterior outlet next to the A/C condensor has not been changed to a Tamper resistant, Water resistant outlet the, The front entry and to rear outlets were corrected The ceiling penetration in the garage has not been corrected. | |||
| BLD - BUILDING FINAL | 01/26/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION Exterior outlets need to have waterproof boxes and water resistant outlets. Front entry light fixture not installed Support the expansion overflow pvc line at the water heater. Seal the penetrations going through the garage ceiling. The duct for the stove hood needs to be sealed. The ceiling where the duct penetrates needs to also be sealed. Please leave the finish cover off for reinspection. Seal the hole in the HVAC closet. Master tub tile has not been grouted. | |||
| BLD - BUILDING FINAL | 01/26/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION Exterior outlets need to have waterproof boxes and water resistant outlets. Front entry light fixture not installed Support the expansion overflow pvc line at the water heater. Seal the penetrations going through the garage ceiling. The duct for the stove hood needs to be sealed. The ceiling where the duct penetrates needs to also be sealed. Please leave the finish cover off for reinspection. Seal the hole in the HVAC closet. Master tub tile has not been grouted. 1/26/22 Exterior outlets and covers have not been correct. One penetration at garage ceiling not sealed. | |||
| BLD - BUILDING FINAL | 01/25/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 01/25/2022 | Disapproved - NO FEE | JWALKER |
| Note: Exterior outlets need to have waterproof boxes and water resistant outlets. Front entry light fixture not installed Support the expansion overflow pvc line at the water heater. Seal the penetrations going through the garage ceiling. The duct for the stove hood needs to be sealed. The ceiling where the duct penetrates needs to also be sealed. Please leave the finish cover off for reinspection. Seal the hole in the HVAC closet. Master tub tile has not been grouted. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/25/2022 | FINAL APPROVED | JHARDING |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 01/24/2022 | CANCELLED BY APPLICANT | JHARDING |
| BLD - BUILDING FINAL | 01/24/2022 | CANCELLED BY APPLICANT | JWALKER |
| U-CROSS CONNECTION | 01/24/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/20/2022 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/20/2022 | APPROVED | RGROSS |
| Note: See note on Final Stormwater. | |||
| ROW - STORMWATER FINAL | 01/20/2022 | APPROVED - AS NOTED | RGROSS |
| Note: Per builder. Sod is scheduled today to be thrown on all bare earth areas. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/20/2022 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 01/14/2022 | APPROVED | GBERTOLA |
| Note: THIS IS A REINSPECTION Culvert elevation is good. However, large 15 x 8 ft high pile of dirt in the pour area from an ongoing pep tank installation. Must reschedule to verify it is all removed and recompacted. 01/14/2022=THIS INSPECTION WAS PASS ON 12/14/2021 | |||
| TUB SET | 12/20/2021 | CANCELLED BY APPLICANT | WEB |
| TUB SET | 12/20/2021 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 12/17/2021 | APPROVED - AS NOTED | JWALKER |
| Note: Email FPL 1:22 pm | |||
| U - SEWER TIE IN | 12/15/2021 | APPROVED | JWALKER |
| ROW- PRE-APRON (PRE-POUR) | 12/14/2021 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION Culvert elevation is good. However, large 15 x 8 ft high pile of dirt in the pour area. Must reschedule to verify it is all removed and recompacted. 12/14/21 - Bolts for the band should face down or be cut off below the top elevation of the rounded culvert for maximum concrete thickness. Being approved as noted that they should be cut before pouring. Thickness of concrete will still be over 5 inches. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/13/2021 | Disapproved - NO FEE | RGROSS |
| Note: Culvert elevation is good. However, large 15 x 8 ft high pile of dirt in the pour area from an ongoing pep tank installation. Must reschedule to verify it is all removed and recompacted. | |||
| LATH/BRICK/ WATER BARRIER | 11/15/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Metal lath needs to be attached 7" o.c. vertically and horizontally. ASTM C1063 or C1787 R-703.7.1 10/22/21 Above corrections have not been made. 10/26/21 Please have above corrections made before calling in this inspection. 10/28/21 The lath needs to be fastened at 7" o.c. vertically and horizontally Suggest a meeting with contractor. 11/3/21 It has been determined by the building offical that the staples fastened as per ASTM C1063 are sufficent being fastened to the 16" o.c. framing members spaced at 7" apart. The metal lath fasteners installed at the gable ends are not spaced at 16" o.c. and are not fastened to framing members The reason for this is the gable end wall framing is 2' o.c. Have engineer submitt a letter stating as is fastening is a sufficent. Or install framing members at 16" o.c. and install lath fasteners as per ASTM C1063. | |||
| LATH/BRICK/ WATER BARRIER | 11/03/2021 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Metal lath needs to be attached 7" o.c. vertically and horizontally. ASTM C1063 or C1787 R-703.7.1 10/22/21 Above corrections have not been made. 10/26/21 Please have above corrections made before calling in this inspection. 10/28/21 The lath needs to be fastened at 7" o.c. vertically and horizontally Suggest a meeting with contractor. 11/3/21 It has been determined by the building offical that the staples fastened as per ASTM C1063 are sufficent being fastened to the 16" o.c. framing members spaced at 7" apart. The metal lath fasteners installed at the gable ends are not spaced at 16" o.c. and are not fastened to framing members The reason for this is the gable end wall framing is 2' o.c. Have engineer submitt a letter stating as is fastening is a sufficent. Or install framing members at 16" o.c. and install lath fasteners as per ASTM C1063. | |||
| LATH/BRICK/ WATER BARRIER | 10/28/2021 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Metal lath needs to be attached 7" o.c. vertically and horizontally. ASTM C1063 or C1787 R-703.7.1 10/22/21 Above corrections have not been made. 10/26/21 Please have above corrections made before calling in this inspection. 10/28/21 The lath needs to be fastened at 7" o.c. vertically and horizontally Suggest a meeting with contractor. | |||
| LATH/BRICK/ WATER BARRIER | 10/26/2021 | Disapproved -FEE REQUIRED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Metal lath needs to be attached 7" o.c. vertically and horizontally. ASTM C1063 or C1787 R-703.7.1 10/22/21 Above corrections have not been made. 10/26/21 Please have above corrections made before calling in this inspection. | |||
| LATH/BRICK/ WATER BARRIER | 10/22/2021 | Disapproved -FEE REQUIRED | JWALKER |
| Note: THIS IS A REINSPECTION Metal lath needs to be attached 7" o.c. vertically and horizontally. ASTM C1063 or C1787 R-703.7.1 10/22/21 Above corrections have not been made. | |||
| PEP TANK INSTALLATION REQUEST | 10/21/2021 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 10/19/2021 | Disapproved - NO FEE | JWALKER |
| Note: Metal lath needs to be attached 7" o.c. vertically and horizontally. ASTM C1063 or C1787 R-703.7.1 | |||
| INSULATION | 10/18/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 10/15/21 As noted in the all rough inspection. The metal stud framing needs to grounded. And due to the non continuty of the framing each seprate area of the metal stud walls will need to be grounded.. Ground the HVAC , Dryer ,Water heater etc. 10/18/21 Cheif Building offical stated grounding of interior light gauge metal studs to electrical system is not necessary. | |||
| INSULATION | 10/15/2021 | Disapproved -FEE REQUIRED | JWALKER |
| Note: THIS IS A REINSPECTION 10/15/21 As noted in the all rough inspection. The metal stud framing needs to grounded. And due to the non continuty of the framing each seprate area of the metal stud walls will need to be grounded.. Ground the HVAC , Dryer ,Water heater etc. | |||
| INSULATION | 10/14/2021 | CANCELLED BY APPLICANT | JWALKER |
| INSULATION | 10/06/2021 | CANCELLED BY INSPECTOR | JWALKER |
| Note: Ground wire to UFER not installed. All metal framing needs to be bonded. All separate metal framing needs to be bonded due to the breaks in the framing. Missing bonding wire at Air Handler. Fill 5' head test. | |||
| ALL ROUGH | 10/06/2021 | APPROVED - AS NOTED | JWALKER |
| Note: Ground wire to UFER not installed. All metal framing needs to be bonded. All separate metal framing needs to be bonded due to the breaks in the framing. Missing bonding wire at Air Handler. Fill 5' head test. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/19/2021 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 08/19/2021 | APPROVED | TSTAUFFACHER |
| TIE BEAM / LINTEL | 07/14/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Multiple bar do not meet clearance, marked on plans Bar on right side of home easily removed by hand// epoxy set not compliant with manufactures specs | |||
| TIE BEAM / LINTEL | 07/13/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Multiple bar do not meet clearance, marked on plans Bar on right side of home easily removed by hand// epoxy set not compliant with manufactures specs R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Minimum cover for reinforcement in concrete cast in removable forms that will be exposed to the earth or weather shall be 11/2 inches (38 mm) for No. 5 bars and smaller, and 2 inches (50 mm) for No. 6 bars and larger. For concrete cast in removable forms that will not be exposed to the earth or weather, and for concrete cast in stay-in-place forms, minimum cover shall be 3/4 inch (19 mm). The minus tolerance for cover shall not exceed the smaller of one-third the required cover or 3/8 inch (10 mm). | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/22/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/08/2021 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/03/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 06/03/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 05/19/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 12/28/2021 | 12/28/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/22/2021 | 06/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/22/2021 | 06/22/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/27/2021 | 04/28/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/23/2021 | 04/26/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Need to change subcontractor to match Energy calcs submitted. | |||
| ZON | COMPLETE | 04/23/2021 | 04/26/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/21/2021 | 04/21/2021 |
| Note: Released By: JOHN BODEN - (386)986-2624 - JBODEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/09/2021 | 04/15/2021 |
| Note: 1. Knee wall detail, #0180, page S301, does not call out stud spacing. Please clarify. 2. Provide door and window schedule. 3. Provide wall sheathing nailing patterns. Include size, type of fastener. | |||
| CUSVC | COMPLETE | 04/09/2021 | 04/13/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 04/09/2021 | 04/12/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/09/2021 | 04/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/09/2021 | 04/14/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/09/2021 | 04/12/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from 2020 7Th edition code cycle | |||
| PLUM | COMPLETE | 04/09/2021 | 04/15/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 04/09/2021 | 04/13/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/09/2021 | 04/14/2021 |
| Note: Held By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM Please have surveyor move the elevations that are covering the house setbacks on the site plan. | |||
| SWALE | COMPLETE | 04/09/2021 | 07/06/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/31/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2022 |
| CONNECTION FEES | ¤1,017.83 | 05/04/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 05/04/2021 |
| BUILDING DISCOUNT 100% | (¤1,552.40) | 05/04/2021 |
| ELECTRIC FEE | ¤253.20 | 05/04/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/04/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/04/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/04/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/04/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 05/04/2021 |
| MECHANICAL FEE | ¤253.20 | 05/04/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/04/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/04/2021 |
| PLAN CHECK FEE | ¤128.80 | 05/04/2021 |
| PLUMBING FEE | ¤253.20 | 05/04/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤644.00 | 05/04/2021 |
| SITE PLAN 20 | ¤20.00 | 05/04/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/04/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/04/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/04/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 05/04/2021 |
| SEWER CREDIT | (¤2,465.75) | 05/04/2021 |
| SEWER INSPECTION | ¤25.00 | 05/04/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 05/04/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 05/04/2021 |
| METER - DEPOSIT | ¤60.00 | 05/04/2021 |
| WATER- TURN ON | ¤25.00 | 05/04/2021 |
| ADMIN FEE | ¤20.00 | 05/04/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,898.18 |