Permit #2021040755
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00220-0010 |
| CONDITIONED SPACE: 1601 sqft |
| GARAGE: 391 sqft |
| OPENED PORCH (WITH ROOF) : 131 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| Total Square Footage: 2165 sqft |
| Block: 00220 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 904-667-3599 |
| Location Address: 8 PINE COTTAGE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/16/2021 |
| NOC: RECORDED |
| Applicant name: TONY S JACKSON |
| Owner: 3DRE LLC |
|
Address 6821 SOUTHPOINT DR N #129 JACKSONVILLE , FL 32216 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
T-DAWG CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
6821 SOUTH POINT DR N NEPTUNE , FL 32266 |
CGC1523419 (Exp: 08/31/2024) | 904-667-3599 |
Sub Contractors
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
JACK RICHARD SHEKIRA
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1833 LIVE OAK DR JACKSONVILLE, FL 32246 |
CCC048193 (Exp: 08/31/2026) | 904-725-4089 |
DUANE MCDANIEL
| Status | Location Address | Phone |
| INACTIVE |
PO BOX 1998 BUNNELL, FL 32110 |
(386)437-4393 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 06/29/2022 | APPROVED | PFLANAGAN |
| Note: THIS IS A REINSPECTION 05/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE New inspection due to canceled inspection THIS IS A REINSPECTION 05/16/22=SWALE ON THE RIGHT SIDE IS HIGHER, SWALE ON THE NEIGHBORING IS LOWER SWALE NEED TO BE MATCH EXISTING GRADE AT EACH PROPERTY LINE WATER FLOW FROM THE RIGHT TO THE LEFT . ------------------------------------------------------------------------------------------------------------------------------- (1) NEED TO CLEAN ALL DIRT AND CONCRETE FROM CULVERT PIPE (2) NEED TO CLEAN ALL TRASH ON LEFT SIDE OF HOUSE IN THE EASEMENT AND PROPERTY (3) NEED TO SOD AREA WHERE PORTER JOHN WAS | |||
| ROW- PROJECT STATUS | 06/01/2022 | APPROVED | GBERTOLA |
| Note: MEETING WITH THE CM | |||
| ROW - STORMWATER FINAL | 05/19/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 05/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE New inspection due to canceled inspection THIS IS A REINSPECTION 05/16/22=SWALE ON THE RIGHT SIDE IS HIGHER, SWALE ON THE NEIGHBORING IS LOWER SWALE NEED TO BE MATCH EXISTING GRADE AT EACH PROPERTY LINE WATER FLOW FROM THE RIGHT TO THE LEFT . ------------------------------------------------------------------------------------------------------------------------------- (1) NEED TO CLEAN ALL DIRT AND CONCRETE FROM CULVERT PIPE (2) NEED TO CLEAN ALL TRASH ON LEFT SIDE OF HOUSE IN THE EASEMENT AND PROPERTY (3) NEED TO SOD AREA WHERE PORTER JOHN WAS | |||
| ROW - STORMWATER FINAL | 05/17/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION 05/16/22=SWALE ON THE RIGHT SIDE IS HIGHER, SWALE ON THE NEIGHBORING IS LOWER SWALE NEED TO BE MATCH EXISTING GRADE AT EACH PROPERTY LINE WATER FLOW FROM THE RIGHT TO THE LEFT . ------------------------------------------------------------------------------------------------------------------------------- (1) NEED TO CLEAN ALL DIRT AND CONCRETE FROM CULVERT PIPE (2) NEED TO CLEAN ALL TRASH ON LEFT SIDE OF HOUSE IN THE EASEMENT AND PROPERTY (3) NEED TO SOD AREA WHERE PORTER JOHN WAS | |||
| ROW - STORMWATER FINAL | 05/16/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: 05/16/22=SWALE ON THE RIGHT SIDE IS HIGHER, SWALE ON THE NEIGHBORING IS LOWER SWALE NEED TO BE MATCH EXISTING GRADE AT EACH PROPERTY LINE WATER FLOW FROM THE RIGHT TO THE LEFT . ------------------------------------------------------------------------------------------------------------------------------- (1) NEED TO CLEAN ALL DIRT AND CONCRETE FROM CULVERT PIPE (2) NEED TO CLEAN ALL TRASH ON LEFT SIDE OF HOUSE IN THE EASEMENT AND PROPERTY (3) NEED TO SOD AREA WHERE PORTER JOHN WAS | |||
| U -UTILITY RESIDENTIAL FINAL | 05/16/2022 | FINAL APPROVED | LFITZGERALD |
| ROW- PROJECT STATUS | 05/16/2022 | APPROVED | GBERTOLA |
| Note: MEETING WITH LEMON GRADING GUY | |||
| BLD - BUILDING FINAL | 05/13/2022 | Approval - Private Provider | PPROVIDER |
| ROW - FINAL APRON (AFTER POUR) | 05/11/2022 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 05/11/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: (1) NEED TO CLEAN ALL DIRT AND CONCRETE FROM CULVERT PIPE (2) NEED TO CLEAN ALL TRASH ON LEFT SIDE OF HOUSE IN THE EASEMENT AND PROPERTY (3) NEED TO SOD AREA WHERE PORTER JOHN WAS | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/06/2022 | APPROVED | GBERTOLA |
| FINAL SURVEY (OFFICE USE ONLY) | 05/06/2022 | APPROVED | GBERTOLA |
| ELECTRIC - EARLY POWER | 04/14/2022 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 03/21/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| U-CROSS CONNECTION | 03/16/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| U - SEWER TIE IN | 03/16/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 02/28/2022 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 01/26/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 1/14/2022 3:19:33 PM Interior & Exterior (sheet rock hung, stucco or siding not installed | |||
| PEP TANK INSTALLATION REQUEST | 01/14/2022 | Disapproved - NO FEE | CSTONE |
| Note: Interior & Exterior (sheet rock hung, stucco or siding not installed | |||
| INSULATION | 01/12/2022 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 01/05/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/01/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 12/01/2021 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 11/05/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/18/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/11/2021 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 09/06/2021 | PARTIALLY APPROVED | GBERTOLA |
| Note: 09/07/2021= NEED TO REMOVE THE OLD TIRE ON THE LEFT SIDE OF THE SWALE AND THE REBAR INSPECTOR BE BACK ON 09/14/2021 | |||
| PROJECT STATUS (OFFICE USE) | 08/30/2021 | PARTIALLY APPROVED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots Section 105.7 Placement of permit. The building permit or copy shall be kept until the completion of the project. Section 107.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative 08/23/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE needto record the NOC IS NOT ON THE SYSTEM INSPECTOR BE BACK ON 8/25/2021 08/30/2021= Section 105.7 Placement of permit. The building permit or copy shall be kept until the completion of the project. Section 107.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative inspector be back on =09/06/2021 | |||
| WATER METER INSTALLATION REQUEST | 08/24/2021 | APPROVED | CSTONE |
| PROJECT STATUS (OFFICE USE) | 08/23/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: THIS IS A REINSPECTION BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots Section 105.7 Placement of permit. The building permit or copy shall be kept until the completion of the project. Section 107.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative 08/23/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE needto record the NOC IS NOT ON THE SYSTEM INSPECTOR BE BACK ON 8/25/2021 | |||
| PROJECT STATUS (OFFICE USE) | 08/16/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots Section 105.7 Placement of permit. The building permit or copy shall be kept until the completion of the project. Section 107.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative need to record the NOC ASAP THIS INSPECTION IS FOR DRAINAGE INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | HOLD | 05/10/2022 | 05/10/2022 |
| Note: Held By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM termite protection uploaded does not have the required verbage by the state. LM | |||
| BADMIN | COMPLETE | 05/10/2022 | 05/10/2022 |
| Note: Released By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/05/2021 | 11/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/05/2021 | 11/05/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/22/2021 | 04/22/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/22/2021 | 04/28/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 04/21/2021 | 04/21/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/14/2021 | 04/16/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/14/2021 | 04/20/2021 |
| Note: Held By: JPI 1. Missing items from PA spec sheet: rear french doors. 2. Provide details for dwelling-garage fire separation. | |||
| CUSVC | COMPLETE | 04/14/2021 | 04/19/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 04/14/2021 | 04/14/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/14/2021 | 04/14/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/14/2021 | 04/19/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/14/2021 | 04/15/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Square footage on energy calcs does not match house plans. Revise to match | |||
| SWALE | COMPLETE | 04/14/2021 | 07/12/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/23/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/13/2022 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 05/13/2022 |
| REINSPECTION FEE | ¤40.00 | 05/13/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/13/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/16/2021 |
| METER - DEPOSIT | ¤60.00 | 08/16/2021 |
| WATER- TURN ON | ¤25.00 | 08/16/2021 |
| ADMIN FEE | ¤20.00 | 08/16/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤402.00 | 08/16/2021 |
| SITE PLAN 20 | ¤20.00 | 08/16/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/16/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/16/2021 |
| CONNECTION FEES | ¤1,017.83 | 08/16/2021 |
| BUILDING DISCOUNT 100% | (¤1,044.20) | 08/16/2021 |
| ELECTRIC FEE | ¤180.60 | 08/16/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 08/16/2021 |
| IMPACT FEE FIRE | ¤367.00 | 08/16/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 08/16/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/16/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 08/16/2021 |
| MECHANICAL FEE | ¤180.60 | 08/16/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/16/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 08/16/2021 |
| PLAN CHECK FEE | ¤80.40 | 08/16/2021 |
| PLUMBING FEE | ¤180.60 | 08/16/2021 |
| REINSPECTION FEE | ¤40.00 | 08/16/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/16/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 08/16/2021 |
| SEWER CREDIT | (¤1,147.00) | 08/16/2021 |
| SEWER INSPECTION | ¤25.00 | 08/16/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 08/16/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 08/16/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,369.43 |