Permit #2021050364
Permit Details
Status: COED
| Parcel Id: 07-11-31-7025-00320-0150 |
| CONDITIONED SPACE: 1024 sqft |
| CONDITIONED SPACE: 1250 sqft |
| GARAGE: 413 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| Total Square Footage: 2759 sqft |
| Block: 00320 |
| Subdivision: 2189 - SECTION 25-PINE GROVE |
| Job Phone: 321-249-3126 |
| Location Address: 18 PEPPER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/19/2021 |
| NOC: RECORDED |
| Applicant name: MOREY C DOYLE |
| Owner: WJHFL LLC |
|
Address 3091 GOVERNORS LAKE DR SUITE 300 NORCROSS, GA 30071 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤159,180.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WADE JURNEY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
3091 GOVERNORS LAKE DRIVE NORCROSS, GA 30071 |
CGC1517458 (Exp: 08/31/2022) | 321-249-3126 |
Sub Contractors
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
EDWIN R INSALACO
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
3191 MAGUIRE BLVD ORLANDO, FL 32803 |
STE 200 ORLANDO, FL 32803 |
EC13001310 (Exp: 08/31/2024) | 321-441-7990 | 407-426-9741 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
IAN ALAN BRENNER
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
691 GARDEN COMMERCE PKWY WINTER GARDEN, FL 34787 |
STE 170 WINTER GARDEN, FL 34787 |
CCC1331270 (Exp: 08/31/2026) | 407-649-1333 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING FINAL | 12/17/2021 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 12/17/2021 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 12/17/2021 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 12/17/2021 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/16/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD. | |||
| ROW - STORMWATER FINAL | 12/16/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/16/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/16/2021 | APPROVED | GBERTOLA |
| ELECTRIC - EARLY POWER | 12/03/2021 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 11/22/2021 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 11/17/2021 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 11/17/2021 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 11/16/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION APRON WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION CHECK THAT MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE. Land Development Code Technical Manual, Section 900.04 (A) REBARS MISSING,CHECK THAT AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. Land Development Code Technical M anual, Drawing 300.E Section A-A 11/12/2021=FORM BOARD BY THE EDGE OF THE ROAD ON THE LEFT SIDE NEED TO BE CLOSER TO THE EDGE OF THE ROAD PICTURE ATTACHED CULVERT ELEVATION IS GOOD CULVERT TOLERANCE IS GOOD 11/16/2021=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| ROW- PROJECT STATUS | 11/16/2021 | APPROVED - AS NOTED | CTROHA |
| Note: I supervised the inspection peformed by Gabriel Bertola. I found these inspections to be done professionally and follow City standards | |||
| ROW- PRE-APRON (PRE-POUR) | 11/12/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: THIS IS A REINSPECTION APRON WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION CHECK THAT MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE. Land Development Code Technical Manual, Section 900.04 (A) REBARS MISSING,CHECK THAT AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. Land Development Code Technical M anual, Drawing 300.E Section A-A 11/12/2021=FORM BOARD BY THE EDGE OF THE ROAD ON THE LEFT SIDE NEED TO BE CLOSER TO THE EDGE OF IS NO STAIGHT NEED TO FOLLOW THE ROAD AT THE EDGE THE ROAD PICTURE ATTACHED CULVERT ELEVATION IS GOOD | |||
| ROW- PRE-APRON (PRE-POUR) | 11/09/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: APRON WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION CHECK THAT MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE. Land Development Code Technical Manual, Section 900.04 (A) REBARS MISSING,CHECK THAT AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. Land Development Code Technical Manual, Drawing 300.E Section A-A CULVERT TOLERANCE IS GOOD | |||
| WATER METER INSTALLATION REQUEST | 11/08/2021 | APPROVED | CSTONE |
| U-CROSS CONNECTION | 11/08/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/05/2021 | APPROVED | TBAKER |
| INSULATION | 10/20/2021 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 10/18/2021 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 10/11/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 10/05/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/28/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 09/10/2021 | Approval - Private Provider | LMUSGROVE |
| MONOLITHIC SLAB | 08/23/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/12/2021 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/05/2021 | 11/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/05/2021 | 11/05/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/19/2021 | 05/19/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/13/2021 | 07/24/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/13/2021 | 05/13/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/13/2021 | 05/13/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/06/2021 | 05/07/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/06/2021 | 05/12/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/06/2021 | 05/07/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 05/06/2021 | 05/06/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey | |||
| LOCATE | COMPLETE | 05/06/2021 | 05/07/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/06/2021 | 05/07/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/06/2021 | 05/13/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. .An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks.(D) | |||
| ZON | HOLD | 05/06/2021 | 05/10/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Right side setback missing on site plan/survey | |||
| BADMIN | HOLD | 05/06/2021 | 05/06/2021 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM In the future, please be sure to name your documents according to the document submittal guidelines on the webpage for the portal. I changed the names for this one. Also, do not upload the general note sheet. and we do not require a plumbing riser diagram any longer. | |||
| BADMIN | COMPLETE | 05/06/2021 | 05/06/2021 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/08/2021 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/08/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/19/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 05/19/2021 |
| SEWER CREDIT | (¤2,465.75) | 05/19/2021 |
| SEWER INSPECTION | ¤25.00 | 05/19/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 05/19/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 05/19/2021 |
| METER - DEPOSIT | ¤60.00 | 05/19/2021 |
| WATER- TURN ON | ¤25.00 | 05/19/2021 |
| ADMIN FEE | ¤20.00 | 05/19/2021 |
| CONNECTION FEES | ¤1,017.83 | 05/19/2021 |
| BUILDING DISCOUNT 100% | (¤1,342.40) | 05/19/2021 |
| ELECTRIC FEE | ¤223.20 | 05/19/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/19/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/19/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/19/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/19/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 05/19/2021 |
| MECHANICAL FEE | ¤223.20 | 05/19/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/19/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/19/2021 |
| PLAN CHECK FEE | ¤108.80 | 05/19/2021 |
| PLUMBING FEE | ¤223.20 | 05/19/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤544.00 | 05/19/2021 |
| SITE PLAN 20 | ¤20.00 | 05/19/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/19/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/19/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,725.68 |