Permit #2021041232
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00210-0200 |
| CONDITIONED SPACE: 2130 sqft |
| GARAGE: 592 sqft |
| OPENED PORCH (WITH ROOF) : 199 sqft |
| OPENED PORCH (WITH ROOF) : 40 sqft |
| Total Square Footage: 2961 sqft |
| Block: 00210 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: 321-610-3924 |
| Location Address: 56 FALLEN OAK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/04/2021 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMBELL JR |
| Owner: VINTAGE ESTATE HOMES LLC |
|
Address 4885 N WICKHAM ROAD MELBOURNE, FL 32940 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: NEW SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
SUITE 101 MELBOURNE, FL 32940 |
CBC058803 (Exp: 08/31/2022) | 321-610-3924 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
ZACHARY PETER BOERA
| Status | Location Address | State License Number | Phone |
| CANCEL |
7225 SANDSCOVE COURT, SUITE 1 WINTER PARK, FL 32792 |
CAC1817652 (Exp: 08/31/2022) | 407-629-6920 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/24/2022 | FINAL APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 02-15-2022. 1. Energy calculations do not match with units and AHRI. 2. No water. Cannot check for hot water. 3. AHU high voltage at utility box mounted at the wall is not sealed completely. 2-16-22 common bath still has no water | |||
| BLD - BUILDING FINAL | 02/16/2022 | Disapproved - NO FEE | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 02-15-2022. 1. Energy calculations do not match with units and AHRI. 2. No water. Cannot check for hot water. 3. AHU high voltage at utility box mounted at the wall is not sealed completely. 2-16-22 common bath still has no water | |||
| BLD - BUILDING FINAL | 02/15/2022 | Disapproved - NO FEE | AGAETANO |
| Note: THIS IS A REINSPECTION 02-15-2022. 1. Energy calculations do not match with units and AHRI. 2. No water. Cannot check for hot water. 3. AHU high voltage at utility box mounted at the wall is not sealed completely. | |||
| BLD - BUILDING FINAL | 02/08/2022 | CANCELLED BY APPLICANT | AGAETANO |
| ROW - FINAL APRON (AFTER POUR) | 02/04/2022 | APPROVED - AS NOTED | PFLANAGAN |
| ROW - STORMWATER FINAL | 02/04/2022 | APPROVED - AS NOTED | PFLANAGAN |
| U -UTILITY RESIDENTIAL FINAL | 02/04/2022 | FINAL APPROVED | DHANEY |
| U-CROSS CONNECTION | 02/03/2022 | APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/03/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: looks good at time of inspection | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/03/2022 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 01/12/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:20 | |||
| ROW- PRE-APRON (PRE-POUR) | 01/12/2022 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 01/06/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS APPROVED ON 1/5/22 | |||
| U - SEWER TIE IN | 01/04/2022 | CANCELLED BY APPLICANT | WEB |
| ROW - DRAINAGE | 01/03/2022 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION silt in the swale in front of vaccant lot and ruts in the swale in front of the vaccant lot pipe is crushed and road needs to be cleaned 12/21/21 - Water backing up and into the street. Culvert is in place but needs cleaned. Next Inspection. 1/03/21 1/3/22- corrections made | |||
| ROW - DRAINAGE | 12/21/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION silt in the swale in front of vaccant lot and ruts in the swale in front of the vaccant lot pipe is crushed and road needs to be cleaned 12/21/21 - Water backing up and into the street. Culvert is in place but needs cleaned. Next Inspection. 12/28/21. | |||
| ROW - DRAINAGE | 12/17/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: silt in the swale in front of vaccant lot and ruts in the swale in front of the vaccant lot pipe is crushed and road needs to be cleaned | |||
| INSULATION | 11/29/2021 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION INSULATION NOT COMPLETE | |||
| INSULATION | 11/23/2021 | Disapproved - NO FEE | DCUSHING |
| Note: INSULATION NOT COMPLETE | |||
| ALL ROUGH | 11/17/2021 | APPROVED - AS NOTED | DCUSHING |
| Note: THIS IS A REINSPECTION check all nail guards @ waste stacks, bottom plate, both bathrooms | |||
| LATH/BRICK/ WATER BARRIER | 11/17/2021 | APPROVED | DCUSHING |
| ALL ROUGH | 11/15/2021 | CANCELLED BY APPLICANT | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/22/2021 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 10/22/2021 | APPROVED | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/21/2021 | CANCELLED BY APPLICANT | DCUSHING |
| Note: THIS IS A REINSPECTION | |||
| U-CROSS CONNECTION | 10/21/2021 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/20/2021 | CANCELLED BY APPLICANT | DCUSHING |
| FOUND SURVEY APPROVED (OFFICE) | 09/29/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/09/2021 | APPROVED | LMILLER |
| ROW - DRAINAGE | 08/19/2021 | APPROVED - AS NOTED | KRUTH |
| Note: dirt from lot going into road is a sediment violation needs to be addressed today and open swale dirt has washed in the swale and blocking the temp pipe flooding adjacent properties swale please open swale and remove the dirt from the road next inspection wednesday 8/18/21 nothing done next inspection 8/19/21 corrections being made next inspection 8/26/21 | |||
| ROW - DRAINAGE | 08/18/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION dirt from lot going into road is a sediment violation needs to be addressed today and open swale dirt has washed in the swale and blocking the temp pipe flooding adjacent properties swale please open swale and remove the dirt from the road next inspection wednesday 8/18/21 nothing done next inspection 8/19/21 | |||
| ROW - DRAINAGE | 08/16/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: dirt from lot going into road is a sediment violation needs to be addressed today and open swale dirt has washed in the swale and blocking the temp pipe flooding adjacent properties swale please open swale and remove the dirt from the road next inspection wednesday 8/18/21 | |||
| MONOLITHIC SLAB | 08/13/2021 | APPROVED | PBUCKLEY |
| WATER METER INSTALLATION REQUEST | 08/10/2021 | APPROVED | CSTONE |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/09/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 08/09/2021 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/22/2022 | 02/23/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/15/2022 | 02/15/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the builder per 107.1 FBC Residential 2020 7th edition 2. Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2020 7Th edition 3. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition 4. Minimum outdoor design temp on heatload for st. augustine at 1% per wrightsoft needs to be 89 degrees | |||
| ENGIN1 | COMPLETE | 09/29/2021 | 09/29/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/29/2021 | 09/29/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/21/2021 | 04/26/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/21/2021 | 04/28/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 04/21/2021 | 04/22/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/21/2021 | 04/21/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/21/2021 | 04/26/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/21/2021 | 04/22/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/21/2021 | 04/28/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/21/2021 | 04/23/2021 |
| Note: Released By: ESTELLE LENS - (386)986-2655 - | |||
| SWALE | COMPLETE | 04/21/2021 | 07/17/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/25/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 02/22/2022 |
| BUILDING DISCOUNT 100% | (¤1,334.00) | 05/04/2021 |
| ELECTRIC FEE | ¤222.00 | 05/04/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/04/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/04/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/04/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/04/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 05/04/2021 |
| MECHANICAL FEE | ¤222.00 | 05/04/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/04/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/04/2021 |
| PLAN CHECK FEE | ¤108.00 | 05/04/2021 |
| PLUMBING FEE | ¤222.00 | 05/04/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤540.00 | 05/04/2021 |
| SITE PLAN 20 | ¤20.00 | 05/04/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/04/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/04/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/04/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 05/04/2021 |
| SEWER CREDIT | (¤1,147.00) | 05/04/2021 |
| SEWER INSPECTION | ¤25.00 | 05/04/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 05/04/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 05/04/2021 |
| CONNECTION FEES | ¤1,017.83 | 05/04/2021 |
| METER - DEPOSIT | ¤60.00 | 05/04/2021 |
| WATER- TURN ON | ¤25.00 | 05/04/2021 |
| ADMIN FEE | ¤20.00 | 05/04/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,176.93 |