Permit #2021041299
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0910 |
| CONDITIONED SPACE: 2545 sqft |
| GARAGE: 671 sqft |
| OPENED PORCH (WITH ROOF) : 44 sqft |
| OPENED PORCH (WITH ROOF) : 446 sqft |
| Total Square Footage: 3706 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-445-2012 |
| Location Address: 10 BLUE OAK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/07/2021 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: DUTT WILLIAM M & MELANIE M H&W |
|
Address 17652 WEST MILL CREEK CROSSING DR GURNEE, IL 60031 |
| Lot: 0910 |
| Contracted Stated Job Value: ¤380,214.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
TRAVIS MIDDLETON
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2680 HIGHWAY 17 SOUTH CRESCENT CITY, FL 32112 |
00714 (Exp: 11/24/2022) | 386-698-1033 | 386-698-1077 |
MARK B SOWERS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
609 FOURTH ST BUNNELL, FL 32110 |
35616 (Exp: 08/31/2026) | 386-225-1753 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/17/2022 | FINAL APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 08/16/2022 | CANCELLED BY APPLICANT | AGAETANO |
| U -UTILITY RESIDENTIAL FINAL | 08/16/2022 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/15/2022 | APPROVED | PFLANAGAN |
| Note: THIS IS A REINSPECTION THERE ARE LOW AREAS IN LOT THAT ARE HOLDING WATER NEED TO FIX ALL AREAS | |||
| ROW - STORMWATER FINAL | 08/15/2022 | FINAL APPROVED | PFLANAGAN |
| U-CROSS CONNECTION | 08/15/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has reclaim irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 08/15/2022 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/12/2022 | APPROVED | PFLANAGAN |
| Note: Inspector Notes from Inspection 9270 2/26/22 READY TO POUR SIDEWALK ALL CORRECTIONS MADE ----------------------------------------------------------------------------------------------------------------------------------- THE LEFT SIDEWALK IS PITCHED TO THE HOUSE NEED TO BE PITCHED TO THE ROAD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/12/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: THERE ARE LOW AREAS IN LOT THAT ARE HOLDING WATER NEED TO FIX ALL AREAS | |||
| GAS FINAL | 08/12/2022 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 07/26/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: 2/26/22 READY TO POUR SIDEWALK ALL CORRECTIONS MADE ----------------------------------------------------------------------------------------------------------------------------------- THE LEFT SIDEWALK IS PITCHED TO THE HOUSE NEED TO BE PITCHED TO THE ROAD | |||
| ROW- PRE-APRON (PRE-POUR) | 07/25/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE LEFT SIDEWALK IS PITCHED TO THE HOUSE NEED TO BE PITCHED TO THE ROAD | |||
| ROW- PRE-APRON (PRE-POUR) | 05/16/2022 | APPROVED | PFLANAGAN |
| U - SEWER TIE IN | 04/13/2022 | APPROVED | LMILLER |
| GRAVITY SEWER TEST | 04/13/2022 | APPROVED | LMILLER |
| ELECTRIC - EARLY POWER | 03/23/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 12:51 am | |||
| LATH/BRICK/ WATER BARRIER | 12/15/2021 | APPROVED | JWALKER |
| INSULATION | 12/14/2021 | APPROVED | JWALKER |
| Note: need SP4 at garage walk dpor king by insulation | |||
| ALL ROUGH | 12/06/2021 | APPROVED - AS NOTED | LMILLER |
| Note: THIS IS A REINSPECTION 1. still need revision for truss repair at truss C7 (near front entry) by all-rough 2. missing SP4 at garage walk door 3. need nail plates on electric at kitchen island ends 4. missing all walk doors (this item can be looked at durring the insulation inspection) 12-06-21... need SP4 at garage walk dpor king by insulation | |||
| GAS ROUGH | 12/02/2021 | PARTIALLY APPROVED | MGIBSON |
| Note: ANOTHER GAS ROUGH INSPECTION REQUIRED WHEN TANK IS INSTALLED AND LINE RAN FROM TANK TO HOUSE | |||
| ALL ROUGH | 12/01/2021 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. still need revision for truss repair at truss C7 (near front entry) by all-rough 2. missing SP4 at garage walk door 3. need nail plates on electric at kitchen island ends 4. missing all walk doors (this item can be looked at durring the insulation inspection) | |||
| ROOF VALLEY & METAL | 09/09/2021 | APPROVED | LMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/07/2021 | APPROVED - AS NOTED | LMILLER |
| Note: need revision for truss repair at truss C7 (near front entry) by all-rough | |||
| ELECTRIC-TUG | 08/31/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:35 | |||
| TIE BEAM / LINTEL | 08/18/2021 | APPROVED | WMILLER |
| ELEV CERT-FOUNDATION APPROVAL | 08/17/2021 | APPROVED | JMYERS |
| FOUND SURVEY APPROVED (OFFICE) | 08/17/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/26/2021 | APPROVED | WMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/20/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 06/01/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/17/2022 | 08/18/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 08/11/2022 | 08/12/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| PLFM | COMPLETE | 08/17/2021 | 08/17/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| ENGIN1 | COMPLETE | 08/16/2021 | 08/17/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/16/2021 | 08/16/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 04/27/2021 | 04/27/2021 |
| Note: Released By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been approved. However, at Foundation, the measurement box needs to be checked for C2e. | |||
| PLFM | HOLD | 04/26/2021 | 04/26/2021 |
| Note: Held By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 4/22/21, the structure will be inside the Special Flood Hazard Area. Elevation certificates will be required at construction, foundation, and final. | |||
| BLD | COMPLETE | 04/22/2021 | 04/30/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/22/2021 | 04/27/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 04/22/2021 | 04/23/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/22/2021 | 04/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/22/2021 | 04/27/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/22/2021 | 04/22/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/22/2021 | 04/22/2021 |
| Note: Released By: BARBIE BEMBRY - - BUILDINGDIVISION@PALMCOASTGOV.COM THE NOC submitted is not notarized properly The printed name of the person(s) whom name is being notarized is required for a notary. Please correct and re-record the correct version. | |||
| ZON | COMPLETE | 04/22/2021 | 04/26/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/19/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/19/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/19/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/19/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/19/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/07/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤94.17) | 05/07/2021 |
| SEWER INSPECTION | ¤25.00 | 05/07/2021 |
| CONNECTION FEES | ¤25.00 | 05/07/2021 |
| METER - DEPOSIT | ¤60.00 | 05/07/2021 |
| WATER-METER | ¤441.07 | 05/07/2021 |
| WATER-METER | ¤366.42 | 05/07/2021 |
| ADMIN FEE | ¤20.00 | 05/07/2021 |
| BUILDING DISCOUNT 100% | (¤1,800.20) | 05/07/2021 |
| ELECTRIC FEE | ¤288.60 | 05/07/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/07/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/07/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/07/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/07/2021 |
| IMPACT FEE TRANSPORTATION | ¤3,139.00 | 05/07/2021 |
| MECHANICAL FEE | ¤288.60 | 05/07/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/07/2021 |
| PLAN CHECK FEE | ¤152.40 | 05/07/2021 |
| PLUMBING FEE | ¤288.60 | 05/07/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤762.00 | 05/07/2021 |
| SITE PLAN 20 | ¤20.00 | 05/07/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/07/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/07/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,360.46 |