I want to search for...
Permit #2021041428
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00550-0020 |
| CONDITIONED SPACE: 2114 sqft |
| OPENED PORCH (WITH ROOF) : 174 sqft |
| OPENED PORCH (WITH ROOF) : 34 sqft |
| GARAGE: 518 sqft |
| Total Square Footage: 2840 sqft |
| Block: 00550 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: (386) 672-8285 |
| Location Address: 10 PORCELLI PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/12/2021 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: LASRIS ROBERT & RHONDA LOVERO H&W |
|
Address 2 POINSETTIA LANE PALM COAST, FL 32164 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤201,999.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/05/2022 | Approval - Private Provider | PPROVIDER |
| Note: THIS IS A REINSPECTION ADDED ON 2/17/2022 3:45:03 PM Notice sent had this permit number, but different address - waiting for clarification. | |||
| ROW - STORMWATER FINAL | 05/04/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD NEED TO HAVE PORTER JOHN PICKED UP AND NEED TO SOD ALL BARE AREAS WITH SOD IN VACANT LOT TO THE RIGHT IN SWALE | |||
| U -UTILITY RESIDENTIAL FINAL | 04/27/2022 | FINAL APPROVED | LFITZGERALD |
| U-CROSS CONNECTION | 04/27/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation-no cross connection | |||
| ROW - STORMWATER FINAL | 04/27/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO HAVE PORTER JOHN PICKED UP AND NEED TO SOD ALL BARE AREAS WITH SOD IN VACANT LOT TO THE RIGHT IN SWALE | |||
| ROW - FINAL APRON (AFTER POUR) | 04/25/2022 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/25/2022 | APPROVED | EMADISON |
| FINAL SURVEY (OFFICE USE ONLY) | 04/25/2022 | APPROVED | EMADISON |
| ROW- PRE-APRON (PRE-POUR) | 03/17/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: ready to pour | |||
| BLD - BUILDING FINAL | 02/17/2022 | CANCELLED BY APPLICANT | BBEMBRY |
| Note: Notice sent had this permit number, but different address - waiting for clarification. | |||
| ELECTRIC - EARLY POWER | 01/19/2022 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 01/12/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 11/09/2021 | APPROVED | CSTONE |
| Note: 1/27/22 Missing Feed You need to do is have a designated electrical line ran to the side of the house that the PEP tank is located and stubbed outside. This electric is for the PEP control panel that gets mounted on that side of the house. Also note that this will delay all other processes for this system | |||
| GRAVITY SEWER TEST | 10/27/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 10/26/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/22/2021 | Approval - Private Provider | PPROVIDER |
| INSULATION | 10/14/2021 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 10/14/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 10/13/2021 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 10/11/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 08/24/2021 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 07/30/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/26/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/19/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 06/17/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 07/30/2021 | 07/30/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/30/2021 | 07/30/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/26/2021 | 06/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/26/2021 | 05/26/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/10/2021 | 05/10/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/06/2021 | 05/06/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ZON | HOLD | 05/06/2021 | 05/06/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a new landscape plan showing garage left | |||
| ENGIN1 | COMPLETE | 05/06/2021 | 05/06/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/06/2021 | 05/10/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| CUSVC | HOLD | 04/26/2021 | 04/27/2021 |
| Note: Held By: HALEIGH HAND - - Please correct the utility application to reflect the correct property address. | |||
| ENGIN1 | COMPLETE | 04/26/2021 | 04/26/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/26/2021 | 04/27/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/26/2021 | 05/03/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/26/2021 | 04/28/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Plans are for a garage left. Site and landscape are for a garage right. Please correct whichever is wrong. | |||
| SWALE | COMPLETE | 04/26/2021 | 07/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/05/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/12/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 05/12/2021 |
| SEWER CREDIT | (¤650.00) | 05/12/2021 |
| SEWER INSPECTION | ¤25.00 | 05/12/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 05/12/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 05/12/2021 |
| METER - DEPOSIT | ¤60.00 | 05/12/2021 |
| WATER- TURN ON | ¤25.00 | 05/12/2021 |
| ADMIN FEE | ¤20.00 | 05/12/2021 |
| CONNECTION FEES | ¤1,017.83 | 05/12/2021 |
| BUILDING DISCOUNT 100% | (¤20.00) | 05/12/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/12/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/12/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/12/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/12/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 05/12/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/12/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/12/2021 |
| SITE PLAN 20 | ¤20.00 | 05/12/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/12/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/12/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,501.43 |