Permit #2021041299

Permit Details

Status: COED

Parcel Id: 48-11-31-1710-00000-0910
CONDITIONED SPACE: 2545 sqft
GARAGE: 671 sqft
OPENED PORCH (WITH ROOF) : 44 sqft
OPENED PORCH (WITH ROOF) : 446 sqft
Total Square Footage: 3706 sqft
Block: 00000
Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II
Job Phone: 386-445-2012
Location Address: 10 BLUE OAK LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/07/2021
NOC: RECORDED
Applicant name: JOHN NICHOLAS CORDASCI
Owner: DUTT WILLIAM M & MELANIE M H&W

Address

17652 WEST MILL CREEK CROSSING DR

GURNEE, IL 60031

Lot: 0910
Contracted Stated Job Value: ¤380,214.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SKYWAY BUILDERS INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 354786

PALM COAST, FL 32135

CBC1263769 (Exp: 08/31/2024) 386-445-2012

Sub Contractors

MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
TRAVIS MIDDLETON
Status Location Address State License Number Phone Fax
CANCEL

2680 HIGHWAY 17 SOUTH

CRESCENT CITY, FL 32112

00714 (Exp: 11/24/2022) 386-698-1033 386-698-1077
MARK B SOWERS
Status Location Address State License Number Phone
ACTIVE

609 FOURTH ST

BUNNELL, FL 32110

35616 (Exp: 08/31/2026) 386-225-1753

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/17/2022 FINAL APPROVED DCUSHING
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 08/16/2022 CANCELLED BY APPLICANT AGAETANO
U -UTILITY RESIDENTIAL FINAL 08/16/2022 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 08/15/2022 APPROVED PFLANAGAN
Note: THIS IS A REINSPECTION THERE ARE LOW AREAS IN LOT THAT ARE HOLDING WATER NEED TO FIX ALL AREAS
ROW - STORMWATER FINAL 08/15/2022 FINAL APPROVED PFLANAGAN
U-CROSS CONNECTION 08/15/2022 APPROVED - AS NOTED LFITZGERALD
Note: has reclaim irrigation-no cross connection
ROW - FINAL APRON (AFTER POUR) 08/15/2022 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/12/2022 APPROVED PFLANAGAN
Note: Inspector Notes from Inspection 9270 2/26/22 READY TO POUR SIDEWALK ALL CORRECTIONS MADE ----------------------------------------------------------------------------------------------------------------------------------- THE LEFT SIDEWALK IS PITCHED TO THE HOUSE NEED TO BE PITCHED TO THE ROAD
ROW FIELD SURVEY /GRADING CERTIFICATION 08/12/2022 Disapproved - NO FEE PFLANAGAN
Note: THERE ARE LOW AREAS IN LOT THAT ARE HOLDING WATER NEED TO FIX ALL AREAS
GAS FINAL 08/12/2022 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 07/26/2022 APPROVED - AS NOTED PFLANAGAN
Note: 2/26/22 READY TO POUR SIDEWALK ALL CORRECTIONS MADE ----------------------------------------------------------------------------------------------------------------------------------- THE LEFT SIDEWALK IS PITCHED TO THE HOUSE NEED TO BE PITCHED TO THE ROAD
ROW- PRE-APRON (PRE-POUR) 07/25/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE LEFT SIDEWALK IS PITCHED TO THE HOUSE NEED TO BE PITCHED TO THE ROAD
ROW- PRE-APRON (PRE-POUR) 05/16/2022 APPROVED PFLANAGAN
U - SEWER TIE IN 04/13/2022 APPROVED LMILLER
GRAVITY SEWER TEST 04/13/2022 APPROVED LMILLER
ELECTRIC - EARLY POWER 03/23/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 12:51 am
LATH/BRICK/ WATER BARRIER 12/15/2021 APPROVED JWALKER
INSULATION 12/14/2021 APPROVED JWALKER
Note: need SP4 at garage walk dpor king by insulation
ALL ROUGH 12/06/2021 APPROVED - AS NOTED LMILLER
Note: THIS IS A REINSPECTION 1. still need revision for truss repair at truss C7 (near front entry) by all-rough 2. missing SP4 at garage walk door 3. need nail plates on electric at kitchen island ends 4. missing all walk doors (this item can be looked at durring the insulation inspection) 12-06-21... need SP4 at garage walk dpor king by insulation
GAS ROUGH 12/02/2021 PARTIALLY APPROVED MGIBSON
Note: ANOTHER GAS ROUGH INSPECTION REQUIRED WHEN TANK IS INSTALLED AND LINE RAN FROM TANK TO HOUSE
ALL ROUGH 12/01/2021 Disapproved -FEE REQUIRED LMILLER
Note: 1. still need revision for truss repair at truss C7 (near front entry) by all-rough 2. missing SP4 at garage walk door 3. need nail plates on electric at kitchen island ends 4. missing all walk doors (this item can be looked at durring the insulation inspection)
ROOF VALLEY & METAL 09/09/2021 APPROVED LMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/07/2021 APPROVED - AS NOTED LMILLER
Note: need revision for truss repair at truss C7 (near front entry) by all-rough
ELECTRIC-TUG 08/31/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 2:35
TIE BEAM / LINTEL 08/18/2021 APPROVED WMILLER
ELEV CERT-FOUNDATION APPROVAL 08/17/2021 APPROVED JMYERS
FOUND SURVEY APPROVED (OFFICE) 08/17/2021 APPROVED TBAKER
MONOLITHIC SLAB 07/26/2021 APPROVED WMILLER
PLUMBING 1ST ROUGH UNDERGROUND 07/20/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 06/01/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 08/17/2022 08/18/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
PLFM COMPLETE 08/11/2022 08/12/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
PLFM COMPLETE 08/17/2021 08/17/2021
Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO.
ENGIN1 COMPLETE 08/16/2021 08/17/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/16/2021 08/16/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLFM COMPLETE 04/27/2021 04/27/2021
Note: Released By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been approved. However, at Foundation, the measurement box needs to be checked for C2e.
PLFM HOLD 04/26/2021 04/26/2021
Note: Held By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 4/22/21, the structure will be inside the Special Flood Hazard Area. Elevation certificates will be required at construction, foundation, and final.
BLD COMPLETE 04/22/2021 04/30/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 04/22/2021 04/27/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 04/22/2021 04/23/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/22/2021 04/22/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 04/22/2021 04/27/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 04/22/2021 04/22/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 04/22/2021 04/22/2021
Note: Released By: BARBIE BEMBRY - - BUILDINGDIVISION@PALMCOASTGOV.COM THE NOC submitted is not notarized properly The printed name of the person(s) whom name is being notarized is required for a notary. Please correct and re-record the correct version.
ZON COMPLETE 04/22/2021 04/26/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 08/19/2022
PLAN REVIEW - REVISION ¤32.50 08/19/2022
PLAN REVIEW - REVISION ¤32.50 08/19/2022
REINSPECTION RESIDENTIAL ¤40.00 08/19/2022
SW ENG REINSPECTION 30 ¤30.00 08/19/2022
STORM WATER PERMIT FEES ¤80.00 05/07/2021
3% TRANS IMPACT FEE CREDIT (¤94.17) 05/07/2021
SEWER INSPECTION ¤25.00 05/07/2021
CONNECTION FEES ¤25.00 05/07/2021
METER - DEPOSIT ¤60.00 05/07/2021
WATER-METER ¤441.07 05/07/2021
WATER-METER ¤366.42 05/07/2021
ADMIN FEE ¤20.00 05/07/2021
BUILDING DISCOUNT 100% (¤1,800.20) 05/07/2021
ELECTRIC FEE ¤288.60 05/07/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 05/07/2021
IMPACT FEE FIRE ¤367.00 05/07/2021
IMPACT FEE PARKS ¤1,199.12 05/07/2021
IMPACT FEE SCHOOL ¤3,600.00 05/07/2021
IMPACT FEE TRANSPORTATION ¤3,139.00 05/07/2021
MECHANICAL FEE ¤288.60 05/07/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 05/07/2021
PLAN CHECK FEE ¤152.40 05/07/2021
PLUMBING FEE ¤288.60 05/07/2021
NEW RESIDENTIAL INSPECTIONS ¤762.00 05/07/2021
SITE PLAN 20 ¤20.00 05/07/2021
SURCHARGE FS 533.721 ¤2.00 05/07/2021
SURCHARGE - FS 468.631 ¤2.00 05/07/2021
Fees Total Due: ¤0.00 Total Paid: ¤9,360.46