Permit #2021041028
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00250-0050 |
| CONDITIONED SPACE: 1352 sqft |
| CONDITIONED SPACE: 1352 sqft |
| GARAGE: 448 sqft |
| GARAGE: 448 sqft |
| OPENED PORCH (WITH ROOF) : 113 sqft |
| OPENED PORCH (WITH ROOF) : 113 sqft |
| OPENED PORCH (WITH ROOF) : 34 sqft |
| OPENED PORCH (WITH ROOF) : 34 sqft |
| Total Square Footage: 3894 sqft |
| Block: 00250 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-931-5395 |
| Location Address: 4 LYNTON PL |
| Type: DU - DUPLEX |
| Issue Date: 05/04/2021 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: BARARDO OLIVIO & NYDIA H&W |
|
Address 14 COLLEGE COURT PALM COAST, FL 32137 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤320,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/14/2022 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION MOCP for AHRI not indicated. Unit B Breakers in panel not labeled. Unit B Breaker for dishwasher needs breaker lock. Unit B Stopped inspection. Check items in both units before recalling inspection 2/10/22 3.Dining room circuit need to be arc fault protection nec 210.12 | |||
| BLD - BUILDING FINAL | 02/14/2022 | FINAL APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION MOCP for AHRI not indicated. Unit B Breakers in panel not labeled. Unit B Breaker for dishwasher needs breaker lock. Unit B Stopped inspection. Check items in both units before recalling inspection | |||
| BLD - BUILDING FINAL | 02/11/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION MOCP for AHRI not indicated. Unit B Breakers in panel not labeled. Unit B Breaker for dishwasher needs breaker lock. Unit B Stopped inspection. Check items in both units before recalling inspection 2/10/22 1.MOCP for AHRI not indicated for both units 2.Breaker lock is not on dishwasher circuit as it is labeled on panel schdule 3.Dining room circuit need to be arc fault protected in both units | |||
| BLD - BUILDING FINAL | 02/10/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: THIS IS A REINSPECTION MOCP for AHRI not indicated. Unit B Breakers in panel not labeled. Unit B Breaker for dishwasher needs breaker lock. Unit B Stopped inspection. Check items in both units before recalling inspection 2/10/22 1.MOCP for AHRI not indicated for both units 2.Breaker lock is not on dishwasher circuit as it is labeled on panel schdule 3.Dining room circuit need to be arc fault protected in both units | |||
| BLD - BUILDING FINAL | 02/09/2022 | CANCELLED BY APPLICANT | WEB |
| BLD - BUILDING FINAL | 02/09/2022 | Disapproved - NO FEE | KSANDOE |
| Note: MOCP for AHRI not indicated. Unit B Breakers in panel not labeled. Unit B Breaker for dishwasher needs breaker lock. Unit B Stopped inspection. Check items in both units before recalling inspection | |||
| U -UTILITY RESIDENTIAL FINAL | 02/09/2022 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/08/2022 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION field final does not match final survey shows berm on left side of home clearly going to inpact house #6 | |||
| ROW - FINAL INSPECTION | 02/08/2022 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/07/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION field final does not match final survey shows berm on left side of home clearly going to inpact house #6 | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/03/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: field final does not match final survey shows berm on left side of home clearly going to inpact house #6 | |||
| ROW - FINAL APRON (AFTER POUR) | 02/03/2022 | APPROVED | PFLANAGAN |
| FINAL SURVEY (OFFICE USE ONLY) | 02/03/2022 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 01/24/2022 | APPROVED | MKRASKI |
| Note: THIS IS A REINSPECTION 1. Meter cans need to be labeled 2. Dryer outlet needs to have Emailed FPL @ 10:50 AM | |||
| ELECTRIC - EARLY POWER | 01/21/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Meter cans need to be labeled 2. Dryer outlet needs to have faceplate | |||
| U-CROSS CONNECTION | 01/21/2022 | APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 01/04/2022 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 11/12/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 11/12/2021 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 10/29/2021 | APPROVED | CSTONE |
| INSULATION | 10/28/2021 | APPROVED | FWILLIS |
| ALL ROUGH | 10/22/2021 | APPROVED | RMARTIN |
| ALL ROUGH | 10/21/2021 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NOT READY, Electricians still pulling wire @12:30PM THIS IS A REINSPECTION Dryer vents not sealed @ boxes, also need nail guards at top plate of wall, both units THIS IS 3RD REINSPECTION Dryer vents not FIRE sealed @ boxes, both units | |||
| LATH/BRICK/ WATER BARRIER | 10/20/2021 | APPROVED | FWILLIS |
| ALL ROUGH | 10/19/2021 | Disapproved - NO FEE | DCUSHING |
| Note: THIS IS A REINSPECTION NOT READY, Electricians still pulling wire @12:30PM THIS IS A REINSPECTION Dryer vents not sealed @ boxes, also need nail guards at top plate of wall, both units | |||
| ALL ROUGH | 10/15/2021 | Disapproved - NO FEE | DCUSHING |
| Note: NOT READY, Electricians still pulling wire @12:30PM | |||
| FIREWALL FINAL | 09/30/2021 | APPROVED | FWILLIS |
| FIREWALL DRYWALL NAILING | 09/20/2021 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 09/13/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/10/2021 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 08/09/2021 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 07/16/2021 | APPROVED | AMOBLEY |
| MONOLITHIC SLAB | 06/15/2021 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/10/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 06/09/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/08/2022 | 02/08/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/26/2021 | 08/27/2021 |
| Note: Released By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/16/2021 | 07/16/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/16/2021 | 07/16/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/13/2021 | 05/13/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/12/2021 | 05/12/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Revised exterior trim color does not appear to meet the requirement in the Land Development Code Chapter 13, Section 13.02.06.C.2. Accent color combinations. Accent colors should offer some contrast, and can therefore be darker, lighter, brighter, or richer than wall colors. However, the main consideration in choosing accent colors shall be compatibility with the wall color. Two accent colors shall be allowed per building. Accent colors shall complement the building's wall color. The blue trim with the yellow house does not meet this requirement. | |||
| ZON | COMPLETE | 04/27/2021 | 04/27/2021 |
| Note: Released By: ESTELLE LENS - (386)986-2655 - | |||
| ENGIN1 | COMPLETE | 04/27/2021 | 04/27/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/27/2021 | 05/04/2021 |
| Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/19/2021 | 04/22/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/19/2021 | 04/26/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 04/19/2021 | 04/20/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/19/2021 | 04/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/19/2021 | 04/22/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/19/2021 | 04/20/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/19/2021 | 04/23/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/19/2021 | 04/21/2021 |
| Note: Held By: ESTELLE LENS - (386)986-2655 - Lot area appears to total 10,000 sq. ft, not 12,500. Please correct the survey and the site plan. | |||
| SWALE | COMPLETE | 04/19/2021 | 07/15/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 02/14/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/14/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/14/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/14/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/14/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/04/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤79.98) | 05/04/2021 |
| ADMIN FEE | ¤20.00 | 05/04/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 05/04/2021 |
| PLAN CHECK FEE | ¤139.60 | 05/04/2021 |
| PLUMBING FEE | ¤269.40 | 05/04/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤698.00 | 05/04/2021 |
| SITE PLAN 20 | ¤20.00 | 05/04/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/04/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/04/2021 |
| BUILDING DISCOUNT 100% | (¤1,665.80) | 05/04/2021 |
| ELECTRIC FEE | ¤269.40 | 05/04/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 05/04/2021 |
| IMPACT FEE FIRE | ¤734.00 | 05/04/2021 |
| IMPACT FEE PARKS | ¤2,398.24 | 05/04/2021 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 05/04/2021 |
| IMPACT FEE TRANSPORTATION | ¤2,666.00 | 05/04/2021 |
| MECHANICAL FEE | ¤269.40 | 05/04/2021 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 04/29/2021 |
| CONNECTION FEES | ¤2,035.66 | 04/29/2021 |
| METER - DEPOSIT | ¤120.00 | 04/29/2021 |
| WATER- TURN ON | ¤50.00 | 04/29/2021 |
| SEWER CREDIT | (¤1,700.00) | 04/29/2021 |
| SEWER INSPECTION | ¤25.00 | 04/29/2021 |
| SEWER CAPITAL FACILITY | ¤9,329.10 | 04/29/2021 |
| WATER CAPITAL FACILITY FEE | ¤6,848.90 | 04/29/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤29,839.45 |