Permit #2021050669

Permit Details

Status: COED

Parcel Id: 07-11-31-7014-00070-0170
CONDITIONED SPACE: 1815 sqft
GARAGE: 396 sqft
OPENED PORCH (WITH ROOF) : 172 sqft
OPENED PORCH (WITH ROOF) : 63 sqft
Total Square Footage: 2446 sqft
Block: 00070
Subdivision: 2202 - SECTION 14-COUNTRY CLUB COVE
Job Phone: (386) 672-8285
Location Address: 3 CROSSWAY CT W
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/16/2021
NOC: RECORDED
Applicant name: JOSEPH TODD VANACORE
Owner: DASILVA MARIO & MARIA H&W

Address

1196 FARRELL TERR

RAHWAY, NJ 07065

Lot: 0170
Contracted Stated Job Value: ¤198,900.00
Job Description: SINGLE FAMILY RESIDENCE -2ND PROVIDER UNIVERSAL
Type: CN

Contractor

VANACORE CONSTRUCTION INC.
Status Location Address Mailing Address State License Number Phone
INACTIVE

1451 N US HIGHWAY 1

Ormond Beach, FL 32174

SUITE 13

Ormond Beach, FL 32174

CBC058991 (Exp: 08/31/2024) (386) 672-8285

Sub Contractors

VERNON JACK SMITH III
Status Location Address State License Number Phone Fax
ACTIVE

224 KIRKLAND ROAD

NEW SMYRNA BEACH, FL 32169

EC13004432 (Exp: 08/31/2026) 386-409-3616 386-409-3616
ALFRED N FYOCK JR
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

387 SAULS

ORMOND BEACH, FL 32174

ST

ORMOND BEACH, FL 32174

CCC1329075 (Exp: 08/31/2026) 386-566-6112 386-673-4299
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 06/28/2022 APPROVED - AS NOTED JHARDING
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION No backflow protection on IRR. system by zone valves [ PVB ] 6-22-22 still no backflow. 6-28-22 No cross connections.
U -UTILITY RESIDENTIAL FINAL 06/28/2022 FINAL APPROVED JHARDING
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION No backflow protection on IRR. system by zone valves [ PVB ] 6-22-22 still no backflow
PLUMBING FINAL 06/23/2022 Approval - Private Provider MRAMOS
HVAC FINAL 06/23/2022 Approval - Private Provider PPROVIDER
ELECTRIC FINAL 06/23/2022 Approval - Private Provider PPROVIDER
BLD - BUILDING FINAL 06/23/2022 Approval - Private Provider PPROVIDER
U-CROSS CONNECTION 06/22/2022 Disapproved - NO FEE JHARDING
Note: THIS IS A REINSPECTION No backflow protection on IRR. system by zone valves [ PVB ] 6-22-22 still no backflow
ROW - FINAL APRON (AFTER POUR) 06/22/2022 APPROVED - AS NOTED EMADISON
Note: ** corrections made everything looks godd at the time of the inspection ** CORRECTIONS HAVE BEEN MADE ** SEDIMENT REMOVED FROM THE CANAL EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION ** JUST REINSPECTED SITE SEDIMENT STILL NEEDS TO BE REMOVED FROM CANAL REQUESTING BUILDER TO MEET ME ON SITE SO I CAN SHOW AND EXPLAIN AS TO WHAT NEEDS TO BE DONE FOR WHEN HE SCHEDULES NEXT INSPECTION. ** SEDIMENT HAS NOT BEEN REMOVED FROM THE CANAL AS INSTRUCTED ON PREVIOUS INSPECTIONS SEDIMENT WAS MANIPULATED AND PUSHED FURTHER INTO CANAL. ** POP-UP DRAIN INSTALLED. EM ** NO CORRECDTIONS WERE MADE. * NOTE TO INSPECTOR: CORRECTIONS MUST BE MADE PRIOR TO ROW FINAL APPROVAL * CAN NOT HAVE A DRAIN PIPE FROM GUTTERS DISCHARGING STORMWATER DIRECTLY INTO THE CANAL NEED TO REMOVE IMMEDIATELY, IT IS NEGATIVELY IMPACTING THE CANAL. * NEED TO REMOVE SEDIMENT THAT HAS WASHED INTO CANAL IN THE CORNER SO THAT THE APPROPRIATE CLEARANCES ARE MET IN ACCORDANCE WITH THE TECHNICAL MANUAL SECTION 1100.10 CURRENTLY AT HIGH TIDE THERE IS ONLY A 38" FROM SEDIMENT TO TOP OF SEAWALL.
U -UTILITY RESIDENTIAL FINAL 06/22/2022 Disapproved - NO FEE JHARDING
Note: THIS IS A REINSPECTION No backflow protection on IRR. system by zone valves [ PVB ] 6-22-22 still no backflow
ROW - STORMWATER FINAL 06/21/2022 APPROVED - AS NOTED EMADISON
Note: ** CORRECTIONS HAVE BEEN MADE ** SEDIMENT REMOVED FROM THE CANAL EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION ** JUST REINSPECTED SITE SEDIMENT STILL NEEDS TO BE REMOVED FROM CANAL REQUESTING BUILDER TO MEET ME ON SITE SO I CAN SHOW AND EXPLAIN AS TO WHAT NEEDS TO BE DONE FOR WHEN HE SCHEDULES NEXT INSPECTION. ** SEDIMENT HAS NOT BEEN REMOVED FROM THE CANAL AS INSTRUCTED ON PREVIOUS INSPECTIONS SEDIMENT WAS MANIPULATED AND PUSHED FURTHER INTO CANAL. ** POP-UP DRAIN INSTALLED. EM ** NO CORRECDTIONS WERE MADE. * NOTE TO INSPECTOR: CORRECTIONS MUST BE MADE PRIOR TO ROW FINAL APPROVAL * CAN NOT HAVE A DRAIN PIPE FROM GUTTERS DISCHARGING STORMWATER DIRECTLY INTO THE CANAL NEED TO REMOVE IMMEDIATELY, IT IS NEGATIVELY IMPACTING THE CANAL. * NEED TO REMOVE SEDIMENT THAT HAS WASHED INTO CANAL IN THE CORNER SO THAT THE APPROPRIATE CLEARANCES ARE MET IN ACCORDANCE WITH THE TECHNICAL MANUAL SECTION 1100.10 CURRENTLY AT HIGH TIDE THERE IS ONLY A 38" FROM SEDIMENT TO TOP OF SEAWALL.
ROW - STORMWATER FINAL 06/13/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** JUST REINSPECTED SITE SEDIMENT STILL NEEDS TO BE REMOVED FROM CANAL REQUESTING BUILDER TO MEET ME ON SITE SO I CAN SHOW AND EXPLAIN AS TO WHAT NEEDS TO BE DONE FOR WHEN HE SCHEDULES NEXT INSPECTION. ** SEDIMENT HAS NOT BEEN REMOVED FROM THE CANAL AS INSTRUCTED ON PREVIOUS INSPECTIONS SEDIMENT WAS MANIPULATED AND PUSHED FURTHER INTO CANAL. ** POP-UP DRAIN INSTALLED. EM ** NO CORRECDTIONS WERE MADE. * NOTE TO INSPECTOR: CORRECTIONS MUST BE MADE PRIOR TO ROW FINAL APPROVAL * CAN NOT HAVE A DRAIN PIPE FROM GUTTERS DISCHARGING STORMWATER DIRECTLY INTO THE CANAL NEED TO REMOVE IMMEDIATELY, IT IS NEGATIVELY IMPACTING THE CANAL. * NEED TO REMOVE SEDIMENT THAT HAS WASHED INTO CANAL IN THE CORNER SO THAT THE APPROPRIATE CLEARANCES ARE MET IN ACCORDANCE WITH THE TECHNICAL MANUAL SECTION 1100.10 CURRENTLY AT HIGH TIDE THERE IS ONLY A 38" FROM SEDIMENT TO TOP OF SEAWALL.
ROW - STORMWATER FINAL 06/09/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** SEDIMENT HAS NOT BEEN REMOVED FROM THE CANAL AS INSTRUCTED ON PREVIOUS INSPECTIONS SEDIMENT WAS MANIPULATED AND PUSHED FURTHER INTO CANAL. ** POP-UP DRAIN INSTALLED. EM ** NO CORRECDTIONS WERE MADE. * NOTE TO INSPECTOR: CORRECTIONS MUST BE MADE PRIOR TO ROW FINAL APPROVAL * CAN NOT HAVE A DRAIN PIPE FROM GUTTERS DISCHARGING STORMWATER DIRECTLY INTO THE CANAL NEED TO REMOVE IMMEDIATELY, IT IS NEGATIVELY IMPACTING THE CANAL. * NEED TO REMOVE SEDIMENT THAT HAS WASHED INTO CANAL IN THE CORNER SO THAT THE APPROPRIATE CLEARANCES ARE MET IN ACCORDANCE WITH THE TECHNICAL MANUAL SECTION 1100.10 CURRENTLY AT HIGH TIDE THERE IS ONLY A 38" FROM SEDIMENT TO TOP OF SEAWALL.
ROW - STORMWATER FINAL 06/03/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** NO CORRECDTIONS WERE MADE. * REVIEW FIELD SURVEY * NOTE TO INSPECTOR: CORRECTIONS MUST BE MADE PRIOR TO ROW FINAL APPROVAL * CAN NOT HAVE A DRAIN PIPE FROM GUTTERS DISCHARGING STORMWATER DIRECTLY INTO THE CANAL NEED TO REMOVE IMMEDIATELY, IT IS NEGATIVELY IMPACTING THE CANAL. * NEED TO REMOVE SEDIMENT THAT HAS WASHED INTO CANAL IN THE CORNER SO THAT THE APPROPRIATE CLEARANCES ARE MET IN ACCORDANCE WITH THE TECHNICAL MANUAL SECTION 1100.10 CURRENTLY AT HIGH TIDE THERE IS ONLY A 38" FROM SEDIMENT TO TOP OF SEAWALL.
U -UTILITY RESIDENTIAL FINAL 06/03/2022 Disapproved - NO FEE DHANEY
Note: No backflow protection on IRR. system by zone valves [ PVB ]
ROW - FINAL APRON (AFTER POUR) 06/03/2022 Disapproved - NO FEE EMADISON
Note: ** REMOVE CONCRETE FROM CULVERT PIPE ENDS
U-CROSS CONNECTION 06/03/2022 Disapproved - NO FEE DHANEY
Note: No backflow protection on IRR. system by zone valves [ PVB ]
ROW FIELD SURVEY /GRADING CERTIFICATION 06/02/2022 APPROVED - AS NOTED EMADISON
Note: * NOTE TO INSPECTOR: CORRECTIONS MUST BE MADE PRIOR TO ROW FINAL APPROVAL * CAN NOT HAVE A DRAIN PIPE FROM GUTTERS DISCHARGING STORMWATER DIRECTLY INTO THE CANAL NEED TO REMOVE IMMEDIATELY, IT IS NEGATIVELY IMPACTING THE CANAL. * NEED TO REMOVE SEDIMENT THAT HAS WASHED INTO CANAL IN THE CORNER SO THAT THE APPROPRIATE CLEARANCES ARE MET IN ACCORDANCE WITH THE TECHNICAL MANUAL SECTION 1100.10 CURRENTLY AT HIGH TIDE THERE IS ONLY A 38" FROM SEDIMENT TO TOP OF SEAWALL.
FINAL SURVEY (OFFICE USE ONLY) 06/02/2022 APPROVED EMADISON
GRAVITY SEWER TEST 03/23/2022 Approval - Private Provider PPROVIDER
ELEV CERT-FOUNDATION APPROVAL 03/22/2022 APPROVED JMYERS
U - SEWER TIE IN 03/22/2022 APPROVED - AS NOTED RMARTIN
Note: GOOGLE DUO INSPECTION WAS DONE
ROW- PRE-APRON (PRE-POUR) 03/22/2022 APPROVED - AS NOTED KRUTH
Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
U - SEWER TIE IN 03/21/2022 Disapproved - NO FEE LMILLER
Note: this property has private provider inspections
ELECTRIC - EARLY POWER 03/14/2022 Approval - Private Provider PPROVIDER
INSULATION 12/20/2021 Approval - Private Provider PPROVIDER
ALL ROUGH 12/14/2021 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 12/06/2021 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 11/12/2021 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/27/2021 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 10/05/2021 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 09/20/2021 APPROVED TBAKER
MONOLITHIC SLAB 09/09/2021 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 09/01/2021 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 08/09/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
PLFM COMPLETE 06/02/2022 06/02/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
PLFM HOLD 06/01/2022 06/02/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff does not see a seal in Section D of the elevation certificate. If a raised seal was used it needs to be shaded so it is visible.
PLFM COMPLETE 03/22/2022 03/22/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate was already approved, there are no changes on the new foundation elevation certificate.
CUSVC COMPLETE 10/08/2021 10/08/2021
Note: Released By: HALEIGH HAND - -
PLFM COMPLETE 09/21/2021 09/21/2021
Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO.
ENGIN1 COMPLETE 09/20/2021 09/20/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM HOLD 09/20/2021 09/20/2021
Note: Held By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM In Section D a box must be checked for the latitude and longitude, and a signature is missing from the signature area.
ZON COMPLETE 09/20/2021 09/20/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLFM COMPLETE 06/14/2021 06/15/2021
Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been accepted. However, on the building elevation certificate please make sure all elevations have a measurement box checked in Section C. In Section D, please either shade over the raised seal so it can be seen or use a wet seal.
PLFM HOLD 06/04/2021 06/04/2021
Note: Held By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 5/11/21, the structure falls within the Special Flood Hazard Area. Please provide elevation certificates at construction, foundation, and final.
ZON COMPLETE 06/04/2021 06/04/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 05/18/2021 05/18/2021
Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM Bench mark identified on second sheet
CUSVC COMPLETE 05/11/2021 05/12/2021
Note: Released By: HALEIGH HAND - -
ENGIN1 COMPLETE 05/11/2021 05/11/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/11/2021 05/17/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
SW1 HOLD 05/11/2021 05/17/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM .An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks.(D)
ZON HOLD 05/11/2021 05/14/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Banding required on all windows facing the street side (left side)
SWALE COMPLETE 05/11/2021 07/28/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 06/28/2022
SW ENG REINSPECTION 20 ¤20.00 06/28/2022
SW ENG REINSPECTION 20 ¤20.00 06/28/2022
METER - DEPOSIT ¤60.00 02/01/2022
WATER-METER ¤441.07 02/01/2022
WATER- TURN ON ¤25.00 02/01/2022
WATER -IRRIGATION INSPECTION ¤25.00 02/01/2022
3% PARKS IMPACT FEE CREDIT (¤35.97) 06/16/2021
SITE PLAN 20 ¤20.00 06/16/2021
SURCHARGE FS 533.721 ¤2.00 06/16/2021
SURCHARGE - FS 468.631 ¤2.00 06/16/2021
METER - DEPOSIT ¤60.00 06/16/2021
WATER- TURN ON ¤25.00 06/16/2021
ADMIN FEE ¤20.00 06/16/2021
CONNECTION FEES ¤1,017.83 06/16/2021
BUILDING DISCOUNT 100% (¤20.00) 06/16/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 06/16/2021
IMPACT FEE FIRE ¤367.00 06/16/2021
IMPACT FEE PARKS ¤1,199.12 06/16/2021
IMPACT FEE SCHOOL ¤3,600.00 06/16/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 06/16/2021
WATER -IRRIGATION INSPECTION ¤25.00 06/16/2021
STORM WATER PERMIT FEES ¤80.00 06/16/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 06/16/2021
SEWER INSPECTION ¤25.00 06/16/2021
SEWER CAPITAL FACILITY ¤4,664.55 06/16/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 06/16/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,742.50