Permit #2021050112
Permit Details
Status: COED
| Parcel Id: 03-12-31-0000-01010-0120 |
| Total Square Footage: 21000 sqft |
| Block: 01010 |
| Subdivision: - |
| Job Phone: 407-448-9300 |
| Location Address: 6372 STATE HWY 100 E |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 09/27/2021 |
| NOC: RECORDED |
| Applicant name: GARY WAYNE BRIDGES |
| Owner: BELLA CITA STORAGE LLC |
|
Address 880 BAY ROAD MOUNT DORA, FL 32757 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤975,000.00 |
| Job Description: BLDG G - SELF STORAGE FACILITY |
| Type: CN |
Contractor
G&M CONSTRUCTION SERVICES, INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 2316 ORLANDO, FL 32804 |
CGC062542 (Exp: 08/31/2022) | 407-448-9300 |
Sub Contractors
THOMAS ERIC SWORD
| Status | Location Address | State License Number | Phone |
| CANCEL |
10330 PLEASANT VIEW DR LEESBURG, FL 34788 |
CAC1814523 (Exp: 08/31/2022) | 352-434-7550 |
MATTHEW JAMES BLANCHARD
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 932 MT. DORA, FL 32757 |
EC13009373 (Exp: 08/31/2022) | 352-383-4868 |
JOHN CHARLES GRAY
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2707 ANNETTE STREET FLAGLER BEACH, FL 32136 |
CFC1425975 (Exp: 08/31/2026) | (386)793-3690 | (386)439-7585 |
Inspection History
| Type | Request Date | Result | Inspector |
| U - UTILITY COMMERCIAL FINAL | 06/30/2022 | FINAL APPROVED | JHARDING |
| BUILDING FINAL | 06/29/2022 | FINAL APPROVED | DCUSHING |
| Note: Inspector Notes from Inspection 3450 Inspector Notes from Inspection 3460 Inspector Notes from Inspection 3520 N/A - metal storage building, no store front Checked w/ intial Frame | |||
| FIRE FINAL | 06/29/2022 | APPROVED | RMARTIN |
| EXTERIOR WALL SHEATHING / SHEARWALL | 06/27/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: Inspector Notes from Inspection 3460 Inspector Notes from Inspection 3520 N/A - metal storage building, no store front Checked w/ intial Frame | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 06/27/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: Inspector Notes from Inspection 3520 N/A - metal storage building, no store front Checked w/ intial Frame | |||
| ELECTRIC 2ND ROUGH | 06/27/2022 | APPROVED | RMARTIN |
| HVAC ROUGH | 06/24/2022 | APPROVED - AS NOTED | CPISCITELLI |
| Note: No AC in this building | |||
| HVAC FINAL | 06/24/2022 | FINAL APPROVED | CPISCITELLI |
| MONOLITHIC SLAB | 06/24/2022 | APPROVED | DCUSHING |
| Note: Completed under foundation permit | |||
| FOOTER | 06/24/2022 | APPROVED | DCUSHING |
| Note: Completed under foundation permit | |||
| LINTEL | 06/24/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: N/A - metal building | |||
| FRAMING | 06/24/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: Approved w/ firewall frame | |||
| ABOVE CEILING | 06/24/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: N/A - no ceiling | |||
| INSULATION | 06/24/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: N/A metal storage building, non insulated | |||
| STOREFRONT | 06/24/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: N/A - metal storage building, no store front | |||
| FIREWALL FINAL | 06/23/2022 | FINAL APPROVED | DCUSHING |
| EXTERIOR ARCHITECTURAL FEATURES | 06/21/2022 | APPROVED | JHARDING |
| FIREWALL PENETRATIONS | 06/13/2022 | APPROVED | DCUSHING |
| ELECTRIC FINAL | 06/07/2022 | APPROVED | RMARTIN |
| ELECTRIC - EARLY POWER | 04/29/2022 | APPROVED | RMARTIN |
| FIREWALL DRYWALL NAILING | 04/27/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Partial for first layer screw off only of first two boards | |||
| FIREWALL DRYWALL NAILING | 04/14/2022 | PARTIALLY APPROVED | LMILLER |
| Note: Partial for first layer screw off only of first two boards | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 04/06/2022 | PARTIALLY APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION This is for DensGlass screw inspection only. Approved based on site inspection verifying screws are applied in vertical rows 12 inches apart max with max spacing of 6 inches within rows. (approved based on conversations between Building Official and Architect). 4-7-22 screw off inspection only | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 04/06/2022 | PARTIALLY APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION This is for endwall sheathing fasteners only... Continue at contractors risk only... need approved plans on site for inspections 4-7-22 roof sheathing screw-off only | |||
| FIREWALL FRAMING | 04/04/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: OK to drywall up to 3 layer section | |||
| LATH/BRICK/WATER BARRIER | 12/30/2021 | APPROVED | LMILLER |
| EXTERIOR WALL SHEATHING / SHEARWALL | 12/20/2021 | PARTIALLY APPROVED | LMILLER |
| Note: This is for DensGlass screw inspection only. Approved based on site inspection verifying screws are applied in vertical rows 12 inches apart max with max spacing of 6 inches within rows. (approved based on conversations between Building Official and Architect). | |||
| ELECTRIC 1ST ROUGH | 12/07/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: SITE LIGHTING CONDUIT FROM ROAD TO REAR OF PROPERTY 1 1/4 CONDUIT, GROUND ON REAR BUILDING | |||
| ELECTRIC - EARLY POWER | 12/07/2021 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACE / TIE DOWN | 11/19/2021 | PARTIALLY APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION This is for endwall sheathing fasteners only... Continue at contractors risk only... need approved plans on site for inspections | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 11/18/2021 | CANCELLED BY APPLICANT | LMILLER |
| FOUNDATION SURVEY - OFFICE USE ONLY | 10/08/2021 | APPROVED | DLEAP |
Review History
| Department | Status | Date In | Date Out |
| PLENG | COMPLETE | 10/07/2021 | 10/07/2021 |
| Note: Released By: DENNIS R. LEAP, P.E. - - DLEAP@PALMCOASTGOV.COM | |||
| PLENG | HOLD | 10/05/2021 | 10/07/2021 |
| Note: Held By: DENNIS R. LEAP, P.E. - - DLEAP@PALMCOASTGOV.COM 1. Foundation Survey to be signed and sealed. 2.Label plan as Foundation Survey. | |||
| ARCHR | COMPLETE | 09/22/2021 | 09/22/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/22/2021 | 09/22/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/14/2021 | 09/14/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ARCHR | HOLD | 09/12/2021 | 09/22/2021 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Elevation plans must be separted. | |||
| UD1 | COMPLETE | 09/12/2021 | 09/13/2021 |
| Note: Released By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/12/2021 | 09/13/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/12/2021 | 09/14/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Please Clarify - One document says no humidty control, but there are submitted mechanical drawings. If no humidity control then send statement to clarify this. If there is humidity control then my previous comments remain. See below 1. All codes need to reference 2020 7Th edition- FBC Mechanical, FBC Energy Conservation, and FBC Accessibility 2. Ventialtion calculation needs to reference 2020 7Th edition FBC Mechanical 3. Provide heatload calculation per C403.2.1 FBC Energy Conservation 2020 7th edition | |||
| BLD | COMPLETE | 09/12/2021 | 09/13/2021 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 09/12/2021 | 09/22/2021 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| ARCHR | HOLD | 05/04/2021 | 05/06/2021 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Provide color elevation renderings approved with the DO to note colors being used on the walls. | |||
| BLD | HOLD | 05/04/2021 | 05/17/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building 1. Provide complete copy of Geotechnical Investigation Report signed and sealed by a Florida licensed professional engineer. It appears a geotechnical investigation report was not included with the civil plans under the Commercial Site Development Permit. 2. Design professional in responsible charge to fill in steel building design engineer’s "approval’ certification box and sign and date on each plan sheet. As an alternative, these plan sheets can be provided at a later date as a deferred submittal in accordance with FBC-Building Section 107.3.4.1. If requesting these plan sheets to be a deferred submittal, approval blocks will still need to be signed and dated before they are submitted to the Building Department for review and approval and Architectural cover sheet will have to be noted in some manner indicating steel building plans will be provided at a later date as a deferred submittal per Section 107.3.4.1. Please note however, if steel building plans will be submitted later as a deferred submittal, an inspection hold will be placed preventing a framing inspection until deferred submittals have been submitted, reviewed and approved. Please allow ample time for review. 3. Remove all references to "fire barrier" on steel building erection plans. Walls are actually "fire walls" per FBC-Building Section 706.1 and shall be referred to as fire walls. 4. Steel building design engineer shall certify structural stability of fire walls per Section 706.2 indicating either by written notes on one or more plan sheets indicating firewalls are designed and constructed to allow collapse of the structure on either side without collapse of the fire wall. As an alternative engineer can provide design in accordance with NFPA 221. 5. Steel building plans shall reference the 2020 Florida Building Code Building (2017 edition is referenced). Engineer to remove references to the IBC. 6. Reorganize UL fire wall details on Sheet A801 so that the file is organized to read from top to bottom and left to right from file beginning to file end. As currently printed, file details appear out of order. Please also ensure complete file is provided. Please be advised, the UL (U419) design provided is for a proprietary fire wall; therefore no material substitutions are allowed beyond those called out in the file. IT IS STRONGLY recommended a note or notes be added advising the contractor of the limitations to those proprietary materials listed as deviations from approved materials will not be allowed under any circumstances. | |||
| DSD | COMPLETE | 05/04/2021 | 05/06/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/04/2021 | 05/10/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Reference the 2020 Energy code | |||
| FI1 | HOLD | 05/04/2021 | 05/18/2021 |
| Note: Held By: WILLIAM MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM Provide Fire Extinguishers as required per FFPC 1, section 13.6 and table 13.6.1.2 Provide Fire Extinguishers located so that the maximum travel distances does not exceed 75 ft. FFPC 1, 13.6.3.2.1.2.2 | |||
| MECH | HOLD | 05/04/2021 | 05/11/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM 1. All codes need to reference 2020 7Th edition- FBC Mechanical, FBC Energy Conservation, and FBC Accessibility 2. Ventialtion calculation needs to reference 2020 7Th edition FBC Mechanical 3. Provide heatload calculation per C403.2.1 FBC Energy Conservation 2020 7th edition | |||
| PLUM | CANCEL | 05/04/2021 | 05/18/2021 |
| UD1 | HOLD | 05/04/2021 | 05/06/2021 |
| Note: Held By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM Civil plans do not show potable water service to this building. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE - COMMERCIAL | ¤60.00 | 09/27/2021 |
| INSPECTION- ELECTRICAL | ¤645.00 | 09/27/2021 |
| INSPECTION - MECHANICAL | ¤645.00 | 09/27/2021 |
| INSPECTION - PLUMBING | ¤645.00 | 09/27/2021 |
| PLAN REVIEW - COMMERCIAL | ¤1,121.25 | 09/27/2021 |
| BUILDING DISCOUNT 100% | (¤3,116.25) | 09/27/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤371.70) | 09/27/2021 |
| IMPACT FEE FIRE | ¤12,390.00 | 09/27/2021 |
| IMPACT FEE TRANSPORTATION | ¤9,471.00 | 09/27/2021 |
| SITE PLAN 20 | ¤20.00 | 09/27/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/27/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/27/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤284.13) | 09/27/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,229.17 |