Permit #2021041204
Permit Details
Status: COED
| Parcel Id: 07-11-31-7060-00120-0110 |
| CONDITIONED SPACE: 1246 sqft |
| GARAGE: 404 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| Total Square Footage: 1804 sqft |
| Block: 00120 |
| Subdivision: - |
| Job Phone: 321-249-3126 |
| Location Address: 20 SLIPPER ORCHID TR E |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/13/2021 |
| NOC: RECORDED |
| Applicant name: MOREY C DOYLE |
| Owner: WJHFL LLC |
|
Address 3091 GOVERNORS LAKE DR NORCROSS, GA 30071 |
|
Address STE 300 NORCROSS, GA 30071 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤87,220.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
WADE JURNEY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
3091 GOVERNORS LAKE DRIVE NORCROSS, GA 30071 |
CGC1517458 (Exp: 08/31/2022) | 321-249-3126 |
Sub Contractors
EDWIN R INSALACO
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
3191 MAGUIRE BLVD ORLANDO, FL 32803 |
STE 200 ORLANDO, FL 32803 |
EC13001310 (Exp: 08/31/2024) | 321-441-7990 | 407-426-9741 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 11/05/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION *Clean Culvert ends. *Repair washout on the right top mitered end. A washout occurred on the right side where the mitered end meets the edge of driveway. 11/3/21 - *Clean Culvert ends. *Repair washout on the right top mitered end. A washout occurred on the right side where the mitered end meets the edge of driveway. 11/05/20221= CORRECTION WERE MADE | |||
| ROW - FINAL APRON (AFTER POUR) | 11/03/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION *Clean Culvert ends. *Repair washout on the right top mitered end. A washout occurred on the right side where the mitered end meets the edge of driveway. 11/3/21 - *Clean Culvert ends. *Repair washout on the right top mitered end. A washout occurred on the right side where the mitered end meets the edge of driveway. | |||
| ROW - STORMWATER FINAL | 11/03/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION *Regrade and re-sod the swale across the street to match existing surrounding grade. Repair very large ruts. *Pick up all trash in swale across the street that fell out of the dumpster. *Repair road edge damage where dumpster was pulled out. See paint marks. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/20/2021 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 10/20/2021 | Disapproved - NO FEE | RGROSS |
| Note: *Clean Culvert ends. *Repair washout on the right top mitered end. A washout occurred on the right side where the mitered end meets the edge of driveway. | |||
| ROW - STORMWATER FINAL | 10/20/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: *Regrade and re-sod the swale across the street to match existing surrounding grade. Repair very large ruts. *Pick up all trash in swale across the street that fell out of the dumpster. *Repair road edge damage where dumpster was pulled out. See paint marks. Photo's Attached. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/19/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 10/19/2021 | APPROVED | RGROSS |
| PLUMBING FINAL | 10/18/2021 | Approval - Private Provider | PPROVIDER |
| Note: THIS IS A REINSPECTION ADDED ON 10/13/2021 10:55:49 AM | |||
| HVAC FINAL | 10/18/2021 | Approval - Private Provider | PPROVIDER |
| Note: THIS IS A REINSPECTION ADDED ON 10/13/2021 10:54:43 AM | |||
| ELECTRIC FINAL | 10/18/2021 | Approval - Private Provider | PPROVIDER |
| Note: THIS IS A REINSPECTION ADDED ON 10/13/2021 10:54:27 AM | |||
| BLD - BUILDING FINAL | 10/18/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING FINAL | 10/13/2021 | Disapproved- Private Provider | PPROVIDER |
| ELECTRIC FINAL | 10/13/2021 | Disapproved- Private Provider | PPROVIDER |
| HVAC FINAL | 10/13/2021 | Disapproved- Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 10/11/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/24/2021 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO REMOVE THE DIRT INSIDE THE CULVERT PIPE, PUMP THE WATER OUT. AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. 9/14/21 - *Culvert Full of Water *Missing the face board. Possibly hit by a car. *Not 6 inches thick at the Road edge. *Not 4 inches thick across the entrance of the garage or porch. *Left side bottom back miter board cannot be up against pipe. Move back 6 - 10 inches away from culvert. 9/24/21 - READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 09/17/2021 | CANCELLED BY APPLICANT | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO REMOVE THE DIRT INSIDE THE CULVERT PIPE, PUMP THE WATER OUT. AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. 9/14/21 - *Culvert Full of Water *Missing the face board. Possibly hit by a car. *Not 6 inches thick at the Road edge. *Not 4 inches thick across the entrance of the garage or porch. *Left side bottom back miter board cannot be up against pipe. Move back 6 - 10 inches away from culvert. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/14/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO REMOVE THE DIRT INSIDE THE CULVERT PIPE, PUMP THE WATER OUT. AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. 9/14/21 - *Culvert Full of Water *Missing the face board. Possibly hit by a car. *Not 6 inches thick at the Road edge. *Not 4 inches thick across the entrance of the garage or porch. *Left side bottom back miter board cannot be up against pipe. Move back 6 - 10 inches away from culvert. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/09/2021 | CANCELLED BY APPLICANT | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO REMOVE THE DIRT INSIDE THE CULVERT PIPE, PUMP THE WATER OUT. AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. | |||
| GRAVITY SEWER TEST | 09/09/2021 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 09/08/2021 | CANCELLED BY APPLICANT | GBERTOLA |
| Note: THIS IS A REINSPECTION NEED TO REMOVE THE DIRT INSIDE THE CULVERT PIPE, PUMP THE WATER OUT. AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/07/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: NEED TO REMOVE THE DIRT INSIDE THE CULVERT PIPE, PUMP THE WATER OUT. AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. | |||
| ELECTRIC - EARLY POWER | 09/07/2021 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 09/07/2021 | APPROVED | JGIBSON |
| INSULATION | 08/09/2021 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 08/02/2021 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 08/02/2021 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 07/29/2021 | APPROVED | CSTONE |
| ALL ROUGH | 07/28/2021 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 07/28/2021 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 07/14/2021 | Approval - Private Provider | PPROVIDER |
| Note: 07/14/2021 Wall sheathing inspection passed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/14/2021 | Approval - Private Provider | PPROVIDER |
| Note: 07/14/2021 Roof sheathing, braces and ties inspection passed. | |||
| ROOF VALLEY & METAL | 07/12/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 07/07/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/07/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 06/23/2021 | Approval - Private Provider | PPROVIDER |
| Note: 06/23/2021 Lintel inspection passed. | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/22/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 06/21/2021 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 06/07/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/02/2021 | PPROVIDER | |
| WATER METER INSTALLATION REQUEST | 05/19/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 06/22/2021 | 06/22/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/22/2021 | 06/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/19/2021 | 05/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/19/2021 | 05/19/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM A site plan was submitted today for review with no notes as to what the changes are from the one that was approved on 5/11/21. | |||
| SW1 | COMPLETE | 05/19/2021 | 05/25/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/11/2021 | 05/13/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| MECH | COMPLETE | 04/29/2021 | 04/29/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/29/2021 | 04/30/2021 |
| Note: Held By: ESTELLE LENS - (386)986-2655 - Repeat comments: Need to fix FEMA map panel number. (...024OE) Banding is required on windows and doors in the rear facing the public right of way. | |||
| CUSVC | COMPLETE | 04/29/2021 | 05/05/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| BLD | COMPLETE | 04/21/2021 | 04/26/2021 |
| Note: Released By: JPI | |||
| CUSVC | HOLD | 04/21/2021 | 04/27/2021 |
| Note: Held By: HALEIGH HAND - - Please correct the utility application to reflect the correct parcel number. | |||
| ELEC | COMPLETE | 04/21/2021 | 04/22/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/21/2021 | 04/21/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/21/2021 | 04/26/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/21/2021 | 04/22/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the builder | |||
| SW1 | COMPLETE | 04/21/2021 | 04/27/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/21/2021 | 04/22/2021 |
| Note: Held By: ESTELLE LENS - (386)986-2655 - Need to fix FEMA map panel number. (...024OE) Banding is required on windows and doors in the rear facing the public right of way. | |||
| SWALE | COMPLETE | 04/21/2021 | 07/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/05/2021 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/29/2021 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/29/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 10/29/2021 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/29/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/13/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 05/13/2021 |
| SEWER CREDIT | (¤2,465.75) | 05/13/2021 |
| SEWER INSPECTION | ¤25.00 | 05/13/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 05/13/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 05/13/2021 |
| METER - DEPOSIT | ¤60.00 | 05/13/2021 |
| WATER- TURN ON | ¤25.00 | 05/13/2021 |
| ADMIN FEE | ¤20.00 | 05/13/2021 |
| CONNECTION FEES | ¤1,017.83 | 05/13/2021 |
| BUILDING DISCOUNT 100% | (¤20.00) | 05/13/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/13/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/13/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/13/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/13/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 05/13/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/13/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/13/2021 |
| SITE PLAN 20 | ¤20.00 | 05/13/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/13/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/13/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,785.68 |