I want to search for...
Permit #2021041353
Permit Details
Status: COED
| Parcel Id: 07-11-31-7013-00030-0110 |
| CONDITIONED SPACE: 1449 sqft |
| GARAGE: 418 sqft |
| OPENED PORCH (WITH ROOF) : 84 sqft |
| Total Square Footage: 1951 sqft |
| Block: 00030 |
| Subdivision: 2192 - SECTION 13-BELLE TERRE |
| Job Phone: 321-249-3126 |
| Location Address: 19 BRACKEN LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/05/2021 |
| NOC: RECORDED |
| Applicant name: MOREY C DOYLE |
| Owner: WJHFL LLC D/B/A WJH LLC A DELAWARE |
|
Address 3091 GOVERNORS LAKE DRIVE SUITE 300 NORCROSS, GA 30071 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤101,430.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
WADE JURNEY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
3091 GOVERNORS LAKE DRIVE NORCROSS, GA 30071 |
CGC1517458 (Exp: 08/31/2022) | 321-249-3126 |
Sub Contractors
EDWIN R INSALACO
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
3191 MAGUIRE BLVD ORLANDO, FL 32803 |
STE 200 ORLANDO, FL 32803 |
EC13001310 (Exp: 08/31/2024) | 321-441-7990 | 407-426-9741 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
IAN ALAN BRENNER
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
691 GARDEN COMMERCE PKWY WINTER GARDEN, FL 34787 |
STE 170 WINTER GARDEN, FL 34787 |
CCC1331270 (Exp: 08/31/2026) | 407-649-1333 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 10/28/2021 | APPROVED | KRUTH |
| Note: THIS IS A REINSPECTION the expansion cuts are not in the drive way sod is not around the driveway for sediment erosion corrections made | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/28/2021 | APPROVED - AS NOTED | KRUTH |
| Note: left side swale is too high at the property line lower the swale sod is to be lower than the edge of the road and it as 3 tenths higher on the left side sod is not finished corrections made 10/28 | |||
| ROW - STORMWATER FINAL | 10/28/2021 | APPROVED | KRUTH |
| Note: THIS IS A REINSPECTION these inspections are to be scheduled when work is completed | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/27/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION left side swale is too high at the property line lower the swale sod is to be lower than the edge of the road and it as 3 tenths higher on the left side sod is not finished | |||
| U -UTILITY RESIDENTIAL FINAL | 10/27/2021 | FINAL APPROVED | DHANEY |
| Note: THIS IS A REINSPECTION Can not locate sewer clean out at street arera . Corrections made. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/26/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION left side swale is too high at the property line lower the swale sod is to be lower than the edge of the road and it as 3 tenths higher on the left side | |||
| ROW - FINAL APRON (AFTER POUR) | 10/26/2021 | Disapproved - NO FEE | KRUTH |
| Note: the expansion cuts are not in the drive way sod is not around the driveway for sediment erosion | |||
| U -UTILITY RESIDENTIAL FINAL | 10/26/2021 | Disapproved - NO FEE | DHANEY |
| Note: Can not locate sewer clean out at street arera . | |||
| ROW - STORMWATER FINAL | 10/26/2021 | Disapproved - NO FEE | KRUTH |
| Note: these inspections are to be scheduled when work is completed | |||
| BLD - BUILDING FINAL | 10/26/2021 | Approval - Private Provider | PPROVIDER |
| FINAL SURVEY (OFFICE USE ONLY) | 10/25/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/25/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: left side swale is too high at the property line lower the swale sod is to be lower than the edge of the road and it as 3 tenths higher on the left side | |||
| ROW- PRE-APRON (PRE-POUR) | 10/12/2021 | APPROVED - AS NOTED | KRUTH |
| Note: the pipe is bent really bad on the left side this needs to be fixed before you pour pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| GRAVITY SEWER TEST | 10/11/2021 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 10/07/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/06/2021 | APPROVED - AS NOTED | CSTONE |
| Note: already installed | |||
| LATH/BRICK/ WATER BARRIER | 10/05/2021 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 10/04/2021 | APPROVED | DHANEY |
| FOUND SURVEY APPROVED (OFFICE) | 10/04/2021 | APPROVED | TBAKER |
| ELECTRIC - EARLY POWER | 09/20/2021 | Approval - Private Provider | PPROVIDER |
| INSULATION | 09/17/2021 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 08/11/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 07/26/2021 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 07/21/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/21/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 07/08/2021 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 06/30/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/28/2021 | Approval - Private Provider | PPROVIDER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/01/2021 | 10/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/01/2021 | 10/01/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/01/2021 | 05/03/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ZON | COMPLETE | 05/01/2021 | 05/04/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| LOCATE | COMPLETE | 05/01/2021 | 05/03/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/01/2021 | 05/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/01/2021 | 05/05/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/23/2021 | 04/29/2021 |
| Note: Released By: JPI | |||
| CUSVC | HOLD | 04/23/2021 | 04/27/2021 |
| Note: Held By: HALEIGH HAND - - Please correct the utility application to reflect the correct parcel number. | |||
| ELEC | COMPLETE | 04/23/2021 | 04/26/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/23/2021 | 04/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/23/2021 | 04/28/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/23/2021 | 04/26/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/23/2021 | 04/29/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/23/2021 | 04/28/2021 |
| Note: Held By: ESTELLE LENS - (386)986-2655 - Need to correct FEMA map panel number (...0136E) | |||
| SWALE | COMPLETE | 04/23/2021 | 05/05/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 10/27/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 10/26/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 10/26/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 10/26/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/05/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 05/05/2021 |
| SEWER INSPECTION | ¤25.00 | 05/05/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 05/05/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 05/05/2021 |
| METER - DEPOSIT | ¤60.00 | 05/05/2021 |
| WATER- TURN ON | ¤25.00 | 05/05/2021 |
| ADMIN FEE | ¤20.00 | 05/05/2021 |
| CONNECTION FEES | ¤1,017.83 | 05/05/2021 |
| BUILDING DISCOUNT 100% | (¤960.20) | 05/05/2021 |
| ELECTRIC FEE | ¤168.60 | 05/05/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/05/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/05/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/05/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/05/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 05/05/2021 |
| MECHANICAL FEE | ¤168.60 | 05/05/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/05/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/05/2021 |
| PLAN CHECK FEE | ¤72.40 | 05/05/2021 |
| PLUMBING FEE | ¤168.60 | 05/05/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤362.00 | 05/05/2021 |
| SITE PLAN 20 | ¤20.00 | 05/05/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/05/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/05/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,211.43 |