I want to search for...
Permit #2021041697
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01390-0060 |
| CONDITIONED SPACE: 2331 sqft |
| GARAGE: 610 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| Total Square Footage: 3213 sqft |
| Block: 01390 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: (386) 672-8285 |
| Location Address: 105 EDWARD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/10/2021 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: WILSON WILLIAM M & SHEILA B WILSON H&W |
|
Address 460 UNION RD MATTHEWS, NC 28104 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤268,999.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING FINAL | 06/06/2022 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 06/06/2022 | Approval - Private Provider | MRAMOS |
| ELECTRIC FINAL | 06/06/2022 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 06/06/2022 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 06/02/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/02/2022 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/27/2022 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 05/27/2022 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 05/27/2022 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 05/27/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION FFE must be a minimum of 4 inches above the outside sod grade. Compare FFE 28.44 to right side grade of 28.22 at the outside finished grade. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 05/24/2022 | Disapproved - NO FEE | RGROSS |
| Note: FFE must be a minimum of 4 inches above the outside sod grade. Compare FFE 28.44 to right side grade of 28.22 at the outside finished grade. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/14/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: 4/14/22 ITS THE CONTRACTORS RESPONIBILITY TO CHECK CULVERT PIPE ELEVATION BEFORE POURING CONCRETE 4/12/22 THE LEFT PIPE IF YOUR FACEING HOUSE FROM STREET THE RIGHT INVERT OF PIPE IS HIGHER THAN LEFT INVERT OF CIRCLE PIPE BY .20 NEED TO BE MATCH THE INVERT ON RIGHT PIPE OR LITTLE LOWER 4/11/22 BUILDER NEED TO RE-ESTABLISH BENCH MARK | |||
| ROW- PRE-APRON (PRE-POUR) | 04/12/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 4/12/22 THE LEFT PIPE IF YOUR FACEING HOUSE FROM STREET THE RIGHT INVERT OF PIPE IS HIGHER THAN LEFT INVERT OF CIRCLE PIPE BY .20 NEED TO BE MATCH THE INVERT ON RIGHT PIPE OR LITTLE LOWER 4/11/22 BUILDER NEED TO RE-ESTABLISH BENCH MARK | |||
| ROW- PRE-APRON (PRE-POUR) | 04/11/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: BUILDER NEED TO RE-ESTABLISH BENCH MARK | |||
| ELECTRIC - EARLY POWER | 02/28/2022 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 02/10/2022 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 02/09/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 12/14/2021 | APPROVED | CSTONE |
| FOUND SURVEY APPROVED (OFFICE) | 12/08/2021 | APPROVED | TDOAK |
| INSULATION | 12/06/2021 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 12/01/2021 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 12/01/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 10/25/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/20/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 09/28/2021 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 08/13/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/12/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 07/27/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 12/08/2021 | 12/08/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/08/2021 | 12/08/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/10/2021 | 06/10/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/04/2021 | 06/07/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| ENGIN1 | COMPLETE | 06/04/2021 | 06/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/28/2021 | 05/28/2021 |
| Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM I reviewed the site plan at the contractors request and found it to be accurate. | |||
| SWALE | COMPLETE | 04/29/2021 | 07/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/28/2021 | 05/03/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ENGIN1 | COMPLETE | 04/28/2021 | 04/29/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/28/2021 | 04/30/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/28/2021 | 05/04/2021 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Move the center of drainage pattern to the property line on both sides for a common swale down the center between the properties. Note that the only time the swale should be on the inside of the property line is when the improved adjacent lot is flat or lower than the new construction. Not also the when next to a vacant lot, the swale should ALWAYS run to the property line even if it runs onto the vacant. When the vacant is built on then the swale will become "common" down the center. Any Questions Call Robert Cell 386-793-3980 | |||
| ZON | HOLD | 04/28/2021 | 05/04/2021 |
| Note: Held By: ESTELLE LENS - (386)986-3751 - Circular portion of the driveway cannot encroach in the 5 foot easement. Please revise and provide the setback from the bottom of the circular arc to the front property line. Please provide the width of the circular portion of the driveway. (Cannot exceed 18 feet) Four foundation plantings are required in the rear facing the golf course. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/07/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/10/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/10/2021 |
| SEWER CREDIT | (¤850.00) | 06/10/2021 |
| SEWER INSPECTION | ¤25.00 | 06/10/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/10/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/10/2021 |
| METER - DEPOSIT | ¤60.00 | 06/10/2021 |
| WATER- TURN ON | ¤25.00 | 06/10/2021 |
| CONNECTION FEES | ¤1,017.83 | 06/10/2021 |
| BUILDING DISCOUNT 100% | (¤125.00) | 06/10/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/10/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/10/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/10/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/10/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/10/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/10/2021 |
| PERMIT FEE | ¤125.00 | 06/10/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/10/2021 |
| SITE PLAN 20 | ¤20.00 | 06/10/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/10/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/10/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,311.43 |