I want to search for...
Permit #2021050179
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00120-0170 |
| CONDITIONED SPACE: 2430 sqft |
| GARAGE: 699 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| OPENED PORCH (WITH ROOF) : 504 sqft |
| Total Square Footage: 3729 sqft |
| Block: 00120 |
| Subdivision: - |
| Job Phone: 386-627-0430 |
| Location Address: 74 WHIPPOORWILL DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/28/2021 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: CHARLENE L AND EDWARD G SOYKE JR. |
|
Address 74 WHIPPOORWILL DR PALM COAST, FL 32164 |
| Lot: 0170 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/22/2022 | FINAL APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION 1. Outlets in summer kitchen need to be weather resistant 2. Broken outlet opposite side of summer kitchen is broken 3. Low voltage wiring coming coming from house near meter main need to be sealed 4. A/C condensation line needs to be 12'' from house 5. Hole in spray foam insulation in garage attic needs to be sealed | |||
| BLD - BUILDING FINAL | 04/21/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Outlets in summer kitchen need to be weather resistant 2. Broken outlet opposite side of summer kitchen is broken 3. Low voltage wiring coming coming from house near meter main need to be sealed 4. A/C condensation line needs to be 12'' from house 5. Hole in spray foam insulation in garage attic needs to be sealed | |||
| U-CROSS CONNECTION | 03/31/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/31/2022 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 03/30/2022 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/30/2022 | APPROVED | KRUTH |
| ROW - STORMWATER FINAL | 03/30/2022 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 03/30/2022 | APPROVED | KRUTH |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/29/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: i need a positive fall, Positive fall considered to be 0.10 feet in 20 feet | |||
| ELECTRIC - EARLY POWER | 03/15/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 8:15 | |||
| GRAVITY SEWER TEST | 01/31/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 01/31/2022 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 01/27/2022 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| LATH/BRICK/ WATER BARRIER | 11/16/2021 | APPROVED | RMARTIN |
| PEP TANK INSTALLATION REQUEST | 11/15/2021 | APPROVED | CSTONE |
| INSULATION | 11/12/2021 | APPROVED | PBUCKLEY |
| ALL ROUGH | 11/10/2021 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 10/07/2021 | APPROVED | JWALKER |
| ELECTRIC-TUG | 10/07/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:11 am | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/28/2021 | FINAL APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION No engineering packet on site. Still working on roof sheeting. No building plans in job box. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/27/2021 | Disapproved - NO FEE | KSANDOE |
| Note: No engineering packet on site. Still working on roof sheeting. No building plans in job box. | |||
| TIE BEAM / LINTEL | 09/14/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Covered Lania area bathroom door right hand side dowel was improperly drilled and expoxied into place. Drill 6" hole and set #5 rebar in expoxy The right front lintel at the entry way has an appx 3 foot long crack at the bottom of the Lintel. Remove and replace or submitt an engineers worksheet to the building dept. For the use of the cracked lintel. | |||
| TIE BEAM / LINTEL | 09/13/2021 | Disapproved - NO FEE | JWALKER |
| Note: Covered Lania area bathroom door right hand side dowel was improperly drilled and expoxied into place. Drill 6" hole and set #5 rebar in expoxy The right front lintel at the entry way has an appx 3 foot long crack at the bottom of the Lintel. Remove and replace or submitt an engineers worksheet to the building dept. For the use of the cracked lintel. | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/10/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/10/2021 | APPROVED | JWALKER |
| Note: Please affix compaction sticker to permit. Thank you. Had trouble locating. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/02/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/21/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | CANCEL | 10/08/2021 | 10/08/2021 |
| Note: 10/08/2021 - Revision was canceled by applicant: HA | |||
| BLD | HOLD | 09/13/2021 | 09/13/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building PLAN REVIEW COMMENTS: 1. Provide a letter of certification from lintel manufacture on usage of cracked lintel ad provide location of lintel that is cracked. FBC 107 | |||
| ENGIN1 | COMPLETE | 09/09/2021 | 09/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/09/2021 | 09/09/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/11/2021 | 05/11/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/11/2021 | 05/14/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| SWALE | COMPLETE | 05/05/2021 | 07/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/04/2021 | 05/07/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/04/2021 | 05/06/2021 |
| Note: Released By: JPI | |||
| CUSVC | HOLD | 05/04/2021 | 05/05/2021 |
| Note: Held By: HALEIGH HAND - - Please correct utility application to reflect the correct parcel number. | |||
| ELEC | COMPLETE | 05/04/2021 | 05/05/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/04/2021 | 05/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/04/2021 | 05/10/2021 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 05/04/2021 | 05/05/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/22/2022 |
| CONNECTION FEES | ¤1,017.83 | 05/28/2021 |
| BUILDING DISCOUNT 100% | (¤1,670.00) | 05/28/2021 |
| ELECTRIC FEE | ¤270.00 | 05/28/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/28/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/28/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/28/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/28/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 05/28/2021 |
| MECHANICAL FEE | ¤270.00 | 05/28/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/28/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/28/2021 |
| PLAN CHECK FEE | ¤140.00 | 05/28/2021 |
| PLUMBING FEE | ¤270.00 | 05/28/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤700.00 | 05/28/2021 |
| SITE PLAN 20 | ¤20.00 | 05/28/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/28/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/28/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/28/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 05/28/2021 |
| SEWER CREDIT | (¤1,147.00) | 05/28/2021 |
| SEWER INSPECTION | ¤25.00 | 05/28/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 05/28/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 05/28/2021 |
| METER - DEPOSIT | ¤60.00 | 05/28/2021 |
| WATER- TURN ON | ¤25.00 | 05/28/2021 |
| ADMIN FEE | ¤20.00 | 05/28/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,024.43 |