I want to search for...
Permit #2021041381
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00390-0170 |
| CONDITIONED SPACE: 1246 sqft |
| GARAGE: 404 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| Total Square Footage: 1704 sqft |
| Block: 00390 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 321-249-3126 |
| Location Address: 33 RYBERRY DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/12/2021 |
| NOC: RECORDED |
| Applicant name: MOREY C DOYLE |
| Owner: WJHF LLC D/B/A A DELAWARE LIMITED |
|
Address 3091 GOVERNORS LAKE DRIVE SUITE 300 NORCROSS , GA 30071 |
| Lot: 0170 |
| Contracted Stated Job Value: ¤87,220.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
WADE JURNEY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
3091 GOVERNORS LAKE DRIVE NORCROSS, GA 30071 |
CGC1517458 (Exp: 08/31/2022) | 321-249-3126 |
Sub Contractors
EDWIN R INSALACO
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
3191 MAGUIRE BLVD ORLANDO, FL 32803 |
STE 200 ORLANDO, FL 32803 |
EC13001310 (Exp: 08/31/2024) | 321-441-7990 | 407-426-9741 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
IAN ALAN BRENNER
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
691 GARDEN COMMERCE PKWY WINTER GARDEN, FL 34787 |
STE 170 WINTER GARDEN, FL 34787 |
CCC1331270 (Exp: 08/31/2026) | 407-649-1333 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 10/29/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION need to remove the dumpster from the swale across street, SWALE DAMAGE NEED TO BE COMPLETELY REPAIR AND RE-SOD. ALL RUTS AND BARE SPOTS MUST BE FILLED AND SODDED, NOT SEEDED OR COVERED W/STRAW AND/OR PINE NEEDLE 10/29/2021=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U -UTILITY RESIDENTIAL FINAL | 10/28/2021 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 10/28/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: need to remove the dumpster from the swale across street, SWALE DAMAGE NEED TO BE COMPLETELY REPAIR AND RE-SOD. ALL RUTS AND BARE SPOTS MUST BE FILLED AND SODDED, NOT SEEDED OR COVERED W/STRAW AND/OR PINE NEEDLE | |||
| ROW - FINAL APRON (AFTER POUR) | 10/28/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/27/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION I NEED ELEVATION ON THE FINAL SURVEY | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/27/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION I NEED ELEVATION ON THE FINAL SURVEY | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/26/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: I NEED ELEVATION ON THE FINAL SURVEY | |||
| BLD - BUILDING FINAL | 10/26/2021 | Approval - Private Provider | PPROVIDER |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/26/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: I NEED ELEVATION ON THE FINAL SURVEY | |||
| ROW- PRE-APRON (PRE-POUR) | 10/12/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION the pipe invert is good but the end of the pipe is bent 3 tenths up so due to the pipe being bent i can not pass the inspection 10/11/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE 10/12/21 - Pipe straightened out. READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 10/11/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION the pipe invert is good but the end of the pipe is bent 3 tenths up so due to the pipe being bent i can not pass the inspection 10/11/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE | |||
| U-CROSS CONNECTION | 10/11/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 10/08/2021 | CANCELLED BY APPLICANT | GBERTOLA |
| Note: THIS IS A REINSPECTION the pipe invert is good but the end of the pipe is bent 3 tenths up so due to the pipe being bent i can not pass the inspection LEFT SIDE OF THE CULVER PIPE NEED TO BE 8 FT FROM THE EDGE OF THE ROAD NEED TO BRING THE CULVERT 8 INCH CLOSE TO THE EDGE | |||
| ROW- PRE-APRON (PRE-POUR) | 10/07/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: the pipe invert is good but the end of the pipe is bent 3 tenths up so due to the pipe being bent i can not pass the inspection | |||
| GRAVITY SEWER TEST | 10/01/2021 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 10/01/2021 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 10/01/2021 | APPROVED | MGIBSON |
| INSULATION | 08/25/2021 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 08/24/2021 | Approval - Private Provider | PPROVIDER |
| Note: 08/24/2021 Wire Lath Inspection passed. | |||
| PEP TANK INSTALLATION REQUEST | 08/24/2021 | APPROVED | CSTONE |
| FOUND SURVEY APPROVED (OFFICE) | 08/23/2021 | APPROVED | TBAKER |
| ALL ROUGH | 08/23/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 08/02/2021 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 07/26/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/26/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 07/19/2021 | Approval - Private Provider | PPROVIDER |
| Note: 07/19/2021 Lintel inspection passed. | |||
| MONOLITHIC SLAB | 07/08/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/23/2021 | Approval - Private Provider | PPROVIDER |
| Note: 06/23/2021 Underground plumbing inspection passed. | |||
| WATER METER INSTALLATION REQUEST | 06/02/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/23/2021 | 08/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/23/2021 | 08/23/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/12/2021 | 05/12/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/11/2021 | 05/12/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/11/2021 | 05/11/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Plat information incorrect on survey/site plan | |||
| BLD | COMPLETE | 04/23/2021 | 04/29/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/23/2021 | 04/29/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 04/23/2021 | 04/26/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need to reference the 2017 NEC | |||
| ENGIN1 | COMPLETE | 04/23/2021 | 04/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/23/2021 | 04/29/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/23/2021 | 04/26/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/23/2021 | 04/29/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/23/2021 | 04/27/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM This house backs to a street. Banding required around windows and doors facing the rear street. Flood panel number incorrect on survey In legal description on survey plat information incorrect | |||
| SWALE | COMPLETE | 04/23/2021 | 07/21/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 10/29/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 10/29/2021 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/29/2021 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/29/2021 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/29/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/12/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 05/12/2021 |
| SEWER CREDIT | (¤1,446.85) | 05/12/2021 |
| SEWER INSPECTION | ¤25.00 | 05/12/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 05/12/2021 |
| WATER CREDIT | (¤861.51) | 05/12/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 05/12/2021 |
| METER - DEPOSIT | ¤60.00 | 05/12/2021 |
| WATER- TURN ON | ¤25.00 | 05/12/2021 |
| ADMIN FEE | ¤20.00 | 05/12/2021 |
| CONNECTION FEES | ¤1,017.83 | 05/12/2021 |
| BUILDING DISCOUNT 100% | (¤859.40) | 05/12/2021 |
| ELECTRIC FEE | ¤154.20 | 05/12/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/12/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/12/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/12/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/12/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 05/12/2021 |
| MECHANICAL FEE | ¤154.20 | 05/12/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/12/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/12/2021 |
| PLAN CHECK FEE | ¤62.80 | 05/12/2021 |
| PLUMBING FEE | ¤154.20 | 05/12/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤314.00 | 05/12/2021 |
| SITE PLAN 20 | ¤20.00 | 05/12/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/12/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/12/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,943.07 |