I want to search for...
Permit #2021040890
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00170-0280 |
| CONDITIONED SPACE: 2643 sqft |
| GARAGE: 1035 sqft |
| OPENED PORCH (WITH ROOF) : 81 sqft |
| OPENED PORCH (WITH ROOF) : 431 sqft |
| Total Square Footage: 4190 sqft |
| Block: 00170 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: (386) 445-7001 |
| Location Address: 28 FLINT HILL LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/25/2021 |
| NOC: RECORDED |
| Applicant name: RICHARD M. ANDERSON |
| Owner: LAGASSE PAUL JR & DEBORAH M GARCIA-HENRY H&W |
|
Address 6 BRWESTER ST MERRIMACK, NH 03054 |
| Lot: 0280 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
PALM WEST HOME BUILDERS, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 Florida Park Drive North Palm Coast, FL 32137 |
CRC054633 (Exp: 08/31/2026) | (386) 445-7001 | (386)446-5941 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/21/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 10-21-2022 1. Number sign not installed. 2. Front window broken. 3. Gas cook top hood not installed. 4. No hot water. Inspection stopped. | |||
| BLD - BUILDING FINAL | 10/21/2022 | FINAL APPROVED | DCUSHING |
| Note: 10/21/2022 - PREVIOUS INSPECTION NOTES 10-21-2022 1. Number sign not installed. 2. Front window broken. 3. Gas cook top hood not installed. 4. No hot water. Inspection stopped. 10.21.22 - Returned same day, all items addressed | |||
| U -UTILITY RESIDENTIAL FINAL | 10/21/2022 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/20/2022 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/20/2022 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 10/20/2022 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 10/20/2022 | APPROVED | RGROSS |
| U-CROSS CONNECTION | 10/19/2022 | APPROVED | DHANEY |
| WINDOW NAILING | 10/19/2022 | APPROVED | AGAETANO |
| ROW- PRE-APRON (PRE-POUR) | 10/10/2022 | APPROVED | EMADISON |
| Note: ** 10/10/22 PAVER CREW ON SITE COMPACTING BASE AREAS CHECKED, ADDING MORE BASE AT THIUS TIME CAN START LAYING PAVERS ONCE ALL BASE IS DOWN. 10/6/2022 - PREVIOUS INSPECTION NOTES ** 10/06/22 APRON READY TO POUR ALONG WITH PAVER RESTRAINTS ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE IS SPREAD AND COMPACTED, ** DO NOT SET PAVERS BEFORE THIS INSPECTION IS APPROVED. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 CULVERTS NEED TO HAVE MATERIAL 1/2 WAY UP AND COMPACTED ** REBAR MISSING FROM FOOTERS | |||
| ELECTRIC - EARLY POWER | 10/10/2022 | APPROVED | JMUNSON |
| Note: THIS IS A REINSPECTION THIS MAY BE INCORRECT INSPECTION, SHOULD BE TUG? EARLY POWER INSPECTION IS WHEN ALL SWITCHES, LIGHTS, OUTLETS ETC ARE INSTALLED | |||
| GRAVITY SEWER TEST | 10/06/2022 | APPROVED | MGIBSON |
| Note: 9/23/2022 - PREVIOUS INSPECTION NOTES Ok to cover up the driveway at contractors on risk, with out test being on gravity sewer will be tested at next gravity sewer inspection along with u-sewer tie in inspection | |||
| ROW- PRE-APRON (PRE-POUR) | 10/06/2022 | PARTIALLY APPROVED | EMADISON |
| Note: ** 10/06/22 APRON READY TO POUR ALONG WITH PAVER RESTRAINTS ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE IS SPREAD AND COMPACTED, ** DO NOT SET PAVERS BEFORE THIS INSPECTION IS APPROVED. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 CULVERTS NEED TO HAVE MATERIAL 1/2 WAY UP AND COMPACTED ** REBAR MISSING FROM FOOTERS | |||
| ROW- PAVER RESTRAINTS | 10/06/2022 | APPROVED | EMADISON |
| Note: ** 10/06/22 PAVER RESTRAINTS READY TO POUR ALONG WITH APRON 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 PAVER RESTRAINTS NEED TO BE A MINIMUM OF 4INCHES WIDE BY 8 INCHES DEEP | |||
| U - SEWER TIE IN | 10/06/2022 | APPROVED | MGIBSON |
| Note: 9/23/2022 - PREVIOUS INSPECTION NOTES U-SEWER TIE IN TAP NOT MADE YET, SEE GRAVITY SEWER NOTE SEWER TURNED UP PASSED DRIVE WAY JUST TO GET IT UNDER DRIVE WAY | |||
| ROW- PAVER RESTRAINTS | 10/05/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/05/22 PAVER RESTRAINTS NEED TO BE A MINIMUM OF 4INCHES WIDE BY 8 INCHES DEEP | |||
| ROW- PRE-APRON (PRE-POUR) | 10/05/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/05/22 CULVERTS NEED TO HAVE MATERIAL 1/2 WAY UP AND COMPACTED ** REBAR MISSING FROM FOOTERS | |||
| GRAVITY SEWER TEST | 09/23/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: Ok to cover up the driveway at contractors on risk, with out test being on gravity sewer will be tested at next gravity sewer inspection along with u-sewer tie in inspection | |||
| U - SEWER TIE IN | 09/23/2022 | Disapproved - NO FEE | MGIBSON |
| Note: U-SEWER TIE IN TAP NOT MADE YET, SEE GRAVITY SEWER NOTE SEWER TURNED UP PASSED DRIVE WAY JUST TO GET IT UNDER DRIVE WAY | |||
| ELECTRIC-TUG | 08/31/2022 | CANCELLED BY INSPECTOR | JMUNSON |
| ELECTRIC-TUG | 07/29/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION schedule 80 pvc is not installed, no underground conduit is installed 5-31-22 cancelled per Richie 7/26/22 1.schedule 80 pvc is not installed, no underground conduit is installed 2. Ground wire must be protected. NEC 2017 250.62 | |||
| ELECTRIC-TUG | 07/26/2022 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION schedule 80 pvc is not installed, no underground conduit is installed 5-31-22 cancelled per Richie 7/26/22 1.schedule 80 pvc is not installed, no underground conduit is installed 2. Ground wire must be protected. NEC 2017 250.62 | |||
| ELECTRIC - EARLY POWER | 07/18/2022 | Disapproved - NO FEE | RMARTIN |
| Note: THIS MAY BE INCORRECT INSPECTION, SHOULD BE TUG? EARLY POWER INSPECTION IS WHEN ALL SWITCHES, LIGHTS, OUTLETS ETC ARE INSTALLED | |||
| INSULATION | 07/15/2022 | APPROVED | FWILLIS |
| Note: need to check slider panels or walk doors installed at insulation. window nailing added. | |||
| LATH/BRICK/ WATER BARRIER | 07/12/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Contractor not ready. | |||
| LATH/BRICK/ WATER BARRIER | 07/07/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Contractor not ready. | |||
| ALL ROUGH | 06/30/2022 | APPROVED - AS NOTED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Grounding conductors not visible. NEC 250.2(A)1 2. No windows or doors. Add window nailing. 3. Ceiling lights grounds need to be tied together. 4. Head test not holding water. 6-28-22 1. Grounding conductors not visible. (Ufer Ground Missing) NEC 250.2(A)1 2. No slider panels or walk doors installed. Add window nailing. 3. Left garage window missing screws 4. need to seal saw cut at island electric 6-30-22 need to check slider panels or walk doors installed at insulation. window nailing added. | |||
| ALL ROUGH | 06/28/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION 1. Grounding conductors not visible. NEC 250.2(A)1 2. No windows or doors. Add window nailing. 3. Ceiling lights grounds need to be tied together. 4. Head test not holding water. 6-28-22 1. Grounding conductors not visible. (Ufer Ground Missing) NEC 250.2(A)1 2. No slider panels or walk doors installed. Add window nailing. 3. Left garage window missing screws 4. need to seal saw cut at island electric | |||
| ELECTRIC-TUG | 05/31/2022 | CANCELLED BY APPLICANT | LMILLER |
| Note: THIS IS A REINSPECTION schedule 80 pvc is not installed, no underground conduit is installed 5-31-22 cancelled per Richie | |||
| ALL ROUGH | 05/17/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Grounding conductors not visible. NEC 250.2(A)1 2. No windows or doors. Add window nailing. 3. Ceiling lights grounds need to be tied together. 4. Head test not holding water. | |||
| ROOF VALLEY & METAL | 04/14/2022 | APPROVED | RMARTIN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/05/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please have approved drawings on site for inspection. 03-08-2022 - Please have drawings on site for inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/08/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION Please have approved drawings on site for inspection. 1. Truss D08, Connector schedule calls for two HETA20, only one installed. 2. Interior load bearing wall at right and left of entry detail not installed as per drawings. See 2/F, 2 x 4 installed and drawings call for 2 x 6 with three toe nails at to plate. Check truss plan for load bearing locations at E01. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/04/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: Please have approved drawings on site for inspection. | |||
| ELECTRIC-TUG | 01/12/2022 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: schedule 80 pvc is not installed, no underground conduit is installed | |||
| MONOLITHIC SLAB | 01/07/2022 | APPROVED | DCUSHING |
| Note: Added column pad per revision | |||
| TIE BEAM / LINTEL | 11/12/2021 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 10/07/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 09/23/2021 | APPROVED | DCUSHING |
| WATER METER INSTALLATION REQUEST | 08/27/2021 | APPROVED | CSTONE |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/17/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED PORTABLE RESTROOM BEFORE MONOLITHIC SLAB INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 09/20/2022 | 09/20/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/15/2022 | 09/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/15/2022 | 09/21/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/15/2022 | 09/15/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM if pavers will be placed in the Right of Way please follow instructions below. Pavers Please submit a Right of Way Utilization Agreement for the paver driveway. The Agreement must be signed by all owners on property deed, and notarized and original will need to be turned in to us once electronic copy has been approved. | |||
| BLD | COMPLETE | 03/29/2022 | 03/30/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/30/2021 | 01/04/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/08/2021 | 11/10/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/06/2021 | 10/07/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/06/2021 | 10/07/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/17/2021 | 05/24/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/06/2021 | 05/07/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/06/2021 | 05/12/2021 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Need Flow arrows on the left side. Also proposed drainage elevation not flowing forward a minimum of 6 inches from rear to front. | |||
| ENGIN1 | COMPLETE | 05/06/2021 | 05/07/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/04/2021 | 05/05/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/04/2021 | 05/05/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Lot square footage incorrect on survey/site plan Shows on plat this is a 105' x 125' lot which is a 13,125 total | |||
| ENGIN1 | COMPLETE | 05/04/2021 | 05/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/04/2021 | 05/06/2021 |
| Note: Held By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM wrong info | |||
| BLD | COMPLETE | 04/16/2021 | 04/21/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/16/2021 | 04/20/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 04/16/2021 | 04/19/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/16/2021 | 04/16/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/16/2021 | 04/20/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/16/2021 | 04/19/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Plans show R30 insulation in attic. Energy Calcs say R38. Revise to match | |||
| SW1 | COMPLETE | 04/16/2021 | 04/22/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/16/2021 | 04/20/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Lot square footage incorrect on survey/site plan The one car garage driveway must be a minimum of 16ft in width | |||
| SWALE | COMPLETE | 04/16/2021 | 07/14/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 10/21/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/21/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/21/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/21/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/21/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/21/2022 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 10/21/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/21/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/21/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/25/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 05/25/2021 |
| SEWER CREDIT | (¤1,466.00) | 05/25/2021 |
| SEWER INSPECTION | ¤25.00 | 05/25/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 05/25/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 05/25/2021 |
| METER - DEPOSIT | ¤60.00 | 05/25/2021 |
| WATER- TURN ON | ¤25.00 | 05/25/2021 |
| ADMIN FEE | ¤20.00 | 05/25/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 05/25/2021 |
| MECHANICAL FEE | ¤300.00 | 05/25/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/25/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/25/2021 |
| PLAN CHECK FEE | ¤160.00 | 05/25/2021 |
| PLUMBING FEE | ¤300.00 | 05/25/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤800.00 | 05/25/2021 |
| SITE PLAN 20 | ¤20.00 | 05/25/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/25/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/25/2021 |
| CONNECTION FEES | ¤1,017.83 | 05/25/2021 |
| BUILDING DISCOUNT 100% | (¤1,880.00) | 05/25/2021 |
| ELECTRIC FEE | ¤300.00 | 05/25/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/25/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/25/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/25/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/25/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,991.93 |