Permit #2021050115

Permit Details

Status: COED

Parcel Id: 03-12-31-0000-01010-0120
Total Square Footage: 21000 sqft
Block: 01010
Subdivision: -
Job Phone: 407-448-9300
Location Address: 6372 STATE HWY 100 E
Type: BC - BUILDING COMMERCIAL
Issue Date: 09/27/2021
NOC: RECORDED
Applicant name: GARY WAYNE BRIDGES
Owner: BELLA CITA STORAGE LLC

Address

880 BAY ROAD

MOUNT DORA, FL 32757

Lot: 0120
Contracted Stated Job Value: ¤795,000.00
Job Description: BLDG F - SELF STORAGE FACILITY
Type: CN

Contractor

G&M CONSTRUCTION SERVICES, INC.
Status Location Address State License Number Phone
INACTIVE

PO BOX 2316

ORLANDO, FL 32804

CGC062542 (Exp: 08/31/2022) 407-448-9300

Sub Contractors

THOMAS ERIC SWORD
Status Location Address State License Number Phone
CANCEL

10330 PLEASANT VIEW DR

LEESBURG, FL 34788

CAC1814523 (Exp: 08/31/2022) 352-434-7550
MATTHEW JAMES BLANCHARD
Status Location Address State License Number Phone
INACTIVE

PO BOX 932

MT. DORA, FL 32757

EC13009373 (Exp: 08/31/2022) 352-383-4868
JOHN CHARLES GRAY
Status Location Address State License Number Phone Fax
ACTIVE

2707 ANNETTE STREET

FLAGLER BEACH, FL 32136

CFC1425975 (Exp: 08/31/2026) (386)793-3690 (386)439-7585

Inspection History

Type Request Date Result Inspector
ROOF SHEATHING / BRACE / TIE DOWN 06/27/2022 APPROVED - AS NOTED DCUSHING
Note: Inspector Notes from Inspection 3520 N/A - Metal storage building, no store front Checked w/ intial Frame
BUILDING FINAL 06/27/2022 FINAL APPROVED DCUSHING
Note: Inspector Notes from Inspection 3520 N/A - Metal storage building, no store front
FIRE FINAL 06/27/2022 APPROVED RMARTIN
U - UTILITY COMMERCIAL FINAL 06/27/2022 APPROVED JHARDING
ABOVE CEILING 06/24/2022 APPROVED - AS NOTED DCUSHING
Note: N/A - Metal storage building, no ceiling
INSULATION 06/24/2022 APPROVED - AS NOTED DCUSHING
Note: N/A - Metal storage building, non insulated
STOREFRONT 06/24/2022 APPROVED - AS NOTED DCUSHING
Note: N/A - Metal storage building, no store front
ELECTRIC 2ND ROUGH 06/24/2022 APPROVED - AS NOTED RMARTIN
Note: DID THIS INSPECTION ON FINAL
MONOLITHIC SLAB 06/24/2022 APPROVED - AS NOTED DCUSHING
FOOTER 06/24/2022 APPROVED - AS NOTED DCUSHING
Note: Completed under foundation permit
LINTEL 06/24/2022 APPROVED - AS NOTED DCUSHING
Note: N/A - metal storage building
HVAC ROUGH 06/23/2022 APPROVED - AS NOTED RMARTIN
Note: this inspection is not needed
HVAC FINAL 06/23/2022 APPROVED - AS NOTED RMARTIN
Note: this inspection is not needed
EXTERIOR ARCHITECTURAL FEATURES 06/21/2022 APPROVED JHARDING
ELECTRIC FINAL 06/07/2022 APPROVED RMARTIN
ELECTRIC - EARLY POWER 04/29/2022 APPROVED RMARTIN
FIREWALL DRYWALL NAILING 04/27/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Partial for first layer screw off only of first two layers
FIREWALL DRYWALL NAILING 04/14/2022 PARTIALLY APPROVED LMILLER
Note: Partial for first layer screw off only of first two layers
EXTERIOR WALL SHEATHING / SHEARWALL 04/14/2022 CANCELLED BY APPLICANT LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION This is for DensGlass screw inspection only. Approved based on site inspection verifying screws are applied in vertical rows 12 inches apart max with max spacing of 6 inches within rows. (approved based on conversations between Building Official and Architect). 4-7-22 screw off inspection only
ROOF SHEATHING / BRACE / TIE DOWN 04/06/2022 PARTIALLY APPROVED LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION This is for endwall sheathing fasteners only... Continue at contractors risk only... need approved plans on site for inspections 4-7-22 roof sheathing screw-off only
EXTERIOR WALL SHEATHING / SHEARWALL 04/06/2022 PARTIALLY APPROVED LMILLER
Note: THIS IS A REINSPECTION This is for DensGlass screw inspection only. Approved based on site inspection verifying screws are applied in vertical rows 12 inches apart max with max spacing of 6 inches within rows. (approved based on conversations between Building Official and Architect). 4-7-22 screw off inspection only
FRAMING 04/04/2022 APPROVED - AS NOTED DCUSHING
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Firewall framing not as proposed on approved documents (see highlighted). several cross members on fire walls not installed. unit 48 missing screw in top of framing. 1-25-21... firewall and building separation still not built per plans OK to drywall up to 3 layer section
ELECTRIC 1ST ROUGH 02/09/2022 APPROVED - AS NOTED RMARTIN
Note: NEED TO HAVE APPROVED PLANS ON SITE FOR INSPECTION, ONLY 2 GUYS ON SITE WORKING ON ROAD BASE
FRAMING 01/25/2022 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION Firewall framing not as proposed on approved documents (see highlighted). several cross members on fire walls not installed. unit 48 missing screw in top of framing. 1-25-21... firewall and building separation still not built per plans
LATH/BRICK/WATER BARRIER 12/30/2021 APPROVED LMILLER
EXTERIOR WALL SHEATHING / SHEARWALL 12/20/2021 PARTIALLY APPROVED LMILLER
Note: This is for DensGlass screw inspection only. Approved based on site inspection verifying screws are applied in vertical rows 12 inches apart max with max spacing of 6 inches within rows. (approved based on conversations between Building Official and Architect).
ROOF SHEATHING / BRACE / TIE DOWN 11/19/2021 PARTIALLY APPROVED LMILLER
Note: THIS IS A REINSPECTION This is for endwall sheathing fasteners only... Continue at contractors risk only... need approved plans on site for inspections
ROOF SHEATHING / BRACE / TIE DOWN 11/18/2021 CANCELLED BY APPLICANT LMILLER
FRAMING 10/27/2021 Disapproved - NO FEE LMILLER
Note: Firewall framing not as proposed on approved documents (see highlighted). several cross members on fire walls not installed. unit 48 missing screw in top of framing.
FOUNDATION SURVEY - OFFICE USE ONLY 10/08/2021 APPROVED DLEAP

Review History

Department Status Date In Date Out
PLENG COMPLETE 10/07/2021 10/07/2021
Note: Released By: DENNIS R. LEAP, P.E. - - DLEAP@PALMCOASTGOV.COM
PLENG HOLD 10/05/2021 10/07/2021
Note: Held By: DENNIS R. LEAP, P.E. - - DLEAP@PALMCOASTGOV.COM 1. Foundation Survey to be signed and sealed. 2.Label plan as Foundation Survey.
ARCHR COMPLETE 09/22/2021 09/27/2021
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
BLD COMPLETE 09/22/2021 09/23/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
ARCHR HOLD 09/12/2021 09/22/2021
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Elevation plan must separated.
UD1 COMPLETE 09/12/2021 09/13/2021
Note: Released By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM
ELEC COMPLETE 09/12/2021 09/13/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 09/12/2021 09/13/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 09/12/2021 09/13/2021
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
FI1 COMPLETE 09/12/2021 09/22/2021
Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
BADMIN HOLD 06/24/2021 06/24/2021
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO NOC.PDF
BADMIN COMPLETE 06/24/2021 06/24/2021
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
BADMIN HOLD 06/23/2021 06/23/2021
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO NOC.PDF
BADMIN COMPLETE 06/23/2021 06/23/2021
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
ARCHR HOLD 05/04/2021 05/06/2021
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Provide color elevation renderings approved with the DO to note colors being used on the walls.
BLD HOLD 05/04/2021 05/17/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building 1. Provide complete copy of Geotechnical Investigation Report signed and sealed by a Florida licensed professional engineer. It appears a geotechnical investigation report was not included with the civil plans under the Commercial Site Development Permit. 2. Design professional in responsible charge to fill in steel building design engineer’s “approval’ certification box and sign and date on each plan sheet. As an alternative, these plan sheets can be provided at a later date as a deferred submittal in accordance with FBC-Building Section 107.3.4.1. If requesting these plan sheets to be a deferred submittal, approval blocks will still need to be signed and dated before they are submitted to the Building Department for review and approval and Architectural cover sheet will have to be noted in some manner indicating steel building plans will be provided at a later date as a deferred submittal per Section 107.3.4.1. Please note however, if steel building plans will be submitted later as a deferred submittal, an inspection hold will be placed preventing a framing inspection until deferred submittals have been submitted, reviewed and approved. Please allow ample time for review. 3. Remove all references to “fire barrier” on steel building erection plans. Walls are actually “fire walls” per FBC-Building Section 706.1 and shall be referred to as fire walls. 4. Steel building design engineer shall certify structural stability of fire walls per Section 706.2 indicating either by written notes on one or more plan sheets indicating firewalls are designed and constructed to allow collapse of the structure on either side without collapse of the fire wall. As an alternative engineer can provide design in accordance with NFPA 221. 5. Steel building plans shall reference the 2020 Florida Building Code Building (2017 edition is referenced). Engineer to remove references to the IBC. 6. Reorganize UL fire wall details on Sheet A801 so that the file is organized to read from top to bottom and left to right from file beginning to file end. As currently printed, file details appear out of order. Please also ensure complete file is provided. Please be advised, the UL (U419) design provided is for a proprietary fire wall; therefore no material substitutions are allowed beyond those called out in the file. IT IS STRONGLY recommended a note or notes be added advising the contractor of the limitations to those proprietary materials listed as deviations from approved materials will not be allowed under any circumstances.
DSD COMPLETE 05/04/2021 05/06/2021
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
ELEC HOLD 05/04/2021 05/10/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Reference the 2020 Energy code
FI1 HOLD 05/04/2021 05/18/2021
Note: Held By: WILLIAM MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM Provide Fire Extinguishers as required per FFPC 1, section 13.6 and table 13.6.1.2 Provide Fire Extinguishers located so that the maximum travel distances does not exceed 75 ft. FFPC 1, 13.6.3.2.1.2.2
MECH HOLD 05/04/2021 05/11/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM All codes need to reference 2020 7Th edition- FBC Mechanical, FBC Energy Conservation, and FBC Accessibility
PLUM CANCEL 05/04/2021 05/19/2021
Note: Plumbing review cancelled. Plumbing inspections removed. According to site plan there is no plumbing including hose-bibbs in this building
UD1 HOLD 05/04/2021 05/06/2021
Note: Held By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM Civil plans do not show potable water service to this building.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION - COMMERCIAL ¤60.00 06/29/2022
BUILDING DISCOUNT 100% (¤2,585.25) 09/27/2021
3% FIRE IMPACT FEE CREDIT (¤371.70) 09/27/2021
IMPACT FEE FIRE ¤12,390.00 09/27/2021
IMPACT FEE TRANSPORTATION ¤9,471.00 09/27/2021
SITE PLAN 20 ¤20.00 09/27/2021
SURCHARGE FS 533.721 ¤2.00 09/27/2021
SURCHARGE - FS 468.631 ¤2.00 09/27/2021
3% TRANS IMPACT FEE CREDIT (¤284.13) 09/27/2021
ADMINISTRATIVE - COMMERCIAL ¤60.00 09/27/2021
INSPECTION- ELECTRICAL ¤537.00 09/27/2021
INSPECTION - MECHANICAL ¤537.00 09/27/2021
INSPECTION - PLUMBING ¤537.00 09/27/2021
PLAN REVIEW - COMMERCIAL ¤914.25 09/27/2021
Fees Total Due: ¤0.00 Total Paid: ¤21,289.17