I want to search for...
Permit #2021050293
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-01110-0180 |
| CONDITIONED SPACE: 1449 sqft |
| GARAGE: 418 sqft |
| OPENED PORCH (WITH ROOF) : 84 sqft |
| Total Square Footage: 1951 sqft |
| Block: 01110 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 321-249-3126 |
| Location Address: 28 BISCAYNE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/12/2021 |
| NOC: RECORDED |
| Applicant name: MOREY C DOYLE |
| Owner: WJHFL LLC |
|
Address 3091 GOVERNORS LAKE DRIVE SUITE 300 NORCROSS , GA 30071 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤101,430.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WADE JURNEY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
3091 GOVERNORS LAKE DRIVE NORCROSS, GA 30071 |
CGC1517458 (Exp: 08/31/2022) | 321-249-3126 |
Sub Contractors
EDWIN R INSALACO
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
3191 MAGUIRE BLVD ORLANDO, FL 32803 |
STE 200 ORLANDO, FL 32803 |
EC13001310 (Exp: 08/31/2024) | 321-441-7990 | 407-426-9741 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
IAN ALAN BRENNER
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
691 GARDEN COMMERCE PKWY WINTER GARDEN, FL 34787 |
STE 170 WINTER GARDEN, FL 34787 |
CCC1331270 (Exp: 08/31/2026) | 407-649-1333 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 08/24/2022 | FINAL APPROVED | EMADISON |
| Note: THIS IS A REINSPECTION ** 08/24/22 CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION THIS IS A REINSPECTION ** 08/18/22 LEFT SIDE OF HOUSE PEP TANK NEEDS TO HAVE A RISER INSTALLED AS IT IS BELOW GRADE APPROXIMATELY 10 INCHES. ** TRASH STILL NEEDS TO BE REMOVE FROM SWALE ON LEFT SIDE. ** CULVERT END ON LEFTSIDE NEEDS TO BE CLEANED OUT ** LARGE WOODEN JOB BOX IN SWALE ON LEFT SIDE NEEDS TO BE REMOVED ** SEE ATTACHED PHOTOS ** 08/16/22 BEFORE ROW FINAL IS APPROVED THESE ISSUES MUST BE CORRECTED ** LEFT SIDE SWALE NEEDS TO BE REPAIRED FROM TIRE TRACK RUTS IN FRONT OF #28 BISCAYNE ** LEFT SIDE SWALE WHERE DUMPSTER SAT NEEDS TO BE REPAIRED TO MATCH EXITING GRADE AND SODDED ** REMOVE ALL TRASH AND OR CONSTRUCTION DEBRIS FROM WHERE DUMPSTER SAT ** 08/16/22 CAN NOT BE SCHEDULED UNTIL AFTER THE ROW FINAL SURVEY AND FIELD SURVEY HAVE BEEN APPROVED | |||
| ROW - STORMWATER FINAL | 08/18/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: THIS IS A REINSPECTION ** 08/18/22 LEFT SIDE OF HOUSE PEP TANK NEEDS TO HAVE A RISER INSTALLED AS IT IS BELOW GRADE APPROXIMATELY 10 INCHES. ** TRASH STILL NEEDS TO BE REMOVE FROM SWALE ON LEFT SIDE. ** CULVERT END ON LEFTSIDE NEEDS TO BE CLEANED OUT ** LARGE WOODEN JOB BOX IN SWALE ON LEFT SIDE NEEDS TO BE REMOVED ** SEE ATTACHED PHOTOS ** 08/16/22 BEFORE ROW FINAL IS APPROVED THESE ISSUES MUST BE CORRECTED ** LEFT SIDE SWALE NEEDS TO BE REPAIRED FROM TIRE TRACK RUTS IN FRONT OF #28 BISCAYNE ** LEFT SIDE SWALE WHERE DUMPSTER SAT NEEDS TO BE REPAIRED TO MATCH EXITING GRADE AND SODDED ** REMOVE ALL TRASH AND OR CONSTRUCTION DEBRIS FROM WHERE DUMPSTER SAT ** 08/16/22 CAN NOT BE SCHEDULED UNTIL AFTER THE ROW FINAL SURVEY AND FIELD SURVEY HAVE BEEN APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 08/18/2022 | APPROVED | EMADISON |
| Note: THIS IS A REINSPECTION ** 08/16/22 CAN NOT BE SCHEDULED UNTIL AFTER THE ROW FINAL SURVEY AND FIELD SURVEY HAVE BEEN APPROVED | |||
| BLD - BUILDING FINAL | 08/18/2022 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 08/18/2022 | FINAL APPROVED | DHANEY |
| Note: THIS IS A REINSPECTION No electric to Pep tank | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/16/2022 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/16/2022 | APPROVED | EMADISON |
| Note: ** 08/16/22 BEFORE ROW FINAL IS APPROVED THESE ISSUES MUST BE CORRECTED ** LEFT SIDE SWALE NEEDS TO BE REPAIRED FROM TIRE TRACK RUTS IN FRONT OF #28 BISCAYNE ** LEFT SIDE SWALE WHERE DUMPSTER SAT NEEDS TO BE REPAIRED TO MATCH EXITING GRADE AND SODDED ** REMOVE ALL TRASH AND OR CONSTRUCTION DEBRIS FROM WHERE DUMPSTER SAT | |||
| ROW - STORMWATER FINAL | 08/16/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** 08/16/22 CAN NOT BE SCHEDULED UNTIL AFTER THE ROW FINAL SURVEY AND FIELD SURVEY HAVE BEEN APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 08/16/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** 08/16/22 CAN NOT BE SCHEDULED UNTIL AFTER THE ROW FINAL SURVEY AND FIELD SURVEY HAVE BEEN APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 08/16/2022 | Disapproved - NO FEE | DHANEY |
| Note: No electric to Pep tank | |||
| ELECTRIC - EARLY POWER | 06/22/2022 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 06/06/2022 | CANCELLED BY INSPECTOR | MGIBSON |
| Note: CONTACT PRIVATE PROVIDER | |||
| GRAVITY SEWER TEST | 06/06/2022 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 06/03/2022 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 06/03/2022 | APPROVED | DHANEY |
| Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION Double check Backflow Disconnected from water meter, Backflow needs reconnected . Double check still not connected - 5/6/22 Double check still laying at bottom of mtere pit - needs reconnected - 5/13 No cross connection protection . Repairs have been made-6/3 | |||
| ROW- PRE-APRON (PRE-POUR) | 05/18/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION * AREA NEXT TO PIPE IS TOO WET AND BUTTER SOFT IT IS NOT COMPACTED * TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION HALFWAY UP PIPE *NOT 4" THICK ACROSS GARAGE OPENING * FOOTERS ARE FILLED WITH WATER AND SEDIMENT | |||
| ROW- PRE-APRON (PRE-POUR) | 05/16/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: * AREA NEXT TO PIPE IS TOO WET AND BUTTER SOFT IT IS NOT COMPACTED * TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION HALFWAY UP PIPE *NOT 4" THICK ACROSS GARAGE OPENING * FOOTERS ARE FILLED WITH WATER AND SEDIMENT | |||
| PEP TANK INSTALLATION REQUEST | 05/16/2022 | APPROVED | CSTONE |
| U-CROSS CONNECTION | 05/13/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Double check Backflow Disconnected from water meter, Backflow needs reconnected . Double check still not connected - 5/6/22 | |||
| U-CROSS CONNECTION | 05/13/2022 | Disapproved -FEE REQUIRED | DHANEY |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION Double check Backflow Disconnected from water meter, Backflow needs reconnected . Double check still not connected - 5/6/22 Double check still laying at bottom of mtere pit - needs reconnected - 5/13 No cross connection protection . | |||
| ALL ROUGH | 05/13/2022 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 05/11/2022 | APPROVED | TBAKER |
| U-CROSS CONNECTION | 05/06/2022 | Disapproved - NO FEE | DHANEY |
| Note: THIS IS A REINSPECTION Double check Backflow Disconnected from water meter, Backflow needs reconnected . Double check still not connected - 5/6/22 | |||
| U-CROSS CONNECTION | 05/05/2022 | Disapproved - NO FEE | DHANEY |
| Note: Double check Backflow Disconnected from water meter, Backflow needs reconnected . | |||
| LATH/BRICK/ WATER BARRIER | 04/27/2022 | Approval - Private Provider | PPROVIDER |
| INSULATION | 04/15/2022 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 04/12/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 02/28/2022 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 02/14/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/14/2022 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 02/04/2022 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 01/10/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/03/2022 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 12/08/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/11/2022 | 05/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/11/2022 | 05/11/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/05/2021 | 05/06/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/05/2021 | 05/12/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/05/2021 | 05/06/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/05/2021 | 05/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/05/2021 | 05/07/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/05/2021 | 05/06/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/05/2021 | 05/11/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/05/2021 | 05/08/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| SWALE | COMPLETE | 05/05/2021 | 07/24/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 08/24/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/24/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/24/2022 |
| REINSPECTION FEE | ¤40.00 | 08/24/2022 |
| NEW RESIDENTIAL INSPECTIONS | ¤362.00 | 05/12/2021 |
| SITE PLAN 20 | ¤20.00 | 05/12/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/12/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/12/2021 |
| METER - DEPOSIT | ¤60.00 | 05/12/2021 |
| WATER- TURN ON | ¤25.00 | 05/12/2021 |
| ADMIN FEE | ¤20.00 | 05/12/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/12/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 05/12/2021 |
| SEWER CREDIT | (¤850.00) | 05/12/2021 |
| SEWER INSPECTION | ¤25.00 | 05/12/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 05/12/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 05/12/2021 |
| CONNECTION FEES | ¤1,017.83 | 05/12/2021 |
| BUILDING DISCOUNT 100% | (¤960.20) | 05/12/2021 |
| ELECTRIC FEE | ¤168.60 | 05/12/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/12/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/12/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/12/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/12/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 05/12/2021 |
| MECHANICAL FEE | ¤168.60 | 05/12/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/12/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/12/2021 |
| PLAN CHECK FEE | ¤72.40 | 05/12/2021 |
| PLUMBING FEE | ¤168.60 | 05/12/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,411.43 |