Status: COED

Parcel Id: 07-11-31-7028-00750-0120
CONDITIONED SPACE: 2550 sqft
GARAGE: 1275 sqft
OPENED PORCH (WITH ROOF) : 367 sqft
OPENED PORCH (WITH ROOF) : 63 sqft
OPENED PORCH (WITH ROOF) : 14 sqft
Total Square Footage: 4269 sqft
Block: 00750
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: (386) 246-6123
Location Address: 23 POINCIANA LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/13/2021
NOC: RECORDED
Applicant name: BRIAN ANDREW GAZZOLI
Owner: FAIR WILBUR Z III & TOSHA L ROMANOFF JTWROS

Address

165 TYOAKA DRIVE

LITTLESTOWN, PA 17340

Lot: 0120
Contracted Stated Job Value: ¤307,057.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SEAGATE HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

185 CYPRESS POINT PARKWAY

Palm Coast, FL 32137

SUITE 7

Palm Coast, FL 32137

CGC1518372 (Exp: 08/31/2026) 386-246-6132

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 02/02/2022 APPROVED - AS NOTED JHARDING
Note: No cross connections.
U -UTILITY RESIDENTIAL FINAL 02/01/2022 FINAL APPROVED JHARDING
BLD - BUILDING FINAL 02/01/2022 FINAL APPROVED KSANDOE
ROW - STORMWATER FINAL 01/31/2022 APPROVED - AS NOTED GBERTOLA
Note: RIGHT SIDE OF HOME FACING FROM STREET LOW AREA BY PEP INPACTING ADJACENT PROPERTY 01/31/2022=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - FINAL APRON (AFTER POUR) 01/27/2022 APPROVED - AS NOTED PFLANAGAN
Note: AT TIME OF INSPECTION LOOKS GOOD
ROW FIELD SURVEY /GRADING CERTIFICATION 01/27/2022 APPROVED - AS NOTED PFLANAGAN
Note: LOOK GOOD AT TIME OF INSPECTION
FINAL SURVEY (OFFICE USE ONLY) 01/27/2022 APPROVED - AS NOTED PFLANAGAN
Note: LOOK GOOD AT TIME OF INSPECTION
ROW- PRE-APRON (PRE-POUR) 12/13/2021 APPROVED RGROSS
Note: READY TO POUR
ELECTRIC - EARLY POWER 12/01/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 8:54 am
GRAVITY SEWER TEST 10/26/2021 APPROVED MGIBSON
U - SEWER TIE IN 10/26/2021 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 10/05/2021 APPROVED KSANDOE
INSULATION 10/01/2021 APPROVED KSANDOE
PEP TANK INSTALLATION REQUEST 10/01/2021 APPROVED CSTONE
ALL ROUGH 09/24/2021 APPROVED - AS NOTED KSANDOE
Note: Window Nailing inspection added. dryer vent needs sealed at the box
ROOF VALLEY & METAL 09/08/2021 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/31/2021 APPROVED DCUSHING
ROW - DRAINAGE 08/26/2021 APPROVED GBERTOLA
Note: SWALE IS OPEN PIPE IS DOWN AND OPEN
TIE BEAM / LINTEL 08/02/2021 APPROVED JWALKER
Note: THIS IS A REINSPECTION Missing dowel inside left corner of the covered lania area. And two dowels same area need to be set in epoxy properly.
TIE BEAM / LINTEL 07/30/2021 Disapproved - NO FEE JWALKER
Note: Missing dowel inside left corner of the covered lania area. And two dowels same area need to be set in epoxy properly.
ROW - DRAINAGE 07/29/2021 APPROVED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Remove blockage in the swale or install 12" temporary culvert pipe Reinspection on Monday 19th 7/19/21 - Temporary Culvert in place. Next inspection 7/29/21. -7/29/2021=correction were made
ROW - DRAINAGE 07/19/2021 PARTIALLY APPROVED RGROSS
Note: THIS IS A REINSPECTION Remove blockage in the swale or install 12" temporary culvert pipe Reinspection on Monday 19th 7/19/21 - Temporary Culvert in place. Next inspection 7/29/21.
ROW - DRAINAGE 07/13/2021 Disapproved - NO FEE CTROHA
Note: Remove blockage in the swale or install 12" temporary culvert pipe Reinspection on Monday 19th
FOUND SURVEY APPROVED (OFFICE) 07/08/2021 APPROVED TBAKER
MONOLITHIC SLAB 06/21/2021 APPROVED JWALKER
PLUMBING 1ST ROUGH UNDERGROUND 06/17/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 05/21/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 07/07/2021 07/08/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/07/2021 07/07/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
BLD COMPLETE 05/25/2021 06/02/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
BLD HOLD 05/17/2021 05/24/2021
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision- change bearing post location. Identify location of bearing post on revised plans by "clouded" symbol/legend for clarity per FBC 7th Ed.Sec. 107.2.1.
ZON COMPLETE 05/11/2021 05/13/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
ELEC COMPLETE 04/30/2021 05/03/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 04/30/2021 05/05/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 04/30/2021 04/30/2021
Note: Held By: ESTELLE LENS - (386)986-2655 - Termination of easements agreement has been forwarded to the builder for signatures. Please submit the originally signed and notarized agreement for recording.
ENGIN1 COMPLETE 04/30/2021 04/30/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 04/23/2021 04/29/2021
Note: Released By: JPI
CUSVC COMPLETE 04/23/2021 04/28/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 04/23/2021 04/26/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Electric load calcs do not match the square footage of the house
ENGIN1 COMPLETE 04/23/2021 04/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 04/23/2021 04/29/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 04/23/2021 04/26/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 04/23/2021 04/29/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 04/23/2021 04/28/2021
Note: Held By: ESTELLE LENS - (386)986-2655 - Please provide a survey and site plan showing all platted easements; including the easements that are being requested to be terminated. The termination of easements documents have been received. City Engineering and Utilities will be contacted to confirm there is no objection to releasing the easements. Once confirmed, the termination of easements agreement will be prepared for signatures.
SWALE COMPLETE 04/23/2021 07/20/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 02/02/2022
BUILDING DISCOUNT 100% (¤1,686.80) 05/13/2021
ELECTRIC FEE ¤272.40 05/13/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 05/13/2021
IMPACT FEE FIRE ¤367.00 05/13/2021
IMPACT FEE PARKS ¤1,199.12 05/13/2021
IMPACT FEE SCHOOL ¤3,600.00 05/13/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 05/13/2021
MECHANICAL FEE ¤272.40 05/13/2021
WATER -IRRIGATION INSPECTION ¤25.00 05/13/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 05/13/2021
PLAN CHECK FEE ¤141.60 05/13/2021
PLUMBING FEE ¤272.40 05/13/2021
NEW RESIDENTIAL INSPECTIONS ¤708.00 05/13/2021
SITE PLAN 20 ¤20.00 05/13/2021
SURCHARGE FS 533.721 ¤2.00 05/13/2021
SURCHARGE - FS 468.631 ¤2.00 05/13/2021
STORM WATER PERMIT FEES ¤80.00 05/13/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 05/13/2021
SEWER CREDIT (¤650.00) 05/13/2021
SEWER INSPECTION ¤25.00 05/13/2021
SEWER CAPITAL FACILITY ¤4,664.55 05/13/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 05/13/2021
METER - DEPOSIT ¤60.00 05/13/2021
WATER- TURN ON ¤25.00 05/13/2021
ADMIN FEE ¤20.00 05/13/2021
CONNECTION FEES ¤1,017.83 05/13/2021