I want to search for...

Permit #2021040890

Permit Details

Status: COED

Parcel Id: 07-11-31-7010-00170-0280
CONDITIONED SPACE: 2643 sqft
GARAGE: 1035 sqft
OPENED PORCH (WITH ROOF) : 81 sqft
OPENED PORCH (WITH ROOF) : 431 sqft
Total Square Footage: 4190 sqft
Block: 00170
Subdivision: 2137 - SECTION 10-FLORIDA PARK
Job Phone: (386) 445-7001
Location Address: 28 FLINT HILL LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/25/2021
NOC: RECORDED
Applicant name: RICHARD M. ANDERSON
Owner: LAGASSE PAUL JR & DEBORAH M GARCIA-HENRY H&W

Address

6 BRWESTER ST

MERRIMACK, NH 03054

Lot: 0280
Contracted Stated Job Value: ¤400,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

PALM WEST HOME BUILDERS, INC.
Status Location Address State License Number Phone Fax
ACTIVE

2 Florida Park Drive North

Palm Coast, FL 32137

CRC054633 (Exp: 08/31/2026) (386) 445-7001 (386)446-5941

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
CHRISTOPHER DANIEL FULTON
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CCC1331939 (Exp: 08/31/2026) 386-445-7945
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/21/2022 Disapproved - NO FEE AGAETANO
Note: 10-21-2022 1. Number sign not installed. 2. Front window broken. 3. Gas cook top hood not installed. 4. No hot water. Inspection stopped.
BLD - BUILDING FINAL 10/21/2022 FINAL APPROVED DCUSHING
Note: 10/21/2022 - PREVIOUS INSPECTION NOTES 10-21-2022 1. Number sign not installed. 2. Front window broken. 3. Gas cook top hood not installed. 4. No hot water. Inspection stopped. 10.21.22 - Returned same day, all items addressed
U -UTILITY RESIDENTIAL FINAL 10/21/2022 FINAL APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/20/2022 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 10/20/2022 APPROVED RGROSS
ROW - STORMWATER FINAL 10/20/2022 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 10/20/2022 APPROVED RGROSS
U-CROSS CONNECTION 10/19/2022 APPROVED DHANEY
WINDOW NAILING 10/19/2022 APPROVED AGAETANO
ROW- PRE-APRON (PRE-POUR) 10/10/2022 APPROVED EMADISON
Note: ** 10/10/22 PAVER CREW ON SITE COMPACTING BASE AREAS CHECKED, ADDING MORE BASE AT THIUS TIME CAN START LAYING PAVERS ONCE ALL BASE IS DOWN. 10/6/2022 - PREVIOUS INSPECTION NOTES ** 10/06/22 APRON READY TO POUR ALONG WITH PAVER RESTRAINTS ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE IS SPREAD AND COMPACTED, ** DO NOT SET PAVERS BEFORE THIS INSPECTION IS APPROVED. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 CULVERTS NEED TO HAVE MATERIAL 1/2 WAY UP AND COMPACTED ** REBAR MISSING FROM FOOTERS
ELECTRIC - EARLY POWER 10/10/2022 APPROVED JMUNSON
Note: THIS IS A REINSPECTION THIS MAY BE INCORRECT INSPECTION, SHOULD BE TUG? EARLY POWER INSPECTION IS WHEN ALL SWITCHES, LIGHTS, OUTLETS ETC ARE INSTALLED
GRAVITY SEWER TEST 10/06/2022 APPROVED MGIBSON
Note: 9/23/2022 - PREVIOUS INSPECTION NOTES Ok to cover up the driveway at contractors on risk, with out test being on gravity sewer will be tested at next gravity sewer inspection along with u-sewer tie in inspection
ROW- PRE-APRON (PRE-POUR) 10/06/2022 PARTIALLY APPROVED EMADISON
Note: ** 10/06/22 APRON READY TO POUR ALONG WITH PAVER RESTRAINTS ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE IS SPREAD AND COMPACTED, ** DO NOT SET PAVERS BEFORE THIS INSPECTION IS APPROVED. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 CULVERTS NEED TO HAVE MATERIAL 1/2 WAY UP AND COMPACTED ** REBAR MISSING FROM FOOTERS
ROW- PAVER RESTRAINTS 10/06/2022 APPROVED EMADISON
Note: ** 10/06/22 PAVER RESTRAINTS READY TO POUR ALONG WITH APRON 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 PAVER RESTRAINTS NEED TO BE A MINIMUM OF 4INCHES WIDE BY 8 INCHES DEEP
U - SEWER TIE IN 10/06/2022 APPROVED MGIBSON
Note: 9/23/2022 - PREVIOUS INSPECTION NOTES U-SEWER TIE IN TAP NOT MADE YET, SEE GRAVITY SEWER NOTE SEWER TURNED UP PASSED DRIVE WAY JUST TO GET IT UNDER DRIVE WAY
ROW- PAVER RESTRAINTS 10/05/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/05/22 PAVER RESTRAINTS NEED TO BE A MINIMUM OF 4INCHES WIDE BY 8 INCHES DEEP
ROW- PRE-APRON (PRE-POUR) 10/05/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/05/22 CULVERTS NEED TO HAVE MATERIAL 1/2 WAY UP AND COMPACTED ** REBAR MISSING FROM FOOTERS
GRAVITY SEWER TEST 09/23/2022 PARTIALLY APPROVED MGIBSON
Note: Ok to cover up the driveway at contractors on risk, with out test being on gravity sewer will be tested at next gravity sewer inspection along with u-sewer tie in inspection
U - SEWER TIE IN 09/23/2022 Disapproved - NO FEE MGIBSON
Note: U-SEWER TIE IN TAP NOT MADE YET, SEE GRAVITY SEWER NOTE SEWER TURNED UP PASSED DRIVE WAY JUST TO GET IT UNDER DRIVE WAY
ELECTRIC-TUG 08/31/2022 CANCELLED BY INSPECTOR JMUNSON
ELECTRIC-TUG 07/29/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION schedule 80 pvc is not installed, no underground conduit is installed 5-31-22 cancelled per Richie 7/26/22 1.schedule 80 pvc is not installed, no underground conduit is installed 2. Ground wire must be protected. NEC 2017 250.62
ELECTRIC-TUG 07/26/2022 Disapproved -FEE REQUIRED JMUNSON
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION schedule 80 pvc is not installed, no underground conduit is installed 5-31-22 cancelled per Richie 7/26/22 1.schedule 80 pvc is not installed, no underground conduit is installed 2. Ground wire must be protected. NEC 2017 250.62
ELECTRIC - EARLY POWER 07/18/2022 Disapproved - NO FEE RMARTIN
Note: THIS MAY BE INCORRECT INSPECTION, SHOULD BE TUG? EARLY POWER INSPECTION IS WHEN ALL SWITCHES, LIGHTS, OUTLETS ETC ARE INSTALLED
INSULATION 07/15/2022 APPROVED FWILLIS
Note: need to check slider panels or walk doors installed at insulation. window nailing added.
LATH/BRICK/ WATER BARRIER 07/12/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Contractor not ready.
LATH/BRICK/ WATER BARRIER 07/07/2022 Disapproved - NO FEE AGAETANO
Note: Contractor not ready.
ALL ROUGH 06/30/2022 APPROVED - AS NOTED LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Grounding conductors not visible. NEC 250.2(A)1 2. No windows or doors. Add window nailing. 3. Ceiling lights grounds need to be tied together. 4. Head test not holding water. 6-28-22 1. Grounding conductors not visible. (Ufer Ground Missing) NEC 250.2(A)1 2. No slider panels or walk doors installed. Add window nailing. 3. Left garage window missing screws 4. need to seal saw cut at island electric 6-30-22 need to check slider panels or walk doors installed at insulation. window nailing added.
ALL ROUGH 06/28/2022 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION 1. Grounding conductors not visible. NEC 250.2(A)1 2. No windows or doors. Add window nailing. 3. Ceiling lights grounds need to be tied together. 4. Head test not holding water. 6-28-22 1. Grounding conductors not visible. (Ufer Ground Missing) NEC 250.2(A)1 2. No slider panels or walk doors installed. Add window nailing. 3. Left garage window missing screws 4. need to seal saw cut at island electric
ELECTRIC-TUG 05/31/2022 CANCELLED BY APPLICANT LMILLER
Note: THIS IS A REINSPECTION schedule 80 pvc is not installed, no underground conduit is installed 5-31-22 cancelled per Richie
ALL ROUGH 05/17/2022 Disapproved - NO FEE AGAETANO
Note: 1. Grounding conductors not visible. NEC 250.2(A)1 2. No windows or doors. Add window nailing. 3. Ceiling lights grounds need to be tied together. 4. Head test not holding water.
ROOF VALLEY & METAL 04/14/2022 APPROVED RMARTIN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/05/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please have approved drawings on site for inspection. 03-08-2022 - Please have drawings on site for inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/08/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION Please have approved drawings on site for inspection. 1. Truss D08, Connector schedule calls for two HETA20, only one installed. 2. Interior load bearing wall at right and left of entry detail not installed as per drawings. See 2/F, 2 x 4 installed and drawings call for 2 x 6 with three toe nails at to plate. Check truss plan for load bearing locations at E01.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/04/2022 Disapproved -FEE REQUIRED AGAETANO
Note: Please have approved drawings on site for inspection.
ELECTRIC-TUG 01/12/2022 Disapproved -FEE REQUIRED RMARTIN
Note: schedule 80 pvc is not installed, no underground conduit is installed
MONOLITHIC SLAB 01/07/2022 APPROVED DCUSHING
Note: Added column pad per revision
TIE BEAM / LINTEL 11/12/2021 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 10/07/2021 APPROVED TBAKER
MONOLITHIC SLAB 09/23/2021 APPROVED DCUSHING
WATER METER INSTALLATION REQUEST 08/27/2021 APPROVED CSTONE
PLUMBING 1ST ROUGH UNDERGROUND 08/17/2021 APPROVED - AS NOTED JGIBSON
Note: NEED PORTABLE RESTROOM BEFORE MONOLITHIC SLAB INSPECTION

Review History

Department Status Date In Date Out
ZON COMPLETE 09/20/2022 09/20/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/15/2022 09/15/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/15/2022 09/21/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 09/15/2022 09/15/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM if pavers will be placed in the Right of Way please follow instructions below. Pavers Please submit a Right of Way Utilization Agreement for the paver driveway. The Agreement must be signed by all owners on property deed, and notarized and original will need to be turned in to us once electronic copy has been approved.
BLD COMPLETE 03/29/2022 03/30/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 12/30/2021 01/04/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
BLD COMPLETE 11/08/2021 11/10/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/06/2021 10/07/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/06/2021 10/07/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 05/17/2021 05/24/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON COMPLETE 05/06/2021 05/07/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 05/06/2021 05/12/2021
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Need Flow arrows on the left side. Also proposed drainage elevation not flowing forward a minimum of 6 inches from rear to front.
ENGIN1 COMPLETE 05/06/2021 05/07/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH COMPLETE 05/04/2021 05/05/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 05/04/2021 05/05/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Lot square footage incorrect on survey/site plan Shows on plat this is a 105' x 125' lot which is a 13,125 total
ENGIN1 COMPLETE 05/04/2021 05/05/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 05/04/2021 05/06/2021
Note: Held By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM wrong info
BLD COMPLETE 04/16/2021 04/21/2021
Note: Released By: JPI
CUSVC COMPLETE 04/16/2021 04/20/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 04/16/2021 04/19/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/16/2021 04/16/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 04/16/2021 04/20/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 04/16/2021 04/19/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Plans show R30 insulation in attic. Energy Calcs say R38. Revise to match
SW1 COMPLETE 04/16/2021 04/22/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 04/16/2021 04/20/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Lot square footage incorrect on survey/site plan The one car garage driveway must be a minimum of 16ft in width
SWALE COMPLETE 04/16/2021 07/14/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 10/21/2022
REINSPECTION RESIDENTIAL ¤40.00 10/21/2022
REINSPECTION RESIDENTIAL ¤40.00 10/21/2022
REINSPECTION RESIDENTIAL ¤40.00 10/21/2022
REINSPECTION RESIDENTIAL ¤40.00 10/21/2022
REINSPECTION RESIDENTIAL ¤40.00 10/21/2022
RECORDING FEE REIMBURSE DOC ¤44.00 10/21/2022
SW ENG REINSPECTION 20 ¤20.00 10/21/2022
SW ENG REINSPECTION 30 ¤30.00 10/21/2022
STORM WATER PERMIT FEES ¤80.00 05/25/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 05/25/2021
SEWER CREDIT (¤1,466.00) 05/25/2021
SEWER INSPECTION ¤25.00 05/25/2021
SEWER CAPITAL FACILITY ¤4,664.55 05/25/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 05/25/2021
METER - DEPOSIT ¤60.00 05/25/2021
WATER- TURN ON ¤25.00 05/25/2021
ADMIN FEE ¤20.00 05/25/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 05/25/2021
MECHANICAL FEE ¤300.00 05/25/2021
WATER -IRRIGATION INSPECTION ¤25.00 05/25/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 05/25/2021
PLAN CHECK FEE ¤160.00 05/25/2021
PLUMBING FEE ¤300.00 05/25/2021
NEW RESIDENTIAL INSPECTIONS ¤800.00 05/25/2021
SITE PLAN 20 ¤20.00 05/25/2021
SURCHARGE FS 533.721 ¤2.00 05/25/2021
SURCHARGE - FS 468.631 ¤2.00 05/25/2021
CONNECTION FEES ¤1,017.83 05/25/2021
BUILDING DISCOUNT 100% (¤1,880.00) 05/25/2021
ELECTRIC FEE ¤300.00 05/25/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 05/25/2021
IMPACT FEE FIRE ¤367.00 05/25/2021
IMPACT FEE PARKS ¤1,199.12 05/25/2021
IMPACT FEE SCHOOL ¤3,600.00 05/25/2021
Fees Total Due: ¤0.00 Total Paid: ¤14,991.93