Permit #2021050306
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00410-0070 |
| CONDITIONED SPACE: 750 sqft |
| GARAGE: 415 sqft |
| CONDITIONED SPACE: 1086 sqft |
| OPENED PORCH (WITH ROOF) : 85 sqft |
| Total Square Footage: 2336 sqft |
| Block: 00410 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: 321-249-3126 |
| Location Address: 67 WOOD CEDAR DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/12/2021 |
| NOC: RECORDED |
| Applicant name: MOREY C DOYLE |
| Owner: WJHFL LLC DBA WJH |
|
Address 3091 GOVENORS LAKE DR SUITE 300 NORCROSS, GA 30071 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤128,500.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WADE JURNEY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
3091 GOVERNORS LAKE DRIVE NORCROSS, GA 30071 |
CGC1517458 (Exp: 08/31/2022) | 321-249-3126 |
Sub Contractors
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
EDWIN R INSALACO
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
3191 MAGUIRE BLVD ORLANDO, FL 32803 |
STE 200 ORLANDO, FL 32803 |
EC13001310 (Exp: 08/31/2024) | 321-441-7990 | 407-426-9741 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING FINAL | 12/17/2021 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 12/17/2021 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 12/17/2021 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 12/17/2021 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 12/17/2021 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 12/16/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 12/16/2021 | APPROVED | GBERTOLA |
| Note: Culvert set at 7 1/2 ft on the ends by request from JW site due to the sharp curve. Request granted. AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/16/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/16/2021 | APPROVED | GBERTOLA |
| ELECTRIC - EARLY POWER | 11/22/2021 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 11/19/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION SCROLL ALL THE WAY DOWN TO READ ALL THE NOTES A LOT OF GARBAGE ON THE SWALE I DID CONTACT NATE HE NEED TO PICK UP THE GARBAGE ASAP PICTURE ATTACHED NEED TO REMOVED THE DIRT FROM THE ROAD INSPECTOR BE BACK ON 11/05/2021 11/08/2021=Temporary access culvert in the right side is 75 % buried blocking the swale and needs to be opened. removed the sand in front of the pipe need to removed the dirt on the swale . The grading was mostly complete but still needs more dirt removed from the swale. See photos NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE 11/17/21 DIRT BLOCKING THE SWALE FROM THE SEWAR TIE IN AND WILL NEED TO BE REMOVED FROME THE SWALE next inspection 11/18/21 dirt and concrete in the swale that need to be removed next inspection 11/23/21 | |||
| ROW - DRAINAGE | 11/18/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION SCROLL ALL THE WAY DOWN TO READ ALL THE NOTES A LOT OF GARBAGE ON THE SWALE I DID CONTACT NATE HE NEED TO PICK UP THE GARBAGE ASAP PICTURE ATTACHED NEED TO REMOVED THE DIRT FROM THE ROAD INSPECTOR BE BACK ON 11/05/2021 11/08/2021=Temporary access culvert in the right side is 75 % buried blocking the swale and needs to be opened. removed the sand in front of the pipe need to removed the dirt on the swale . The grading was mostly complete but still needs more dirt removed from the swale. See photos NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE 11/17/21 DIRT BLOCKING THE SWALE FROM THE SEWAR TIE IN AND WILL NEED TO BE REMOVED FROME THE SWALE next inspection 11/18/21 | |||
| ROW - DRAINAGE | 11/17/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: SCROLL ALL THE WAY DOWN TO READ ALL THE NOTES A LOT OF GARBAGE ON THE SWALE I DID CONTACT NATE HE NEED TO PICK UP THE GARBAGE ASAP PICTURE ATTACHED NEED TO REMOVED THE DIRT FROM THE ROAD INSPECTOR BE BACK ON 11/05/2021 11/08/2021=Temporary access culvert in the right side is 75 % buried blocking the swale and needs to be opened. removed the sand in front of the pipe need to removed the dirt on the swale . The grading was mostly complete but still needs more dirt removed from the swale. See photos NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE 11/17/21 DIRT BLOCKING THE SWALE FROM THE SEWAR TIE IN AND WILL NEED TO BE REMOVED FROME THE SWALE | |||
| ROW - DRAINAGE | 11/16/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION A LOT OF GARBAGE ON THE SWALE I DID CONTACT NATE HE NEED TO PICK UP THE GARBAGE ASAP PICTURE ATTACHED NEED TO REMOVED THE DIRT FROM THE ROAD INSPECTOR BE BACK ON 11/05/2021 11/08/2021=Temporary access culvert in the right side is 75 % buried blocking the swale and needs to be opened. removed the sand in front of the pipe need to removed the dirt on the swale . The grading was mostly complete but still needs more dirt removed from the swale. See photos NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE | |||
| ROW- PRE-APRON (PRE-POUR) | 11/16/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| ALL ROUGH | 11/16/2021 | APPROVED - AS NOTED | CTROHA |
| Note: I supervised the inspections peformed by Gabriel Bertola. I found these inspections to be done professionally and follow City standards | |||
| ROW - DRAINAGE | 11/15/2021 | Disapproved -FEE REQUIRED | CTROHA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION A LOT OF GARBAGE ON THE SWALE I DID CONTACT NATE HE NEED TO PICK UP THE GARBAGE ASAP PICTURE ATTACHED NEED TO REMOVED THE DIRT FROM THE ROAD INSPECTOR BE BACK ON 11/05/2021 11/08/2021=Temporary access culvert in the right side is 75 % buried blocking the swale and needs to be opened. removed the sand in front of the pipe need to removed the dirt on the swale . The grading was mostly complete but still needs more dirt removed from the swale. See photos | |||
| ROW - DRAINAGE | 11/08/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: THIS IS A REINSPECTION A LOT OF GARBAGE ON THE SWALE I DID CONTACT NATE HE NEED TO PICK UP THE GARBAGE ASAP PICTURE ATTACHED NEED TO REMOVED THE DIRT FROM THE ROAD INSPECTOR BE BACK ON 11/05/2021 11/08/2021=Temporary access culvert in the right side is 75 % buried blocking the swale and needs to be opened. removed the sand in front of the pipe need to removed the dirt on the swale . | |||
| GRAVITY SEWER TEST | 11/08/2021 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 11/05/2021 | APPROVED | TBAKER |
| U - SEWER TIE IN | 11/05/2021 | APPROVED | MGIBSON |
| ROW - DRAINAGE | 11/04/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: A LOT OF GARBAGE ON THE SWALE I DID CONTACT NATE HE NEED TO PICK UP THE GARBAGE ASAP PICTURE ATTACHED NEED TO REMOVED THE DIRT FROM THE ROAD INSPECTOR BE BACK ON 11/05/2021 | |||
| INSULATION | 10/07/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 10/06/2021 | APPROVED - AS NOTED | CSTONE |
| Note: already installed | |||
| U-CROSS CONNECTION | 10/06/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ALL ROUGH | 10/01/2021 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 09/09/2021 | Approval - Private Provider | PPROVIDER |
| Note: 09/09/2021 Lath Inspection passed. | |||
| ROOF VALLEY & METAL | 08/31/2021 | Approval - Private Provider | PPROVIDER |
| Note: 08/31/2021 Roof Underlayment / Valley and Metal Inspection passed. | |||
| WALL SHEATHING | 08/30/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/30/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 08/12/2021 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 07/29/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/26/2021 | Approval - Private Provider | PPROVIDER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/05/2021 | 11/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/05/2021 | 11/05/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/06/2021 | 07/24/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/05/2021 | 05/06/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/05/2021 | 05/12/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/05/2021 | 05/06/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/05/2021 | 05/06/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/05/2021 | 05/07/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/05/2021 | 05/06/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/05/2021 | 05/11/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/05/2021 | 05/08/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/08/2021 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/08/2021 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/08/2021 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/08/2021 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/08/2021 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/08/2021 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/08/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/12/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 05/12/2021 |
| SEWER CREDIT | (¤1,466.00) | 05/12/2021 |
| SEWER INSPECTION | ¤25.00 | 05/12/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 05/12/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 05/12/2021 |
| METER - DEPOSIT | ¤60.00 | 05/12/2021 |
| WATER- TURN ON | ¤25.00 | 05/12/2021 |
| ADMIN FEE | ¤20.00 | 05/12/2021 |
| CONNECTION FEES | ¤1,017.83 | 05/12/2021 |
| BUILDING DISCOUNT 100% | (¤1,140.80) | 05/12/2021 |
| ELECTRIC FEE | ¤194.40 | 05/12/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/12/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/12/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/12/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/12/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 05/12/2021 |
| MECHANICAL FEE | ¤194.40 | 05/12/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/12/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/12/2021 |
| PLAN CHECK FEE | ¤89.60 | 05/12/2021 |
| PLUMBING FEE | ¤194.40 | 05/12/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤448.00 | 05/12/2021 |
| SITE PLAN 20 | ¤20.00 | 05/12/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/12/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/12/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,805.43 |