Permit #2021050294

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7035-01110-0160
CONDITIONED SPACE: 1650 sqft
GARAGE: 403 sqft
OPENED PORCH (WITH ROOF) : 81 sqft
Total Square Footage: 2134 sqft
Block: 01110
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 321-249-3126
Location Address: 32 BISCAYNE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/12/2021
NOC: RECORDED
Applicant name: MOREY C DOYLE
Owner: PILASY TRUST

Address

59 TIMBER RIDGE DRIVE

STATEN ISLAND, NY 10306

Lot: 0160
Contracted Stated Job Value: ¤115,500.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

WADE JURNEY HOMES
Status Location Address State License Number Phone
CANCEL

3091 GOVERNORS LAKE DRIVE

NORCROSS, GA 30071

CGC1517458 (Exp: 08/31/2022) 321-249-3126

Sub Contractors

EDWIN R INSALACO
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

3191 MAGUIRE BLVD

ORLANDO, FL 32803

STE 200

ORLANDO, FL 32803

EC13001310 (Exp: 08/31/2024) 321-441-7990 407-426-9741
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307
DANIEL P GREGOIRE
Status Location Address State License Number Phone
INACTIVE

64 W. CENTRAL AVENUE

LAKE WALES, FL 33853

CFC057378 (Exp: 08/31/2024) (863)696-3737
IAN ALAN BRENNER
Status Location Address Mailing Address State License Number Phone
ACTIVE

691 GARDEN COMMERCE PKWY

WINTER GARDEN, FL 34787

STE 170

WINTER GARDEN, FL 34787

CCC1331270 (Exp: 08/31/2026) 407-649-1333

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 08/24/2022 APPROVED EMADISON
Note: THIS IS A REINSPECTION ** 08/24/22 BUILDER CORRECTED ALL ISSUES NOTED ** BUILDER HAS SUBMITTED A WORK TICKET TO UTILITY TO RAISE THE WATER METER BOX THIS IS A REINSPECTION ** 08/18/22 BEFORE ROW FINAL IS APPROVED: ** RIGHT SIDE WATER METER BOX NEEDS TO BE RAISED SITS APPROXIMATELY 12 INCHES BELOW THE FINAL GRADE OF THE YARD WITHIN THE ROW DRAINAGE ** ALL TRASH AND CONSTRUCTION DEBRIS ALONG THE RIGHT SIDE NEEDS AND ACROSS REAR PROPERTY LINE NEEDS TO BE REMOVED FROM PROPERTY ** 08/16/22 BEFORE ROW FINAL IS APPROVED: ** RIGHT SIDE WATER METER BOX NEEDS TO BE RAISED SITS APPROXIMATELY 12 INCHES BELOW THE FINAL GRADE OF THE YARD WITHIN THE ROW DRAINAGE ** ALL TRASH AND CONSTRUCTION DEBRIS ALONG THE RIGHT SIDE NEEDS AND ACROSS REAR PROPERTY LINE NEEDS TO BE REMOVED FROM PROPERTY ** 08/16/22 CAN NOT BE SCHEDULED UNTIL AFTER THE ROW FINAL SURVEY AND FIELD SURVEY HAVE BEEN APPROVED
ROW - STORMWATER FINAL 08/18/2022 Disapproved -FEE REQUIRED EMADISON
Note: THIS IS A REINSPECTION ** 08/18/22 BEFORE ROW FINAL IS APPROVED: ** RIGHT SIDE WATER METER BOX NEEDS TO BE RAISED SITS APPROXIMATELY 12 INCHES BELOW THE FINAL GRADE OF THE YARD WITHIN THE ROW DRAINAGE ** ALL TRASH AND CONSTRUCTION DEBRIS ALONG THE RIGHT SIDE NEEDS AND ACROSS REAR PROPERTY LINE NEEDS TO BE REMOVED FROM PROPERTY ** 08/16/22 BEFORE ROW FINAL IS APPROVED: ** RIGHT SIDE WATER METER BOX NEEDS TO BE RAISED SITS APPROXIMATELY 12 INCHES BELOW THE FINAL GRADE OF THE YARD WITHIN THE ROW DRAINAGE ** ALL TRASH AND CONSTRUCTION DEBRIS ALONG THE RIGHT SIDE NEEDS AND ACROSS REAR PROPERTY LINE NEEDS TO BE REMOVED FROM PROPERTY ** 08/16/22 CAN NOT BE SCHEDULED UNTIL AFTER THE ROW FINAL SURVEY AND FIELD SURVEY HAVE BEEN APPROVED
ROW - FINAL APRON (AFTER POUR) 08/18/2022 APPROVED EMADISON
Note: THIS IS A REINSPECTION ** 08/16/22 CAN NOT BE SCHEDULED UNTIL AFTER THE ROW FINAL SURVEY AND FIELD SURVEY HAVE BEEN APPROVED
BLD - BUILDING FINAL 08/18/2022 Approval - Private Provider PPROVIDER
ROW - FINAL APRON (AFTER POUR) 08/16/2022 Disapproved - NO FEE EMADISON
Note: ** 08/16/22 CAN NOT BE SCHEDULED UNTIL AFTER THE ROW FINAL SURVEY AND FIELD SURVEY HAVE BEEN APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/16/2022 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 08/16/2022 APPROVED EMADISON
Note: ** 08/16/22 BEFORE ROW FINAL IS APPROVED: ** RIGHT SIDE WATER METER BOX NEEDS TO BE RAISED SITS APPROXIMATELY 12 INCHES BELOW THE FINAL GRADE OF THE YARD WITHIN THE ROW DRAINAGE ** ALL TRASH AND CONSTRUCTION DEBRIS ALONG THE RIGHT SIDE NEEDS AND ACROSS REAR PROPERTY LINE NEEDS TO BE REMOVED FROM PROPERTY
ROW - STORMWATER FINAL 08/16/2022 Disapproved - NO FEE EMADISON
Note: ** 08/16/22 CAN NOT BE SCHEDULED UNTIL AFTER THE ROW FINAL SURVEY AND FIELD SURVEY HAVE BEEN APPROVED
U -UTILITY RESIDENTIAL FINAL 08/16/2022 FINAL APPROVED DHANEY
ELECTRIC - EARLY POWER 07/25/2022 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 06/21/2022 CANCELLED BY INSPECTOR MGIBSON
Note: CONTACT PRIVATE PROVIDER
GRAVITY SEWER TEST 06/21/2022 Approval - Private Provider PPROVIDER
U - SEWER TIE IN 06/16/2022 APPROVED MGIBSON
U-CROSS CONNECTION 06/16/2022 APPROVED - AS NOTED DHANEY
Note: New inspection due to canceled inspection THIS IS A REINSPECTION Back flow Double Check disconnected from water meter , needs Reconnected . Yard/IRR. not installed yet no cross cn. . Back flow has been reconnected.
U-CROSS CONNECTION 06/08/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION Back flow Double Check disconnected from water meter , needs Reconnected .
U - SEWER TIE IN 06/08/2022 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 05/05/2022 APPROVED RGROSS
Note: READY TO POUR
PEP TANK INSTALLATION REQUEST 05/05/2022 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 4/21/2022 2:45:49 PM THIS IS A REINSPECTION ADDED ON 3/23/2022 4:24:15 PM Int. & Ext. (sheet rock not hung & stucco/siding not applied) email rhand@palmcoastgov.com with questions Dumpster in the way, also noted no electrical stub out on tank side
U-CROSS CONNECTION 04/21/2022 Disapproved - NO FEE DHANEY
Note: Back flow Double Check disconnected from water meter , needs Reconnected .
PEP TANK INSTALLATION REQUEST 04/21/2022 Disapproved -FEE REQUIRED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 3/23/2022 4:24:15 PM Int. & Ext. (sheet rock not hung & stucco/siding not applied) email rhand@palmcoastgov.com with questions Dumpster in the way, also noted no electrical stub out on tank side
LATH/BRICK/ WATER BARRIER 04/12/2022 Approval - Private Provider PPROVIDER
INSULATION 03/25/2022 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 03/23/2022 Disapproved - NO FEE CSTONE
Note: Int. & Ext. (sheet rock not hung & stucco/siding not applied) email rhand@palmcoastgov.com with questions
FOUND SURVEY APPROVED (OFFICE) 03/21/2022 APPROVED TBAKER
ALL ROUGH 03/18/2022 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 02/28/2022 Approval - Private Provider PPROVIDER
WALL SHEATHING 02/14/2022 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/14/2022 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 02/04/2022 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 01/17/2022 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 01/03/2022 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 12/08/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 08/18/2022 08/18/2022
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please do not send the report from the PP. They send it to us and this created duplicate work for us when we receive it twice.
BLD CANCEL 08/04/2022 08/09/2022
Note: must be done by the private provider you chose- Per Hallen
BADMIN INFORMATION 04/22/2022 04/22/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NOC NOT RECORDED/CERTIFIED
ENGIN1 COMPLETE 03/21/2022 03/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/21/2022 03/21/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 05/05/2021 05/06/2021
Note: Released By: JPI
CUSVC COMPLETE 05/05/2021 05/12/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 05/05/2021 05/06/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/05/2021 05/05/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/05/2021 05/07/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 05/05/2021 05/06/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/05/2021 05/11/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 05/05/2021 05/08/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
SWALE COMPLETE 05/05/2021 07/24/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EXTENSION ¤40.00 08/24/2022
SW ENG REINSPECTION 20 ¤20.00 08/24/2022
UTILITY PEP REINSPECTION ¤40.00 08/24/2022
SEWER CREDIT (¤850.00) 05/12/2021
SEWER INSPECTION ¤25.00 05/12/2021
SEWER CAPITAL FACILITY ¤4,664.55 05/12/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 05/12/2021
STORM WATER PERMIT FEES ¤80.00 05/12/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 05/12/2021
METER - DEPOSIT ¤60.00 05/12/2021
WATER- TURN ON ¤25.00 05/12/2021
ADMIN FEE ¤20.00 05/12/2021
CONNECTION FEES ¤1,017.83 05/12/2021
BUILDING DISCOUNT 100% (¤1,052.60) 05/12/2021
ELECTRIC FEE ¤181.80 05/12/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 05/12/2021
IMPACT FEE FIRE ¤367.00 05/12/2021
IMPACT FEE PARKS ¤1,199.12 05/12/2021
IMPACT FEE SCHOOL ¤3,600.00 05/12/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 05/12/2021
MECHANICAL FEE ¤181.80 05/12/2021
WATER -IRRIGATION INSPECTION ¤25.00 05/12/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 05/12/2021
PLAN CHECK FEE ¤81.20 05/12/2021
PLUMBING FEE ¤181.80 05/12/2021
NEW RESIDENTIAL INSPECTIONS ¤406.00 05/12/2021
SITE PLAN 20 ¤20.00 05/12/2021
SURCHARGE FS 533.721 ¤2.00 05/12/2021
SURCHARGE - FS 468.631 ¤2.00 05/12/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,381.43