Permit #2021050669
Permit Details
Status: COED
| Parcel Id: 07-11-31-7014-00070-0170 |
| CONDITIONED SPACE: 1815 sqft |
| GARAGE: 396 sqft |
| OPENED PORCH (WITH ROOF) : 172 sqft |
| OPENED PORCH (WITH ROOF) : 63 sqft |
| Total Square Footage: 2446 sqft |
| Block: 00070 |
| Subdivision: 2202 - SECTION 14-COUNTRY CLUB COVE |
| Job Phone: (386) 672-8285 |
| Location Address: 3 CROSSWAY CT W |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/16/2021 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: DASILVA MARIO & MARIA H&W |
|
Address 1196 FARRELL TERR RAHWAY, NJ 07065 |
| Lot: 0170 |
| Contracted Stated Job Value: ¤198,900.00 |
| Job Description: SINGLE FAMILY RESIDENCE -2ND PROVIDER UNIVERSAL |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 06/28/2022 | APPROVED - AS NOTED | JHARDING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION No backflow protection on IRR. system by zone valves [ PVB ] 6-22-22 still no backflow. 6-28-22 No cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/28/2022 | FINAL APPROVED | JHARDING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION No backflow protection on IRR. system by zone valves [ PVB ] 6-22-22 still no backflow | |||
| PLUMBING FINAL | 06/23/2022 | Approval - Private Provider | MRAMOS |
| HVAC FINAL | 06/23/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 06/23/2022 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 06/23/2022 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 06/22/2022 | Disapproved - NO FEE | JHARDING |
| Note: THIS IS A REINSPECTION No backflow protection on IRR. system by zone valves [ PVB ] 6-22-22 still no backflow | |||
| ROW - FINAL APRON (AFTER POUR) | 06/22/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** corrections made everything looks godd at the time of the inspection ** CORRECTIONS HAVE BEEN MADE ** SEDIMENT REMOVED FROM THE CANAL EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION ** JUST REINSPECTED SITE SEDIMENT STILL NEEDS TO BE REMOVED FROM CANAL REQUESTING BUILDER TO MEET ME ON SITE SO I CAN SHOW AND EXPLAIN AS TO WHAT NEEDS TO BE DONE FOR WHEN HE SCHEDULES NEXT INSPECTION. ** SEDIMENT HAS NOT BEEN REMOVED FROM THE CANAL AS INSTRUCTED ON PREVIOUS INSPECTIONS SEDIMENT WAS MANIPULATED AND PUSHED FURTHER INTO CANAL. ** POP-UP DRAIN INSTALLED. EM ** NO CORRECDTIONS WERE MADE. * NOTE TO INSPECTOR: CORRECTIONS MUST BE MADE PRIOR TO ROW FINAL APPROVAL * CAN NOT HAVE A DRAIN PIPE FROM GUTTERS DISCHARGING STORMWATER DIRECTLY INTO THE CANAL NEED TO REMOVE IMMEDIATELY, IT IS NEGATIVELY IMPACTING THE CANAL. * NEED TO REMOVE SEDIMENT THAT HAS WASHED INTO CANAL IN THE CORNER SO THAT THE APPROPRIATE CLEARANCES ARE MET IN ACCORDANCE WITH THE TECHNICAL MANUAL SECTION 1100.10 CURRENTLY AT HIGH TIDE THERE IS ONLY A 38" FROM SEDIMENT TO TOP OF SEAWALL. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/22/2022 | Disapproved - NO FEE | JHARDING |
| Note: THIS IS A REINSPECTION No backflow protection on IRR. system by zone valves [ PVB ] 6-22-22 still no backflow | |||
| ROW - STORMWATER FINAL | 06/21/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** CORRECTIONS HAVE BEEN MADE ** SEDIMENT REMOVED FROM THE CANAL EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION ** JUST REINSPECTED SITE SEDIMENT STILL NEEDS TO BE REMOVED FROM CANAL REQUESTING BUILDER TO MEET ME ON SITE SO I CAN SHOW AND EXPLAIN AS TO WHAT NEEDS TO BE DONE FOR WHEN HE SCHEDULES NEXT INSPECTION. ** SEDIMENT HAS NOT BEEN REMOVED FROM THE CANAL AS INSTRUCTED ON PREVIOUS INSPECTIONS SEDIMENT WAS MANIPULATED AND PUSHED FURTHER INTO CANAL. ** POP-UP DRAIN INSTALLED. EM ** NO CORRECDTIONS WERE MADE. * NOTE TO INSPECTOR: CORRECTIONS MUST BE MADE PRIOR TO ROW FINAL APPROVAL * CAN NOT HAVE A DRAIN PIPE FROM GUTTERS DISCHARGING STORMWATER DIRECTLY INTO THE CANAL NEED TO REMOVE IMMEDIATELY, IT IS NEGATIVELY IMPACTING THE CANAL. * NEED TO REMOVE SEDIMENT THAT HAS WASHED INTO CANAL IN THE CORNER SO THAT THE APPROPRIATE CLEARANCES ARE MET IN ACCORDANCE WITH THE TECHNICAL MANUAL SECTION 1100.10 CURRENTLY AT HIGH TIDE THERE IS ONLY A 38" FROM SEDIMENT TO TOP OF SEAWALL. | |||
| ROW - STORMWATER FINAL | 06/13/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** JUST REINSPECTED SITE SEDIMENT STILL NEEDS TO BE REMOVED FROM CANAL REQUESTING BUILDER TO MEET ME ON SITE SO I CAN SHOW AND EXPLAIN AS TO WHAT NEEDS TO BE DONE FOR WHEN HE SCHEDULES NEXT INSPECTION. ** SEDIMENT HAS NOT BEEN REMOVED FROM THE CANAL AS INSTRUCTED ON PREVIOUS INSPECTIONS SEDIMENT WAS MANIPULATED AND PUSHED FURTHER INTO CANAL. ** POP-UP DRAIN INSTALLED. EM ** NO CORRECDTIONS WERE MADE. * NOTE TO INSPECTOR: CORRECTIONS MUST BE MADE PRIOR TO ROW FINAL APPROVAL * CAN NOT HAVE A DRAIN PIPE FROM GUTTERS DISCHARGING STORMWATER DIRECTLY INTO THE CANAL NEED TO REMOVE IMMEDIATELY, IT IS NEGATIVELY IMPACTING THE CANAL. * NEED TO REMOVE SEDIMENT THAT HAS WASHED INTO CANAL IN THE CORNER SO THAT THE APPROPRIATE CLEARANCES ARE MET IN ACCORDANCE WITH THE TECHNICAL MANUAL SECTION 1100.10 CURRENTLY AT HIGH TIDE THERE IS ONLY A 38" FROM SEDIMENT TO TOP OF SEAWALL. | |||
| ROW - STORMWATER FINAL | 06/09/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** SEDIMENT HAS NOT BEEN REMOVED FROM THE CANAL AS INSTRUCTED ON PREVIOUS INSPECTIONS SEDIMENT WAS MANIPULATED AND PUSHED FURTHER INTO CANAL. ** POP-UP DRAIN INSTALLED. EM ** NO CORRECDTIONS WERE MADE. * NOTE TO INSPECTOR: CORRECTIONS MUST BE MADE PRIOR TO ROW FINAL APPROVAL * CAN NOT HAVE A DRAIN PIPE FROM GUTTERS DISCHARGING STORMWATER DIRECTLY INTO THE CANAL NEED TO REMOVE IMMEDIATELY, IT IS NEGATIVELY IMPACTING THE CANAL. * NEED TO REMOVE SEDIMENT THAT HAS WASHED INTO CANAL IN THE CORNER SO THAT THE APPROPRIATE CLEARANCES ARE MET IN ACCORDANCE WITH THE TECHNICAL MANUAL SECTION 1100.10 CURRENTLY AT HIGH TIDE THERE IS ONLY A 38" FROM SEDIMENT TO TOP OF SEAWALL. | |||
| ROW - STORMWATER FINAL | 06/03/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** NO CORRECDTIONS WERE MADE. * REVIEW FIELD SURVEY * NOTE TO INSPECTOR: CORRECTIONS MUST BE MADE PRIOR TO ROW FINAL APPROVAL * CAN NOT HAVE A DRAIN PIPE FROM GUTTERS DISCHARGING STORMWATER DIRECTLY INTO THE CANAL NEED TO REMOVE IMMEDIATELY, IT IS NEGATIVELY IMPACTING THE CANAL. * NEED TO REMOVE SEDIMENT THAT HAS WASHED INTO CANAL IN THE CORNER SO THAT THE APPROPRIATE CLEARANCES ARE MET IN ACCORDANCE WITH THE TECHNICAL MANUAL SECTION 1100.10 CURRENTLY AT HIGH TIDE THERE IS ONLY A 38" FROM SEDIMENT TO TOP OF SEAWALL. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/03/2022 | Disapproved - NO FEE | DHANEY |
| Note: No backflow protection on IRR. system by zone valves [ PVB ] | |||
| ROW - FINAL APRON (AFTER POUR) | 06/03/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** REMOVE CONCRETE FROM CULVERT PIPE ENDS | |||
| U-CROSS CONNECTION | 06/03/2022 | Disapproved - NO FEE | DHANEY |
| Note: No backflow protection on IRR. system by zone valves [ PVB ] | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/02/2022 | APPROVED - AS NOTED | EMADISON |
| Note: * NOTE TO INSPECTOR: CORRECTIONS MUST BE MADE PRIOR TO ROW FINAL APPROVAL * CAN NOT HAVE A DRAIN PIPE FROM GUTTERS DISCHARGING STORMWATER DIRECTLY INTO THE CANAL NEED TO REMOVE IMMEDIATELY, IT IS NEGATIVELY IMPACTING THE CANAL. * NEED TO REMOVE SEDIMENT THAT HAS WASHED INTO CANAL IN THE CORNER SO THAT THE APPROPRIATE CLEARANCES ARE MET IN ACCORDANCE WITH THE TECHNICAL MANUAL SECTION 1100.10 CURRENTLY AT HIGH TIDE THERE IS ONLY A 38" FROM SEDIMENT TO TOP OF SEAWALL. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/02/2022 | APPROVED | EMADISON |
| GRAVITY SEWER TEST | 03/23/2022 | Approval - Private Provider | PPROVIDER |
| ELEV CERT-FOUNDATION APPROVAL | 03/22/2022 | APPROVED | JMYERS |
| U - SEWER TIE IN | 03/22/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: GOOGLE DUO INSPECTION WAS DONE | |||
| ROW- PRE-APRON (PRE-POUR) | 03/22/2022 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 03/21/2022 | Disapproved - NO FEE | LMILLER |
| Note: this property has private provider inspections | |||
| ELECTRIC - EARLY POWER | 03/14/2022 | Approval - Private Provider | PPROVIDER |
| INSULATION | 12/20/2021 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 12/14/2021 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 12/06/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 11/12/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 10/05/2021 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 09/20/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 09/09/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/01/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 08/09/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 06/02/2022 | 06/02/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| PLFM | HOLD | 06/01/2022 | 06/02/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff does not see a seal in Section D of the elevation certificate. If a raised seal was used it needs to be shaded so it is visible. | |||
| PLFM | COMPLETE | 03/22/2022 | 03/22/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate was already approved, there are no changes on the new foundation elevation certificate. | |||
| CUSVC | COMPLETE | 10/08/2021 | 10/08/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| PLFM | COMPLETE | 09/21/2021 | 09/21/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| ENGIN1 | COMPLETE | 09/20/2021 | 09/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 09/20/2021 | 09/20/2021 |
| Note: Held By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM In Section D a box must be checked for the latitude and longitude, and a signature is missing from the signature area. | |||
| ZON | COMPLETE | 09/20/2021 | 09/20/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 06/14/2021 | 06/15/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been accepted. However, on the building elevation certificate please make sure all elevations have a measurement box checked in Section C. In Section D, please either shade over the raised seal so it can be seen or use a wet seal. | |||
| PLFM | HOLD | 06/04/2021 | 06/04/2021 |
| Note: Held By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 5/11/21, the structure falls within the Special Flood Hazard Area. Please provide elevation certificates at construction, foundation, and final. | |||
| ZON | COMPLETE | 06/04/2021 | 06/04/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/18/2021 | 05/18/2021 |
| Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM Bench mark identified on second sheet | |||
| CUSVC | COMPLETE | 05/11/2021 | 05/12/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ENGIN1 | COMPLETE | 05/11/2021 | 05/11/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/11/2021 | 05/17/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/11/2021 | 05/17/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM .An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks.(D) | |||
| ZON | HOLD | 05/11/2021 | 05/14/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Banding required on all windows facing the street side (left side) | |||
| SWALE | COMPLETE | 05/11/2021 | 07/28/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/28/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/28/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/28/2022 |
| METER - DEPOSIT | ¤60.00 | 02/01/2022 |
| WATER-METER | ¤441.07 | 02/01/2022 |
| WATER- TURN ON | ¤25.00 | 02/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/01/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/16/2021 |
| SITE PLAN 20 | ¤20.00 | 06/16/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/16/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/16/2021 |
| METER - DEPOSIT | ¤60.00 | 06/16/2021 |
| WATER- TURN ON | ¤25.00 | 06/16/2021 |
| ADMIN FEE | ¤20.00 | 06/16/2021 |
| CONNECTION FEES | ¤1,017.83 | 06/16/2021 |
| BUILDING DISCOUNT 100% | (¤20.00) | 06/16/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/16/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/16/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/16/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/16/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/16/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/16/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/16/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/16/2021 |
| SEWER INSPECTION | ¤25.00 | 06/16/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/16/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/16/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,742.50 |