Permit #2021041306
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-1340 |
| CONDITIONED SPACE: 3056 sqft |
| OPENED PORCH (WITH ROOF) : 474 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| GARAGE: 892 sqft |
| GARAGE: 91 sqft |
| Total Square Footage: 4585 sqft |
| Block: 0 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-445-2012 |
| Location Address: 179 WILLOW OAK WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/13/2021 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: BEER MICHAEL ALEXANDER |
|
Address & ELIZABETH JOAN BEER TRUSTEES LA QUINTA, CA 32137 |
|
Address 81790 LA PAZ COURT LA QUINTA, CA 32137 |
| Lot: 134 |
| Contracted Stated Job Value: ¤563,833.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/20/2022 | FINAL APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION 1. EXTERIOR DOOR LIGHTS…. each exterior door shall have a light and switch R 3903.3 2. need revision for mini split a/c in garage | |||
| BLD - BUILDING FINAL | 07/19/2022 | Disapproved - NO FEE | LMILLER |
| Note: 1. EXTERIOR DOOR LIGHTS…. each exterior door shall have a light and switch R 3903.3 2. need revision for mini split a/c in garage | |||
| U -UTILITY RESIDENTIAL FINAL | 07/19/2022 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION please lower and use flush mount cap on 6inch riser clean out pipe (make flush with grade) Also change out sewer clean out cap next to the house so that it is a screw cap that can be easily removed as well as make the 4inch clean out cap that is next to the 6inch ,flush with grades(needs lowering) and as a side note ,please just use the 6inch clean out that is already there, you dont need to add an additional 4 inch clean out. | |||
| U-CROSS CONNECTION | 07/18/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has reclaim irrigation-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 07/18/2022 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: please lower and use flush mount cap on 6inch riser clean out pipe (make flush with grade) Also change out sewer clean out cap next to the house so that it is a screw cap that can be easily removed as well as make the 4inch clean out cap that is next to the 6inch ,flush with grades(needs lowering) and as a side note ,please just use the 6inch clean out that is already there, you dont need to add an additional 4 inch clean out. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/15/2022 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 07/15/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: LOOKS GOOD AT TIME OF INSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 07/15/2022 | APPROVED | PFLANAGAN |
| FINAL SURVEY (OFFICE USE ONLY) | 07/15/2022 | APPROVED | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 05/05/2022 | APPROVED | EMADISON |
| ROW- PAVER RESTRAINTS | 04/21/2022 | APPROVED | RGROSS |
| U - SEWER TIE IN | 04/13/2022 | APPROVED | LMILLER |
| GRAVITY SEWER TEST | 04/13/2022 | APPROVED | LMILLER |
| ELECTRIC - EARLY POWER | 01/31/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: 1/31/22 Emailed FPL @ 1:55 PM | |||
| LATH/BRICK/ WATER BARRIER | 12/03/2021 | APPROVED | RMARTIN |
| INSULATION | 11/29/2021 | APPROVED | LMILLER |
| ALL ROUGH | 11/04/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION the following note was added at roof sheathing braces ties inspection with a request to resolve by all-rough... OK to proceede at contractors risk pending approval of engeneering that was produced onsite for inspection (need to be submitted and approved and on site by all-rough inspection. 11-02-21... the note above was not resolved... revision needed for repair of altered trusses | |||
| ALL ROUGH | 11/02/2021 | Disapproved -FEE REQUIRED | LMILLER |
| Note: the following note was added at roof sheathing braces ties inspection with a request to resolve by all-rough... OK to proceede at contractors risk pending approval of engeneering that was produced onsite for inspection (need to be submitted and approved and on site by all-rough inspection. 11-02-21... the note above was not resolved... revision needed for repair of altered trusses | |||
| ELECTRIC-TUG | 10/06/2021 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION SERVICE IS MISSING A 150A MAIN BREAKER, PLAN CALLS FOR 300A SERVICE 10-06-21... notes above resolved | |||
| ELECTRIC-TUG | 10/01/2021 | CANCELLED BY APPLICANT | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION SERVICE IS MISSING A 150A MAIN BREAKER, PLAN CALLS FOR 300A SERVICE | |||
| ELECTRIC-TUG | 09/29/2021 | CANCELLED BY APPLICANT | RMARTIN |
| Note: THIS IS A REINSPECTION SERVICE IS MISSING A 150A MAIN BREAKER, PLAN CALLS FOR 300A SERVICE | |||
| ELECTRIC-TUG | 09/28/2021 | Disapproved - NO FEE | RMARTIN |
| Note: SERVICE IS MISSING A 150A MAIN BREAKER, PLAN CALLS FOR 300A SERVICE | |||
| ROOF VALLEY & METAL | 09/07/2021 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION maximum spacing on fasteners in between rows exceeded (12 inch max) 9-7-21... notes above resolved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/07/2021 | APPROVED - AS NOTED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 8-31-21... Midroof inspection was missed and shingles were applied prior to approval. Met crew onsite for destructive inspection and found underlayment did not meet the requirements for spacing on nails and ecceeded spacing between some rows where crew opened the roof, and nails were not 12 OC where they needed to be and were not 6 OC at overlaps). Owens Corning Shingles not nailed as per manufacturer details. Must remove all applied shingles and replace underlayment in that area and place up to 25% shingles for inspection. 8-31-21... the notes above were placed on the inspection by system error, notes on underlayment and shingles do not apply to theis inspection..... need revision for engineers repair of altered trusses (down legs cut left side bearing wall after entering front door) 9-7-21... passed as noted, OK to proceede at contractors risk pending approval of engeneering that was produced onsite for inspection (need to be submitted and approved and on site by all-rough inspection. | |||
| ROOF VALLEY & METAL | 08/31/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: maximum spacing on fasteners in between rows exceeded (12 inch max) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/31/2021 | Disapproved - NO FEE | WMILLER |
| Note: THIS IS A REINSPECTION 8-31-21... Midroof inspection was missed and shingles were applied prior to approval. Met crew onsite for destructive inspection and found underlayment did not meet the requirements for spacing on nails and ecceeded spacing between some rows where crew opened the roof, and nails were not 12 OC where they needed to be and were not 6 OC at overlaps). Owens Corning Shingles not nailed as per manufacturer details. Must remove all applied shingles and replace underlayment in that area and place up to 25% shingles for inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/31/2021 | Disapproved - NO FEE | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 8-31-21... Midroof inspection was missed and shingles were applied prior to approval. Met crew onsite for destructive inspection and found underlayment did not meet the requirements for spacing on nails and ecceeded spacing between some rows where crew opened the roof, and nails were not 12 OC where they needed to be and were not 6 OC at overlaps). Owens Corning Shingles not nailed as per manufacturer details. Must remove all applied shingles and replace underlayment in that area and place up to 25% shingles for inspection. 8-31-21... the notes above were placed on the inspection by system error, notes on underlayment and shingles do not apply to theis inspection..... need revision for engineers repair of altered trusses (down legs cut left side bearing wall after entering front door) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/24/2021 | CANCELLED BY APPLICANT | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 08/20/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 08/11/2021 | FINAL APPROVED | WMILLER |
| ELEV CERT-FOUNDATION APPROVAL | 08/10/2021 | APPROVED | JMYERS |
| MONOLITHIC SLAB | 07/14/2021 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/01/2021 | APPROVED | WMILLER |
| WATER METER INSTALLATION REQUEST | 06/18/2021 | APPROVED | CSTONE |
| WILDLIFE CHECK - ENVIRONMENTAL | 06/16/2021 | APPROVED | JMYERS |
Review History
| Department | Status | Date In | Date Out |
| ELEC | HOLD | 07/19/2022 | 07/20/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit new electric load calcs shwoing the mini split | |||
| MECH | COMPLETE | 07/19/2022 | 07/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/18/2022 | 07/18/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 07/15/2022 | 07/15/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| BLD | COMPLETE | 11/03/2021 | 11/03/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/09/2021 | 08/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/09/2021 | 08/10/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 08/09/2021 | 08/10/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been accepted. Please provide Final prior to receiving CO. | |||
| MECH | COMPLETE | 05/03/2021 | 05/03/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 05/03/2021 | 05/03/2021 |
| Note: Released By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Gopher Tortoise Protection Plan has been accepted, a Wildlife inspection has been added so staff can verify the silt fencing around the burrow. Please notify staff prior to clearing so the inspection can be scheduled. | |||
| SW1 | COMPLETE | 05/03/2021 | 05/05/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/03/2021 | 05/04/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/03/2021 | 05/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 04/26/2021 | 04/26/2021 |
| Note: Released By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate is approved. However, at Foundation, the measurement box needs to be checked for C2e and C2d needs to be rounded correctly based on the Foundation Survey. | |||
| PLENV | HOLD | 04/26/2021 | 04/26/2021 |
| Note: Held By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM Staff has been made aware of a Gopher Tortoise on the property. Please provide a copy of the Approved After Action Report after relocation activities have been completed. | |||
| BLD | COMPLETE | 04/22/2021 | 04/29/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/22/2021 | 04/27/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 04/22/2021 | 04/23/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/22/2021 | 04/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/22/2021 | 05/03/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/22/2021 | 04/26/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs does not match the site plan. Revise to match | |||
| SW1 | COMPLETE | 04/22/2021 | 04/28/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/22/2021 | 04/26/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | PENDING |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/20/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/20/2022 |
| REINSPECTION FEE | ¤40.00 | 07/20/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/20/2022 |
| METER - DEPOSIT | ¤60.00 | 05/13/2021 |
| WATER-METER | ¤441.07 | 05/13/2021 |
| WATER-METER | ¤366.42 | 05/13/2021 |
| ADMIN FEE | ¤20.00 | 05/13/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,128.00 | 05/13/2021 |
| SITE PLAN 20 | ¤20.00 | 05/13/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/13/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/13/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/13/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤94.17) | 05/13/2021 |
| SEWER INSPECTION | ¤25.00 | 05/13/2021 |
| CONNECTION FEES | ¤25.00 | 05/13/2021 |
| BUILDING DISCOUNT 100% | (¤2,568.80) | 05/13/2021 |
| ELECTRIC FEE | ¤398.40 | 05/13/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/13/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/13/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/13/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/13/2021 |
| IMPACT FEE TRANSPORTATION | ¤3,139.00 | 05/13/2021 |
| MECHANICAL FEE | ¤398.40 | 05/13/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/13/2021 |
| PLAN CHECK FEE | ¤225.60 | 05/13/2021 |
| PLUMBING FEE | ¤398.40 | 05/13/2021 |
| PLAN REVIEW - REVISION | ¤32.50 | |
| Fees | Total Due: ¤32.50 | Total Paid: ¤9,337.96 |