I want to search for...

Permit #2021040967

Permit Details

Status: COED

Parcel Id: 07-11-31-7018-00040-0080
CONDITIONED SPACE: 2623 sqft
GARAGE: 434 sqft
OPENED PORCH (WITH ROOF) : 275 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 3365 sqft
Block: 00040
Subdivision: 2181 - SECTION 18-WYNNFIELD
Job Phone: 321-610-3924
Location Address: 5 WAYSIDE PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/15/2021
NOC: RECORDED
Applicant name: KENNETH WAYNE CAMBELL JR
Owner: VINTAGE ESTATE HOMES LLC

Address

4885 N WICKHAM ROAD

MELBOURNE, FL 32940

Lot: 0080
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES PREMIER HOMES LLC
Status Location Address Mailing Address State License Number Phone
CANCEL

4885 N WICKHAM RD

MELBOURNE, FL 32940

SUITE 101

MELBOURNE, FL 32940

CBC058803 (Exp: 08/31/2022) 321-610-3924

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
JOSEPH G BURCHFIELD
Status Location Address State License Number Phone Fax
INACTIVE

2820 LEWIS SPEEDWAY SUITE B

ST AUGUSTINE, FL 32086

CCC058201 (Exp: 08/31/2024) 904-794-7100 904-794-7009
ZACHARY PETER BOERA
Status Location Address State License Number Phone
CANCEL

7225 SANDSCOVE COURT, SUITE 1

WINTER PARK, FL 32792

CAC1817652 (Exp: 08/31/2022) 407-629-6920

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/29/2021 FINAL APPROVED KSANDOE
Note: THIS IS A REINSPECTION Toilet in owner suite needs grout around the base. Submit revision to Building Department for installed HVAC equipment. Does not match energy calcs. MOCP Breaker size not indicated on Air Handler 12/29/21 - Toilet in owners suite needs grout around ENTIRE base.
BLD - BUILDING FINAL 12/27/2021 Disapproved - NO FEE KSANDOE
Note: Toilet in owner suite needs grout around the base. Submit revision to Building Department for installed HVAC equipment. Does not match energy calcs. MOCP Breaker size not indicated on Air Handler
U-CROSS CONNECTION 12/27/2021 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW - STORMWATER FINAL 12/27/2021 APPROVED - AS NOTED KRUTH
Note: FOR THE ROW FINAL REPAIR THE SWALE , AND REMOVE THE POTTY FROM THE SWALE AND PLACE ON THE DRIVEWAY corrections made
U -UTILITY RESIDENTIAL FINAL 12/27/2021 FINAL APPROVED JHARDING
INSULATION 12/22/2021 APPROVED KSANDOE
Note: THIS IS A REINSPECTION Front door has been removed. Reinstall for final approval.
FINAL SURVEY (OFFICE USE ONLY) 12/15/2021 APPROVED GBERTOLA
ROW - FINAL APRON (AFTER POUR) 12/15/2021 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/15/2021 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD.
U - SEWER TIE IN 12/09/2021 APPROVED MGIBSON
ELECTRIC - EARLY POWER 12/06/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:34 am
ROW- PRE-APRON (PRE-POUR) 11/18/2021 APPROVED - AS NOTED GBERTOLA
Note: 11/18/2021=cORRECTION WERE MADE AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. THIS IS A REINSPECTION FORM BOARD NEEDS TO BE AT THE EDGE OF PAVEMENT AND THE CULVERT IS TO BE 8 FOOT FROM EDGE OF PAVEMENT AS OF NOW THE FORM BOARD IS NOT AT THE EDGE OF PAVEMENT AND THE PIPE IS NOT AT FOOT FROM THE EDGE OF THE PAVEMENT
ROW- PRE-APRON (PRE-POUR) 11/17/2021 Disapproved -FEE REQUIRED KRUTH
Note: FORM BOARD NEEDS TO BE AT THE EDGE OF PAVEMENT AND THE CULVERT IS TO BE 8 FOOT FROM EDGE OF PAVEMENT AS OF NOW THE FORM BOARD IS NOT AT THE EDGE OF PAVEMENT AND THE PIPE IS NOT AT FOOT FROM THE EDGE OF THE PAVEMENT
LATH/BRICK/ WATER BARRIER 10/12/2021 APPROVED KSANDOE
Note: THIS IS A REINSPECTION Missing lath on front entryway and garage
PEP TANK INSTALLATION REQUEST 10/08/2021 CANCELLED BY INSPECTOR CSTONE
Note: This is not a PEP area
LATH/BRICK/ WATER BARRIER 10/05/2021 Disapproved - NO FEE KSANDOE
Note: Missing lath on front entryway and garage
INSULATION 09/30/2021 PARTIALLY APPROVED KSANDOE
Note: Front door has been removed. Reinstall for final approval.
ALL ROUGH 09/27/2021 APPROVED - AS NOTED KSANDOE
Note: Missing half window in bedroom. Broken window in laundry area. dryer vent needs to be sealed at the box. leave open for inspection at insulation.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/14/2021 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION X Bracing at Gable Missing as per Plan. X BRACING GOOD, NEED TO CHECK BOLTS AT GARAGE LOAD BEARING WALL ON ALL ROUGH
ROOF VALLEY & METAL 09/07/2021 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/07/2021 Disapproved - NO FEE FWILLIS
Note: X Bracing at Gable Missing as per Plan.
FOUND SURVEY APPROVED (OFFICE) 09/02/2021 APPROVED TBAKER
TIE BEAM / LINTEL 08/11/2021 APPROVED FWILLIS
MONOLITHIC SLAB 07/13/2021 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 07/09/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 07/09/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 06/24/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 12/27/2021 12/28/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/02/2021 09/02/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/02/2021 09/02/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 05/10/2021 05/11/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 05/07/2021 05/07/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs does not match the site plan. Revise to match. (Second Request)
ELEC COMPLETE 05/07/2021 05/07/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 05/07/2021 05/07/2021
Note: Released By: JPI
SWALE COMPLETE 04/19/2021 07/14/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 04/16/2021 04/21/2021
Note: Held By: JPI 1. Knee wall detail, #0180, page S301, does not call out stud spacing. Please clarify. 2. Provide wall sheathing nailing patterns. Include size, type of fastener.
CUSVC COMPLETE 04/16/2021 04/22/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 04/16/2021 04/19/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need to reference the 2017 NEC
ENGIN1 COMPLETE 04/16/2021 04/19/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 04/16/2021 04/20/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 04/16/2021 04/19/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs does not match the site plan. Revise to match.
SW1 COMPLETE 04/16/2021 04/22/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 04/16/2021 04/20/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 12/29/2021
SW ENG REINSPECTION 30 ¤30.00 12/29/2021
STORM WATER PERMIT FEES ¤80.00 06/15/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 06/15/2021
SEWER CREDIT (¤1,147.00) 06/15/2021
SEWER INSPECTION ¤25.00 06/15/2021
SEWER CAPITAL FACILITY ¤4,664.55 06/15/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 06/15/2021
METER - DEPOSIT ¤60.00 06/15/2021
WATER- TURN ON ¤25.00 06/15/2021
ADMIN FEE ¤20.00 06/15/2021
CONNECTION FEES ¤1,017.83 06/15/2021
CONTRACTOR CHANGE ¤40.00 06/15/2021
BUILDING DISCOUNT 100% (¤1,548.20) 06/15/2021
ELECTRIC FEE ¤252.60 06/15/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 06/15/2021
IMPACT FEE FIRE ¤367.00 06/15/2021
IMPACT FEE PARKS ¤1,199.12 06/15/2021
IMPACT FEE SCHOOL ¤3,600.00 06/15/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 06/15/2021
MECHANICAL FEE ¤252.60 06/15/2021
WATER -IRRIGATION INSPECTION ¤25.00 06/15/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 06/15/2021
PLAN CHECK FEE ¤128.40 06/15/2021
PLUMBING FEE ¤252.60 06/15/2021
NEW RESIDENTIAL INSPECTIONS ¤642.00 06/15/2021
SITE PLAN 20 ¤20.00 06/15/2021
SURCHARGE FS 533.721 ¤2.00 06/15/2021
SURCHARGE - FS 468.631 ¤2.00 06/15/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,086.93