Permit #2021050150
Permit Details
Status: COED
| Parcel Id: 03-12-31-0000-01010-0120 |
| Total Square Footage: 21000 sqft |
| Block: 01010 |
| Subdivision: - |
| Job Phone: 407-448-9300 |
| Location Address: 6372 STATE HWY 100 E |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 12/17/2021 |
| NOC: RECORDED |
| Applicant name: GARY WAYNE BRIDGES |
| Owner: BELLA CITA STORAGE LLC |
|
Address 880 BAY ROAD MOUNT DORA, FL 32757 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤875,000.00 |
| Job Description: Building H - Self Storage Facility |
| Type: CN |
Contractor
G&M CONSTRUCTION SERVICES, INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 2316 ORLANDO, FL 32804 |
CGC062542 (Exp: 08/31/2022) | 407-448-9300 |
Sub Contractors
THOMAS ERIC SWORD
| Status | Location Address | State License Number | Phone |
| CANCEL |
10330 PLEASANT VIEW DR LEESBURG, FL 34788 |
CAC1814523 (Exp: 08/31/2022) | 352-434-7550 |
MATTHEW JAMES BLANCHARD
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 932 MT. DORA, FL 32757 |
EC13009373 (Exp: 08/31/2022) | 352-383-4868 |
JOHN CHARLES GRAY
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2707 ANNETTE STREET FLAGLER BEACH, FL 32136 |
CFC1425975 (Exp: 08/31/2026) | (386)793-3690 | (386)439-7585 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF SHEATHING / BRACE / TIE DOWN | 06/27/2022 | APPROVED | DCUSHING |
| Note: Inspector Notes from Inspection 3520 N/A - Metal storage building, no store front | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 06/27/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: Inspector Notes from Inspection 3520 N/A - Metal storage building, no store front Checked w/ initial frame | |||
| BUILDING FINAL | 06/27/2022 | FINAL APPROVED | DCUSHING |
| Note: Inspector Notes from Inspection 3520 N/A - Metal storage building, no store front | |||
| FIRE FINAL | 06/27/2022 | APPROVED | RMARTIN |
| U - UTILITY COMMERCIAL FINAL | 06/27/2022 | APPROVED | JHARDING |
| ABOVE CEILING | 06/24/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: N/A - Metal storage building, no ceiling | |||
| INSULATION | 06/24/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: N/A - Metal storage building, non insulated | |||
| STOREFRONT | 06/24/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: N/A - Metal storage building, no store front | |||
| PLUMBING 1ST ROUGH | 06/24/2022 | CANCELLED BY INSPECTOR | MGIBSON |
| PLUMBING 2ND ROUGH | 06/24/2022 | CANCELLED BY INSPECTOR | MGIBSON |
| PLUMBING FINAL | 06/24/2022 | CANCELLED BY INSPECTOR | MGIBSON |
| HVAC ROUGH | 06/24/2022 | APPROVED - AS NOTED | CPISCITELLI |
| Note: No Ac in this building | |||
| HVAC FINAL | 06/24/2022 | FINAL APPROVED | CPISCITELLI |
| ELECTRIC 1ST ROUGH | 06/24/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: DID THIS ON PREVIOUS INSPECTION | |||
| ELECTRIC 2ND ROUGH | 06/24/2022 | APPROVED | RMARTIN |
| MONOLITHIC SLAB | 06/24/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: Completed under foundation permit | |||
| FOOTER | 06/24/2022 | APPROVED - AS NOTED | DCUSHING |
| LINTEL | 06/24/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: N/A - Metal storage building | |||
| FRAMING | 06/24/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: checked with firewall frame | |||
| EXTERIOR ARCHITECTURAL FEATURES | 06/21/2022 | APPROVED | JHARDING |
| FIREWALL PENETRATIONS | 06/13/2022 | APPROVED | DCUSHING |
| ELECTRIC FINAL | 06/07/2022 | APPROVED | RMARTIN |
| FIREWALL FRAMING | 05/17/2022 | APPROVED | PBUCKLEY |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION partial Firewall Framing for botton track nailing only, OK to place first drywall layer up within 2 feet of top track only at contractor risk 3-14-22 Wrong inspection set (needed Firewall Nailing) | |||
| FIREWALL DRYWALL NAILING | 05/17/2022 | APPROVED | PBUCKLEY |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION this is a partial for first layer only, of drywall up to within 2 feet of roof both sides of fire wall 3-14-22 Minimum horizontal offset not met per UL419 detail 3-22-22 Partial only, Second Layer approved per Building Official PB 5/17/22 3rd and final layer all firewalls ok. PDB | |||
| ELECTRIC - EARLY POWER | 04/29/2022 | APPROVED | RMARTIN |
| EXTERIOR WALL SHEATHING / SHEARWALL | 04/01/2022 | PARTIALLY APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION end wall panels only call back in for DesGlass screw off inspeection 01-05-21... for DesGlass screw off inspeection at endwalls only. 3-22-22... wrong inspection called in (should have called in Firewall drywall nailing inspection) 4-1-22 Partial for screw-off only | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 04/01/2022 | PARTIALLY APPROVED | LMILLER |
| Note: Partial for sheathing only, (need to complete and pass firewall framing prior) | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 03/22/2022 | Disapproved - NO FEE | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION end wall panels only call back in for DesGlass screw off inspeection 01-05-21... for DesGlass screw off inspeection at endwalls only. 3-22-22... wrong inspection called in (should have called in Firewall drywall nailing inspection) | |||
| FIREWALL DRYWALL NAILING | 03/22/2022 | PARTIALLY APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION this is a partial for first layer only, of drywall up to within 2 feet of roof both sides of fire wall 3-14-22 Minimum horizontal offset not met per UL419 detail 3-22-22 Partial only, Second Layer approved per Building Official PB | |||
| FIREWALL DRYWALL NAILING | 03/14/2022 | Disapproved - NO FEE | LMILLER |
| Note: THIS IS A REINSPECTION this is a partial for first layer only, of drywall up to within 2 feet of roof both sides of fire wall 3-14-22 Minimum horizontal offset not met per UL419 detail | |||
| FIREWALL FRAMING | 03/14/2022 | Disapproved - NO FEE | LMILLER |
| Note: THIS IS A REINSPECTION partial Firewall Framing for botton track nailing only, OK to place first drywall layer up within 2 feet of top track only at contractor risk 3-14-22 Wrong inspection set (needed Firewall Nailing) | |||
| FIREWALL DRYWALL NAILING | 03/01/2022 | PARTIALLY APPROVED | LMILLER |
| Note: this is a partial for first layer only, of drywall up to within 2 feet of roof both sides of fire wall | |||
| FIREWALL FRAMING | 02/16/2022 | PARTIALLY APPROVED | LMILLER |
| Note: partial Firewall Framing for botton track nailing only, OK to place first drywall layer up within 2 feet of top track only at contractor risk | |||
| LATH/BRICK/WATER BARRIER | 01/13/2022 | APPROVED | LMILLER |
| EXTERIOR WALL SHEATHING / SHEARWALL | 01/05/2022 | PARTIALLY APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION end wall panels only call back in for DesGlass screw off inspeection 01-05-21... for DesGlass screw off inspeection at endwalls only. | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 12/22/2021 | PARTIALLY APPROVED | LMILLER |
| Note: end wall panels only call back in for DesGlass screw off inspeection |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/17/2021 | 12/17/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ARCHR | COMPLETE | 09/27/2021 | 09/29/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 09/27/2021 | 09/27/2021 |
| Note: Released By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/27/2021 | 09/29/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/27/2021 | 09/27/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/27/2021 | 10/11/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building 1. (Repeat Comment) Provide complete copy of Geotechnical Investigation Report signed and sealed by a Florida licensed professional engineer. It appears a geotechnical investigation report was not included with the civil plans under the Commercial Site Development Permit. On approved Site Plans was submitted. 2. (Repeat Comment) Design professional in responsible charge to fill in steel building design engineer’s “approval’ certification box and sign and date on each plan sheet. As an alternative, these plan sheets can be provided at a later date as a deferred submittal in accordance with FBC-Building Section 107.3.4.1. If requesting these plan sheets to be a deferred submittal, approval blocks will still need to be signed and dated before they are submitted to the Building Department for review and approval and Architectural cover sheet will have to be noted in some manner indicating steel building plans will be provided at a later date as a deferred submittal per Section 107.3.4.1. Please note however, if steel building plans will be submitted later as a deferred submittal, an inspection hold will be placed preventing a framing inspection until deferred submittals have been submitted, reviewed and approved. Please allow ample time for review. | |||
| FI1 | COMPLETE | 09/27/2021 | 10/05/2021 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| ARCHR | HOLD | 05/04/2021 | 05/06/2021 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Provide color elevation renderings approved with the DO to note colors being used on the walls. | |||
| BLD | HOLD | 05/04/2021 | 05/17/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building 1. Provide complete copy of Geotechnical Investigation Report signed and sealed by a Florida licensed professional engineer. It appears a geotechnical investigation report was not included with the civil plans under the Commercial Site Development Permit. 2. Design professional in responsible charge to fill in steel building design engineer’s “approval’ certification box and sign and date on each plan sheet. As an alternative, these plan sheets can be provided at a later date as a deferred submittal in accordance with FBC-Building Section 107.3.4.1. If requesting these plan sheets to be a deferred submittal, approval blocks will still need to be signed and dated before they are submitted to the Building Department for review and approval and Architectural cover sheet will have to be noted in some manner indicating steel building plans will be provided at a later date as a deferred submittal per Section 107.3.4.1. Please note however, if steel building plans will be submitted later as a deferred submittal, an inspection hold will be placed preventing a framing inspection until deferred submittals have been submitted, reviewed and approved. Please allow ample time for review. 3. Remove all references to “fire barrier” on steel building erection plans. Walls are actually “fire walls” per FBC-Building Section 706.1 and shall be referred to as fire walls. 4. Steel building design engineer shall certify structural stability of fire walls per Section 706.2 indicating either by written notes on one or more plan sheets indicating firewalls are designed and constructed to allow collapse of the structure on either side without collapse of the fire wall. As an alternative engineer can provide design in accordance with NFPA 221. 5. Steel building plans shall reference the 2020 Florida Building Code Building (2017 edition is referenced). Engineer to remove references to the IBC. 6. Reorganize UL fire wall details on Sheet A801 so that the file is organized to read from top to bottom and left to right from file beginning to file end. As currently printed, file details appear out of order. Please also ensure complete file is provided. Please be advised, the UL (U419) design provided is for a proprietary fire wall; therefore no material substitutions are allowed beyond those called out in the file. IT IS STRONGLY recommended a note or notes be added advising the contractor of the limitations to those proprietary materials listed as deviations from approved materials will not be allowed under any circumstances. | |||
| DSD | COMPLETE | 05/04/2021 | 05/06/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/04/2021 | 05/10/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Reference the 2020 Energy code 2. Submit panel schedule for panel H | |||
| FI1 | HOLD | 05/04/2021 | 05/18/2021 |
| Note: Held By: WILLIAM MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM Provide Fire Extinguishers as required per FFPC 1, section 13.6 and table 13.6.1.2 Provide Fire Extinguishers located so that the maximum travel distances does not exceed 75 ft. FFPC 1, 13.6.3.2.1.2.2 | |||
| MECH | HOLD | 05/04/2021 | 05/11/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM All codes need to reference 2020 7Th edition- FBC Mechanical, FBC Energy Conservation, and FBC Accessibility | |||
| PLUM | COMPLETE | 05/04/2021 | 05/19/2021 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| UD1 | HOLD | 05/04/2021 | 05/06/2021 |
| Note: Held By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM Civil plans do not show potable water service to this building. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| IMPACT FEE FIRE | ¤12,390.00 | 07/06/2022 |
| IMPACT FEE TRANSPORTATION | ¤9,471.00 | 12/17/2021 |
| SITE PLAN 20 | ¤20.00 | 12/17/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 12/17/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 12/17/2021 |
| ADMINISTRATIVE - COMMERCIAL | ¤60.00 | 12/17/2021 |
| INSPECTION- ELECTRICAL | ¤585.00 | 12/17/2021 |
| INSPECTION - MECHANICAL | ¤585.00 | 12/17/2021 |
| INSPECTION - PLUMBING | ¤585.00 | 12/17/2021 |
| PLAN REVIEW - COMMERCIAL | ¤1,006.25 | 12/17/2021 |
| BUILDING DISCOUNT 100% | (¤1,651.25) | 12/17/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,055.00 |