I want to search for...

Permit #2021041210

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00510-0150
CONDITIONED SPACE: 1246 sqft
GARAGE: 404 sqft
OPENED PORCH (WITH ROOF) : 54 sqft
Total Square Footage: 1704 sqft
Block: 00510
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: 321-249-3126
Location Address: 173 RYBERRY DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/17/2021
NOC: RECORDED
Applicant name: MOREY C DOYLE
Owner: WJHFL LLC,D/B/A WJH LLC A DELAWARE

Address

3091 GOVERNORS LAKE DRIVE SUITE 300

NORCROSS, GA 30071

Lot: 0150
Contracted Stated Job Value: ¤87,220.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

WADE JURNEY HOMES
Status Location Address State License Number Phone
CANCEL

3091 GOVERNORS LAKE DRIVE

NORCROSS, GA 30071

CGC1517458 (Exp: 08/31/2022) 321-249-3126

Sub Contractors

EDWIN R INSALACO
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

3191 MAGUIRE BLVD

ORLANDO, FL 32803

STE 200

ORLANDO, FL 32803

EC13001310 (Exp: 08/31/2024) 321-441-7990 407-426-9741
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307
DANIEL P GREGOIRE
Status Location Address State License Number Phone
INACTIVE

64 W. CENTRAL AVENUE

LAKE WALES, FL 33853

CFC057378 (Exp: 08/31/2024) (863)696-3737
IAN ALAN BRENNER
Status Location Address Mailing Address State License Number Phone
ACTIVE

691 GARDEN COMMERCE PKWY

WINTER GARDEN, FL 34787

STE 170

WINTER GARDEN, FL 34787

CCC1331270 (Exp: 08/31/2026) 407-649-1333

Inspection History

Type Request Date Result Inspector
FINAL SURVEY (OFFICE USE ONLY) 09/30/2021 APPROVED GBERTOLA
Note: THIS IS A REINSPECTION FINAL SURVEY NEED TO BE DONE AFTER THE SOD IS LAID, NEED TO SUBMIT A NEW FINAL SURVEY 09/30/2021=CORRECTION WERE MADE
ROW - FINAL APRON (AFTER POUR) 09/30/2021 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW FIELD SURVEY /GRADING CERTIFICATION 09/30/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION FINAL SURVEY NEED TO BE DONE AFTER THE SOD IS LAID, NEED TO SUBMIT A NEW FINAL SURVEY 09/30/2021=CORRECTION WERE MADE
ROW - STORMWATER FINAL 09/30/2021 APPROVED - AS NOTED GBERTOLA
Note: 09/08/2021They need to clear the trees in the back yard is going to be inposible to do a good grading 09/30/2021=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
U -UTILITY RESIDENTIAL FINAL 09/30/2021 APPROVED - AS NOTED LFITZGERALD
Note: slight leak between water meter and check valves-builder submitted a work order with Melissa
ROW FIELD SURVEY /GRADING CERTIFICATION 09/29/2021 CANCELLED BY APPLICANT GBERTOLA
Note: FINAL SURVEY NEED TO BE DONE AFTER THE SOD IS LAID, NEED TO SUBMIT A NEW FINAL SURVEY
U-CROSS CONNECTION 09/28/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrrigation-no cross connection
FINAL SURVEY (OFFICE USE ONLY) 09/28/2021 Disapproved - NO FEE GBERTOLA
Note: FINAL SURVEY NEED TO BE DONE AFTER THE SOD IS LAID, NEED TO SUBMIT A NEW FINAL SURVEY
GRAVITY SEWER TEST 09/28/2021 Approval - Private Provider PPROVIDER
BLD - BUILDING FINAL 09/24/2021 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 09/14/2021 APPROVED - AS NOTED GBERTOLA
Note: MEETING WITH THE SUPER FOR THE TREES IN THE BACK
ROW - DRAINAGE 09/08/2021 APPROVED GBERTOLA
Note: they need to clear the trees in the back yard is going to be inposible to do a good grading
ROW- PRE-APRON (PRE-POUR) 09/07/2021 APPROVED - AS NOTED KRUTH
Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
U - SEWER TIE IN 09/07/2021 APPROVED JGIBSON
ELECTRIC - EARLY POWER 08/27/2021 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 08/11/2021 APPROVED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119) Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 08/03/2021 08/03/2021=NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE INSPECTOR BE BACK 8/5/2021 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 08/09/2021 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 08/10/2021 08/10/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE 08/11/2021=CORRECTION WERE MADE
ROW - DRAINAGE 08/10/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119) Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 08/03/2021 08/03/2021=NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE INSPECTOR BE BACK 8/5/2021 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 08/09/2021 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 08/10/2021 08/10/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE
ROW - DRAINAGE 08/09/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119) Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 08/03/2021 08/03/2021=NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE INSPECTOR BE BACK 8/5/2021 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 08/09/2021
ROW - DRAINAGE 08/09/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119) Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 08/03/2021 08/03/2021=NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE INSPECTOR BE BACK 8/5/2021 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 08/09/2021 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 08/10/2021
INSULATION 08/09/2021 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 08/05/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119) Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 08/03/2021 08/03/2021=NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE INSPECTOR BE BACK 8/5/2021 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 08/09/2021
ROW - DRAINAGE 08/03/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119) Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 08/03/2021 08/03/2021=NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE INSPECTOR BE BACK 8/5/2021
PEP TANK INSTALLATION REQUEST 08/03/2021 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 08/02/2021 Approval - Private Provider PPROVIDER
Note: 08/02/2021 All rough, wire lath inspection passed.
ALL ROUGH 08/02/2021 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 07/30/2021 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 07/27/2021 Disapproved - NO FEE GBERTOLA
Note: NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119) Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK ON 08/03/2021
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/07/2021 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/30/2021 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 06/30/2021 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 06/23/2021 Approval - Private Provider PPROVIDER
Note: THIS IS A REINSPECTION ADDED ON 6/21/2021 4:54:32 PM Comments: Task Date Task Note User Name 06/23/2021 Lintel inspection passed.
FOUND SURVEY APPROVED (OFFICE) 06/22/2021 APPROVED TBAKER
TIE BEAM / LINTEL 06/21/2021 Disapproved- Private Provider PPROVIDER
MONOLITHIC SLAB 06/07/2021 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 06/02/2021 APPROVED CSTONE
PLUMBING 1ST ROUGH UNDERGROUND 06/01/2021 Approval - Private Provider PPROVIDER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 06/22/2021 06/22/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/22/2021 06/22/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 05/12/2021 05/12/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 05/12/2021 05/12/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 05/12/2021 05/13/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
UTL COMPLETE 05/12/2021 05/17/2021
Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM
ELEC HOLD 04/28/2021 04/29/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need to reference the 2017 NEC 2nd request
MECH HOLD 04/28/2021 04/29/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Energy calcs need to be signed by the builder. (Second Request)
CUSVC COMPLETE 04/28/2021 05/03/2021
Note: Released By: HALEIGH HAND - -
ZON HOLD 04/28/2021 04/29/2021
Note: Held By: ESTELLE LENS - (386)986-2655 - Repeat comments: Wrong landscape plan is uploaded. (wrong address) The site plan and floor plan do not match. (garage orientation) Banding is required in the rear facing the public right of way.
BLD COMPLETE 04/21/2021 04/26/2021
Note: Released By: JPI
CUSVC HOLD 04/21/2021 04/22/2021
Note: Held By: HALEIGH HAND - - Please correct the utility application to reflect the correct parcel number.
ELEC HOLD 04/21/2021 04/22/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need to reference the 2017 NEC
ENGIN1 COMPLETE 04/21/2021 04/21/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 04/21/2021 04/26/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 04/21/2021 04/22/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Energy calcs need to be signed by the builder
SW1 COMPLETE 04/21/2021 04/27/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 04/21/2021 04/23/2021
Note: Held By: ESTELLE LENS - (386)986-2655 - Wrong landscape plan is uploaded. (wrong address) The site plan and floor plan do not match. (garage orientation) Banding is required in the rear facing the public right of way.
SWALE COMPLETE 04/21/2021 07/19/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - FIELD SURVEY INSPECT ¤20.00 09/29/2021
SW ENG - INSPECTION 20 ¤20.00 09/28/2021
SW ENG - INSPECTION 20 ¤20.00 09/28/2021
SW ENG - INSPECTION 20 ¤20.00 09/28/2021
SW ENG - INSPECTION 20 ¤20.00 09/28/2021
SW ENG - INSPECTION 20 ¤20.00 09/28/2021
SW ENG - INSPECTION 20 ¤20.00 09/28/2021
SW ENG - INSPECTION 20 ¤20.00 09/28/2021
SW ENG - FIELD SURVEY INSPECT ¤20.00 09/28/2021
STORM WATER PERMIT FEES ¤80.00 05/17/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 05/17/2021
SEWER CREDIT (¤1,342.00) 05/17/2021
SEWER INSPECTION ¤25.00 05/17/2021
SEWER CAPITAL FACILITY ¤4,664.55 05/17/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 05/17/2021
METER - DEPOSIT ¤60.00 05/17/2021
WATER- TURN ON ¤25.00 05/17/2021
ADMIN FEE ¤20.00 05/17/2021
CONNECTION FEES ¤1,017.83 05/17/2021
BUILDING DISCOUNT 100% (¤859.40) 05/17/2021
ELECTRIC FEE ¤154.20 05/17/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 05/17/2021
IMPACT FEE FIRE ¤367.00 05/17/2021
IMPACT FEE PARKS ¤1,199.12 05/17/2021
IMPACT FEE SCHOOL ¤3,600.00 05/17/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 05/17/2021
MECHANICAL FEE ¤154.20 05/17/2021
WATER -IRRIGATION INSPECTION ¤25.00 05/17/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 05/17/2021
PLAN CHECK FEE ¤62.80 05/17/2021
PLUMBING FEE ¤154.20 05/17/2021
NEW RESIDENTIAL INSPECTIONS ¤314.00 05/17/2021
SITE PLAN 20 ¤20.00 05/17/2021
SURCHARGE FS 533.721 ¤2.00 05/17/2021
SURCHARGE - FS 468.631 ¤2.00 05/17/2021
Fees Total Due: ¤0.00 Total Paid: ¤14,969.43