I want to search for...

Permit #2021040887

Permit Details

Status: COED

Parcel Id: 07-11-31-7030-00090-0040
CONDITIONED SPACE: 1824 sqft
GARAGE: 663 sqft
OPENED PORCH (WITH ROOF) : 371 sqft
OPENED PORCH (WITH ROOF) : 31 sqft
Total Square Footage: 2889 sqft
Block: 00090
Subdivision: 2154 - SECTION 30-ROYAL PALMS
Job Phone: 386-447-4151
Location Address: 25 RAEMOND LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/30/2021
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: WERTZ VICKI LANETTE & PENNY SUE MARKULIS AMC

Address

30 ROLLER LN

PALM COAST, FL 32164

Lot: 0040
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
KERRY DWAIN AYLESWORTH II
Status Location Address Mailing Address State License Number Phone
ACTIVE

2820 LEWIS SPEEDWAY

ST AUGUSTINE, FL 32084

STE B

ST AUGUSTINE, FL 32084

CAC1820713 (Exp: 08/31/2026) 904-342-5709

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/24/2023 FINAL APPROVED JWALKER
Note: 1/23/2023 - PREVIOUS INSPECTION NOTES 1/20/2023 - PREVIOUS INSPECTION NOTES 1. The flex duct in the garage attic at the fresh air intake fan need to be sealed both sides. 2. The exterior outlet and dissconnect for the Heat Pump need to be in readily accessible location. Move the Heat pump of the outlet. 3. Outlet under the sink needs to be readily accessible. 1/23/23 Sink under outlet not corrected.
BLD - BUILDING FINAL 01/23/2023 Disapproved - NO FEE JWALKER
Note: 1/20/2023 - PREVIOUS INSPECTION NOTES 1. The flex duct in the garage attic at the fresh air intake fan need to be sealed both sides. 2. The exterior outlet and dissconnect for the Heat Pump need to be in readily accessible location. Move the Heat pump of the outlet. 3. Outlet under the sink needs to be readily accessible. 1/23/23 Sink under outlet not corrected.
ROW - STORMWATER FINAL 01/23/2023 APPROVED GBERTOLA
Note: 01/23/23=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/20/2023 - PREVIOUS INSPECTION NOTES 01/20/23= NEED TO MATCH EXISTING GRADE AT EACH PROPERTY LINE, WATER FLOW FROM THE RIGHT TO THE LEFT .CHECK SWALE PLAN DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 01/19/23=NEED TO MATCH EXISTING GRADE AT EACH PROPERTY LINE, WATER FLOW FROM THE RIGHT TO THE LEFT .CHECK SWALE PLAN DETAIL. ON THE LEFT SIDE PROPERTY LINE SWALE NEED TO RAISED.
U -UTILITY RESIDENTIAL FINAL 01/20/2023 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 01/20/2023 APPROVED GBERTOLA
Note: 01/20/23= correction were made AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 01/19/23=NEED TO MATCH EXISTING GRADE AT EACH PROPERTY LINE, WATER FLOW FROM THE RIGHT TO THE LEFT .CHECK SWALE PLAN DETAIL. ON THE LEFT SIDE PROPERTY LINE SWALE NEED NEED TO RAISED. NEED EXPANSION JOINT CUT DOWN THE CENTER AND LENGTH OF THE PIPE.
ROW - STORMWATER FINAL 01/20/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: 01/20/23= NEED TO MATCH EXISTING GRADE AT EACH PROPERTY LINE, WATER FLOW FROM THE RIGHT TO THE LEFT .CHECK SWALE PLAN DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 01/19/23=NEED TO MATCH EXISTING GRADE AT EACH PROPERTY LINE, WATER FLOW FROM THE RIGHT TO THE LEFT .CHECK SWALE PLAN DETAIL. ON THE LEFT SIDE PROPERTY LINE SWALE NEED TO RAISED.
U-CROSS CONNECTION 01/20/2023 APPROVED - AS NOTED LFITZGERALD
Note: has potable irrigation with PVB installed-no cross connection Also has irrigation meter that is not connected and will not be used-spoke with Gene to have it removed.
BLD - BUILDING FINAL 01/20/2023 Disapproved - NO FEE JWALKER
Note: 1. The flex duct in the garage attic at the fresh air intake fan need to be sealed both sides. 2. The exterior outlet and dissconnect for the Heat Pump need to be in readily accessible location. Move the Heat pump of the outlet. 3. Outlet under the sink needs to be readily accessible.
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/19/2023 APPROVED GBERTOLA
ROW FIELD SURVEY /GRADING CERTIFICATION 01/19/2023 APPROVED - AS NOTED GBERTOLA
Note: 01/19/23=NEED TO MATCH EXISTING GRADE AT EACH PROPERTY LINE, WATER FLOW FROM THE RIGHT TO THE LEFT .CHECK SWALE PLAN DETAIL. ON THE LEFT SIDE PROPERTY LINE SWALE NEED NEED TO RAISED. NEED EXPANSION JOINT CUT DOWN THE CENTER AND LENGTH OF THE PIPE.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/06/2022 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 9270 09/20/22= AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 09/08/22= FRONT FORM BOARD IS MISSING. NEED TO REPAIR THE WASHOUTON THE DRIVEWAY ORGANICS NEED TO BE REMOVED FROM THE POUR AREA. REMOVE THE PLYWOOD FROM THE DRIVEWAY. REMOVE THE WOOD STAKE FROM THE DRIVEWAY ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Culvert way out of tolerance on the right side creating 0 inches of Concrete over the pipe and tilted far more than 1 tenth. Possibly floated during a heavy rain event.
ELECTRIC-TUG 11/16/2022 Disapproved - NO FEE RMARTIN
Note: NEED A METER MAIN FOR TUG INSPECTION
ELECTRIC - EARLY POWER 10/12/2022 Disapproved - NO FEE JWALKER
Note: 10/6/2022 - PREVIOUS INSPECTION NOTES Need to add generator to electric plans and site plan. 10/12/22 Above listed correction has not been made.
ELECTRIC - EARLY POWER 10/12/2022 APPROVED - AS NOTED JWALKER
Note: Contractor will be pulling a permitt for the generator. Emailed FPL 12:52pm
ELECTRIC - EARLY POWER 10/06/2022 Disapproved -FEE REQUIRED JMUNSON
Note: Need to add generator to electric plans and site plan. Generator must be 5 feet away from ANY window that opens. Per manufacture specs.
ROW- PRE-APRON (PRE-POUR) 09/20/2022 APPROVED - AS NOTED GBERTOLA
Note: 09/20/22= AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 09/08/22= FRONT FORM BOARD IS MISSING. NEED TO REPAIR THE WASHOUTON THE DRIVEWAY ORGANICS NEED TO BE REMOVED FROM THE POUR AREA. REMOVE THE PLYWOOD FROM THE DRIVEWAY. REMOVE THE WOOD STAKE FROM THE DRIVEWAY ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Culvert way out of tolerance on the right side creating 0 inches of Concrete over the pipe and tilted far more than 1 tenth. Possibly floated during a heavy rain event.
ROW- PRE-APRON (PRE-POUR) 09/09/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 09/09/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ......................................................................................................................................................................................................... 09/08/22= FRONT FORM BOARD IS MISSING. NEED TO REPAIR THE WASHOUTON THE DRIVEWAY ORGANICS NEED TO BE REMOVED FROM THE POUR AREA. REMOVE THE PLYWOOD FROM THE DRIVEWAY. REMOVE THE WOOD STAKE FROM THE DRIVEWAY CULVERT PIPE IS GOOD ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Culvert way out of tolerance on the right side creating 0 inches of Concrete over the pipe and tilted far more than 1 tenth. Possibly floated during a heavy rain event.
ROW- PRE-APRON (PRE-POUR) 09/08/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 09/08/22= FRONT FORM BOARD IS MISSING. NEED TO REPAIR THE WASHOUTON THE DRIVEWAY ORGANICS NEED TO BE REMOVED FROM THE POUR AREA. REMOVE THE PLYWOOD FROM THE DRIVEWAY. REMOVE THE WOOD STAKE FROM THE DRIVEWAY ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Culvert way out of tolerance on the right side creating 0 inches of Concrete over the pipe and tilted far more than 1 tenth. Possibly floated during a heavy rain event.
ELECTRIC UNDERGROUND 08/25/2022 CANCELLED BY INSPECTOR JMUNSON
Note: This inspection is not needed
ROW- PRE-APRON (PRE-POUR) 08/23/2022 Disapproved -FEE REQUIRED RGROSS
Note: Culvert way out of tolerance on the right side creating 0 inches of Concrete over the pipe and tilted far more than 1 tenth. Possibly floated during a heavy rain event.
GRAVITY SEWER TEST 07/18/2022 APPROVED MGIBSON
U - SEWER TIE IN 07/18/2022 APPROVED MGIBSON
Note: THIS IS A REINSPECTION
U - SEWER TIE IN 07/15/2022 Disapproved - NO FEE JWALKER
Note: Unable to see connection. Hole filled with soil
PEP TANK INSTALLATION REQUEST 07/05/2022 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 6/16/2022 3:19:16 PM temp power pole needs to move
PEP TANK INSTALLATION REQUEST 06/16/2022 Disapproved - NO FEE CSTONE
Note: temp power pole needs to move
INSULATION 06/10/2022 APPROVED JWALKER
ELECTRIC 2ND ROUGH 06/10/2022 CANCELLED BY APPLICANT WEB
LATH/BRICK/ WATER BARRIER 06/07/2022 APPROVED JWALKER
ALL ROUGH 06/03/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION Ground conductor wire at meter to UFER needs to be protected HVAC line set not installed into sleeve not sealed Toilet drain in master shower is set less than 15" to the shower wall. Check for 15" clearance when toilet is set. Seal floor at kitchen where concrete has be cut out. Nail plates at multiple top chord locations need to be installed check all, The exterior wall top chords need to be nail plated.
ALL ROUGH 05/25/2022 Disapproved - NO FEE JWALKER
Note: Ground conductor wire at meter to UFER needs to be protected HVAC line set not installed into sleeve not sealed Toilet drain in master shower is set less than 15" to the shower wall. Check for 15" clearance when toilet is set. Seal floor at kitchen where concrete has be cut out. Nail plates at multiple top chord locations need to be installed check all, The exterior wall top chords need to be nail plated.
ROOF VALLEY & METAL 01/05/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION Appears the roofed ran out of the approved underlayment on the worksheet and used a different peel and stick to finish the roof. Have contractor submitt a revision for the two types of peel and stick underlayment used or remove and use appoved underlayment list on the work sheet.
ROOF VALLEY & METAL 12/29/2021 Disapproved - NO FEE JWALKER
Note: Appears the roofed ran out of the approved underlayment on the worksheet and used a different peel and stick to finish the roof. Have contractor submitt a revision for the two types of peel and stick underlayment used or remove and use appoved underlayment list on the work sheet.
WALL SHEATHING 12/27/2021 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/21/2021 APPROVED LMILLER
ROOF SHEATHING 12/21/2021 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 11/17/2021 APPROVED JWALKER
FOUND SURVEY APPROVED (OFFICE) 09/27/2021 APPROVED TBAKER
MONOLITHIC SLAB 07/29/2021 APPROVED JWALKER
Note: THIS IS A REINSPECTION 3 column pads rear of building need to have 4 #5 each way.
MONOLITHIC SLAB 07/28/2021 Disapproved - NO FEE JWALKER
Note: 3 column pads rear of building need to have 4 #5 each way.
PLUMBING 1ST ROUGH UNDERGROUND 07/13/2021 APPROVED JGIBSON
ELECTRIC TEMP POLE 06/23/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:19 am
WATER METER INSTALLATION REQUEST 06/04/2021 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
MECH COMPLETE 01/12/2023 01/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/19/2022 08/19/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/19/2022 08/26/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 08/19/2022 08/19/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/24/2021 09/27/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/24/2021 09/27/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 04/27/2021 04/28/2021
Note: Released By: ESTELLE LENS - (386)986-2655 -
SWALE COMPLETE 04/16/2021 07/13/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 04/15/2021 04/21/2021
Note: Released By: JPI
CUSVC COMPLETE 04/15/2021 04/21/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 04/15/2021 04/19/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/15/2021 04/16/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 04/15/2021 04/19/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 04/15/2021 04/16/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 04/15/2021 04/22/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 04/15/2021 04/20/2021
Note: Held By: ESTELLE LENS - (386)986-2655 - Four foundation plantings are required on each side of the residence.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 01/20/2023
SW ENG REINSPECTION 30 ¤30.00 01/20/2023
SW ENG REINSPECTION 30 ¤30.00 01/20/2023
SW ENG REINSPECTION 30 ¤30.00 01/20/2023
PLAN REVIEW - REVISION ¤32.50 01/20/2023
REINSPECTION RESIDENTIAL ¤40.00 01/20/2023
CONTRACTOR CHANGE ¤40.00 08/30/2022
BUILDING DISCOUNT 100% (¤1,460.00) 04/30/2021
ELECTRIC FEE ¤240.00 04/30/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 04/30/2021
IMPACT FEE FIRE ¤367.00 04/30/2021
IMPACT FEE PARKS ¤1,199.12 04/30/2021
IMPACT FEE SCHOOL ¤3,600.00 04/30/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 04/30/2021
MECHANICAL FEE ¤240.00 04/30/2021
WATER -IRRIGATION INSPECTION ¤25.00 04/30/2021
WATER -IRRIGATION INSPECTION ¤25.00 04/30/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 04/30/2021
PLAN CHECK FEE ¤120.00 04/30/2021
PLUMBING FEE ¤240.00 04/30/2021
NEW RESIDENTIAL INSPECTIONS ¤600.00 04/30/2021
SITE PLAN 20 ¤20.00 04/30/2021
SURCHARGE FS 533.721 ¤2.00 04/30/2021
SURCHARGE - FS 468.631 ¤2.00 04/30/2021
CONNECTION FEES ¤1,017.83 04/30/2021
METER - DEPOSIT ¤60.00 04/30/2021
METER - DEPOSIT ¤60.00 04/30/2021
WATER-METER ¤441.07 04/30/2021
WATER- TURN ON ¤25.00 04/30/2021
WATER- TURN ON ¤25.00 04/30/2021
ADMIN FEE ¤20.00 04/30/2021
STORM WATER PERMIT FEES ¤80.00 04/30/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 04/30/2021
SEWER CREDIT (¤1,466.00) 04/30/2021
SEWER INSPECTION ¤25.00 04/30/2021
SEWER CAPITAL FACILITY ¤4,664.55 04/30/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 04/30/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,439.00