I want to search for...
Permit #2021041678
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00250-0100 |
| CONDITIONED SPACE: 1905 sqft |
| GARAGE: 409 sqft |
| OPENED PORCH (WITH ROOF) : 177 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 2527 sqft |
| Block: 00250 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 321-610-3924 |
| Location Address: 20 WHITTLESEY LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/24/2021 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMBELL JR |
| Owner: VINTAGE ESTATE HOMES LLC |
|
Address 4885 N WICKHAM ROAD MELBOURNE, FL 32940 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
SUITE 101 MELBOURNE, FL 32940 |
CBC058803 (Exp: 08/31/2022) | 321-610-3924 |
Sub Contractors
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ZACHARY PETER BOERA
| Status | Location Address | State License Number | Phone |
| CANCEL |
7225 SANDSCOVE COURT, SUITE 1 WINTER PARK, FL 32792 |
CAC1817652 (Exp: 08/31/2022) | 407-629-6920 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/07/2022 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 06/06/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Front door Misaligned. Not closing properly. Owners suite: Toilet needs to be sealed around base. Grout in shower incomplete. Stopped inspection. | |||
| U-CROSS CONNECTION | 06/06/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 06/06/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - STORMWATER FINAL | 06/06/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U -UTILITY RESIDENTIAL FINAL | 06/06/2022 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/03/2022 | APPROVED | GBERTOLA |
| FINAL SURVEY (OFFICE USE ONLY) | 06/03/2022 | APPROVED | GBERTOLA |
| ELECTRIC - EARLY POWER | 05/05/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 1:45PM | |||
| ELECTRIC - EARLY POWER | 05/04/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Weather head is missing a screw for the clamp 2. Wiring for over head service needs to be UV rated NEC 310.10 (d) | |||
| ROW- PRE-APRON (PRE-POUR) | 04/26/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 4/21/22= NEED TO INSTALL FACE BOARD BY THE ROAD MISSING ONE REBAR, AND THE OTHER ONE IS SMALL . AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. 4/26/22 - READY TO POUR STILL SOFT AROUND THE CULVERT PIPE, CLEAR WATER IS RUNNING UNDER THE CULVERT PIPE. WAY TOO SOFT TO POUR DIDN'T CHECK THE CULVERT FOOTERS HAVE WASHED IN NEED TO BE DUG OUT, 4/20/22 - Culvert ends full of water. Could not tell if footers were dug. Water running clear through the pipe. Material too soft to pour. Builder may want to consider spreading some road base or rock in the ROW and along culvert to stabilize the ground enough to pour. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/25/2022 | CANCELLED BY APPLICANT | EMADISON |
| Note: THIS IS A REINSPECTION 4/21/22= NEED TO INSTALL FACE BOARD BY THE ROAD MISSING ONE REBAR, AND THE OTHER ONE IS SMALL . AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. STILL SOFT AROUND THE CULVERT PIPE, CLEAR WATER IS RUNNING UNDER THE CULVERT PIPE. WAY TOO SOFT TO POUR DIDN'T CHECK THE CULVERT FOOTERS HAVE WASHED IN NEED TO BE DUG OUT, 4/20/22 - Culvert ends full of water. Could not tell if footers were dug. Water running clear through the pipe. Material too soft to pour. Builder may want to consider spreading some road base or rock in the ROW and along culvert to stabilize the ground enough to pour. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/21/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 4/21/22= NEED TO INSTALL FACE BOARD BY THE ROAD MISSING ONE REBAR, AND THE OTHER ONE IS SMALL . AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. CULVERT PIPE IS GOOD STILL SOFT AROUND THE CULVERT PIPE, CLEAR WATER IS RUNNING UNDER THE CULVERT PIPE. WAY TOO SOFT TO POUR DIDN'T CHECK THE CULVERT FOOTERS HAVE WASHED IN NEED TO BE DUG OUT, 4/20/22 - Culvert ends full of water. Could not tell if footers were dug. Water running clear through the pipe. Material too soft to pour. Builder may want to consider spreading some road base or rock in the ROW and along culvert to stabilize the ground enough to pour. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/20/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION STILL SOFT AROUND THE CULVERT PIPE, CLEAR WATER IS RUNNING UNDER THE CULVERT PIPE. WAY TOO SOFT TO POUR DIDN'T CHECK THE CULVERT FOOTERS HAVE WASHED IN NEED TO BE DUG OUT, 4/20/22 - Culvert ends full of water. Could not tell if footers were dug. Water running clear through the pipe. Material too soft to pour. Builder may want to consider spreading some road base or rock in the ROW and along culvert to stabilize the ground enough to pour. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/12/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: STILL SOFT AROUND THE CULVERT PIPE, CLEAR WATER IS RUNNING UNDER THE CULVERT PIPE. WAY TOO SOFT TO POUR DIDN'T CHECK THE CULVERT FOOTERS HAVE WASHED IN NEED TO BE DUG OUT, | |||
| U - SEWER TIE IN | 03/03/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 02/11/2022 | APPROVED | CSTONE |
| INSULATION | 01/27/2022 | APPROVED | MKRASKI |
| LATH/BRICK/ WATER BARRIER | 01/27/2022 | APPROVED | MKRASKI |
| ALL ROUGH | 01/11/2022 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/09/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: MISSING BOLT AT GARAGE WALL, BY AIR HANDLER, NEED BY INSULATION | |||
| ROOF VALLEY & METAL | 12/09/2021 | APPROVED | RMARTIN |
| FOUND SURVEY APPROVED (OFFICE) | 10/20/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/12/2021 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 09/21/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Additional compaction needed in various areas including where plumbing was installed | |||
| MONOLITHIC SLAB | 09/20/2021 | Disapproved - NO FEE | KSANDOE |
| Note: Additional compaction needed in various areas including where plumbing was installed | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/09/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 09/09/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 08/31/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 06/13/2022 | 06/13/2022 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.) | |||
| ENGIN1 | COMPLETE | 10/19/2021 | 10/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/19/2021 | 10/19/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/03/2021 | 06/03/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/28/2021 | 05/28/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs does not match the site plan. Revise to match the site plan. (Second Request) | |||
| MECH | HOLD | 05/24/2021 | 05/24/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs does not match the site plan. Revise to match the site plan | |||
| MECH | HOLD | 05/07/2021 | 05/07/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Square footage on energy calcs and heatload does not match the plans. Revise to match | |||
| BLD | COMPLETE | 04/28/2021 | 05/05/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/28/2021 | 05/04/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 04/28/2021 | 04/29/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/28/2021 | 04/28/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/28/2021 | 04/30/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/28/2021 | 04/30/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs from 2020 7TH edition code cycle | |||
| SW1 | COMPLETE | 04/28/2021 | 05/04/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/28/2021 | 05/04/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/28/2021 | 05/28/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/13/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/13/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/13/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/24/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 08/24/2021 |
| SEWER CREDIT | (¤1,466.00) | 08/24/2021 |
| SEWER INSPECTION | ¤25.00 | 08/24/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 08/24/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 08/24/2021 |
| METER - DEPOSIT | ¤60.00 | 08/24/2021 |
| WATER- TURN ON | ¤25.00 | 08/24/2021 |
| ADMIN FEE | ¤20.00 | 08/24/2021 |
| CONNECTION FEES | ¤1,017.83 | 08/24/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 08/24/2021 |
| BUILDING DISCOUNT 100% | (¤1,250.00) | 08/24/2021 |
| ELECTRIC FEE | ¤210.00 | 08/24/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 08/24/2021 |
| IMPACT FEE FIRE | ¤367.00 | 08/24/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 08/24/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/24/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 08/24/2021 |
| MECHANICAL FEE | ¤210.00 | 08/24/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/24/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 08/24/2021 |
| PLAN CHECK FEE | ¤100.00 | 08/24/2021 |
| PLUMBING FEE | ¤210.00 | 08/24/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤500.00 | 08/24/2021 |
| SITE PLAN 20 | ¤20.00 | 08/24/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/24/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/24/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,795.43 |