Permit #2021050864

Permit Details

Status: COED

Parcel Id: 07-11-31-7030-00760-0060
CONDITIONED SPACE: 1650 sqft
OPENED PORCH (WITH ROOF) : 81 sqft
GARAGE: 403 sqft
Total Square Footage: 2134 sqft
Block: 00760
Subdivision: 2154 - SECTION 30-ROYAL PALMS
Job Phone: 321-249-3126
Location Address: 114 RAMBLEWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/19/2021
NOC: RECORDED
Applicant name: MOREY C DOYLE
Owner: ROEUN SAROEUN & NOLEDA TOUCH

Address

6 POSTMAN LANE

PALM COAST, FL 32164

Lot: 0060
Contracted Stated Job Value: ¤99,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

WADE JURNEY HOMES
Status Location Address State License Number Phone
CANCEL

3091 GOVERNORS LAKE DRIVE

NORCROSS, GA 30071

CGC1517458 (Exp: 08/31/2022) 321-249-3126

Sub Contractors

IAN ALAN BRENNER
Status Location Address Mailing Address State License Number Phone
ACTIVE

691 GARDEN COMMERCE PKWY

WINTER GARDEN, FL 34787

STE 170

WINTER GARDEN, FL 34787

CCC1331270 (Exp: 08/31/2026) 407-649-1333
EDWIN R INSALACO
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

3191 MAGUIRE BLVD

ORLANDO, FL 32803

STE 200

ORLANDO, FL 32803

EC13001310 (Exp: 08/31/2024) 321-441-7990 407-426-9741
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307
DANIEL P GREGOIRE
Status Location Address State License Number Phone
INACTIVE

64 W. CENTRAL AVENUE

LAKE WALES, FL 33853

CFC057378 (Exp: 08/31/2024) (863)696-3737

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 11/04/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION SWALE ON THE LEFT SIDE NEED TO Match existing grade, Swale not graded to match existing surounding grade IN THE BACK OF THE HOUSE AND RIGHT BACK CORNER, Not enough drainage away from the structure away from to the building. Water will stand next to and near the foundation. Needs more fall away from the structure. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) H.Florida Building Code, Residential, Chapter 4, R404.1.6I. 10/29/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTEs 11/04/2021=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
U -UTILITY RESIDENTIAL FINAL 10/29/2021 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 10/29/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: SWALE ON THE LEFT SIDE NEED TO Match existing grade, Swale not graded to match existing surounding grade IN THE BACK OF THE HOUSE AND RIGHT BACK CORNER, Not enough drainage away from the structure away from to the building. Water will stand next to and near the foundation. Needs more fall away from the structure. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) H.Florida Building Code, Residential, Chapter 4, R404.1.6I. 10/29/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTEs
PLUMBING FINAL 10/29/2021 Approval - Private Provider PPROVIDER
HVAC FINAL 10/29/2021 Approval - Private Provider PPROVIDER
ELECTRIC FINAL 10/29/2021 Approval - Private Provider PPROVIDER
BLD - BUILDING FINAL 10/29/2021 Approval - Private Provider PPROVIDER
ROW- PROJECT STATUS 10/29/2021 APPROVED - AS NOTED GBERTOLA
Note: MEETING WITH JW SUPERVISOR
ROW - FINAL APRON (AFTER POUR) 10/28/2021 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW FIELD SURVEY /GRADING CERTIFICATION 10/28/2021 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
FINAL SURVEY (OFFICE USE ONLY) 10/28/2021 APPROVED GBERTOLA
U-CROSS CONNECTION 10/26/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
GRAVITY SEWER TEST 10/11/2021 Approval - Private Provider PPROVIDER
U - SEWER TIE IN 10/08/2021 APPROVED JWALKER
ROW- PRE-APRON (PRE-POUR) 10/06/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NOT READY FOR INSPECTION. NOT FORMED YET 10/05/2021=MISSING REBARS THAT AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. NEED DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. CULVERT ELEVATION IS GOOD 10/06/2021=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING
ROW- PRE-APRON (PRE-POUR) 10/05/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION NOT READY FOR INSPECTION. NOT FORMED YET 10/05/2021=MISSING REBARS THAT AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. NEED DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. CULVERT ELEVATION IS GOOD
ROW- PRE-APRON (PRE-POUR) 10/04/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: NOT READY FOR INSPECTION. NOT FORMED YET
ELECTRIC - EARLY POWER 09/30/2021 Approval - Private Provider PPROVIDER
INSULATION 08/26/2021 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 08/24/2021 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 08/24/2021 Approval - Private Provider PPROVIDER
Note: 08/24/2021 Wire Lath Inspection passed.
ALL ROUGH 08/23/2021 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 08/23/2021 APPROVED TBAKER
ROW - DRAINAGE 08/16/2021 APPROVED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage needs opened across the front of the construction project. Next inspection 6/28/21. 06/29/2021=NEED A TO INSTALL A SILT FENCE, NEED A PIPE IN THE FRONT BE BACK 07/06/2021 07/06/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE BE BACK ON 07/08/2021. 7/21/21 - Temporary Culvert Installed. Next inspection 7/29/21. 07/082021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE be back on 07/09/2021 07/09/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK =07/14/2021 07/14/2021= NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY inspector be back on 07/16/2021 07/16/2021=ROW STILL NO OPEN PIPE IS DOWN BUT STILL A LOT DIRT IN FRONT OF THE PIPE NEED TO OPEN THE SWALE BOTH SIDE TO THE END OF YOUR PROPERTY , STILL NEED A SILT FENCE ALL AROUND THE CONSTRUCTION SITE 07/202/2021=NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE = 07/202021=Erosion Control Inspection (inspection code # 119) ROW STILL NO OPEN PIPE IS DOWN BUT STILL A LOT DIRT IN FRONT OF THE PIPE NEED TO OPEN THE SWALE BOTH SIDE TO THE END OF YOUR PROPERTY , STILL NEED A SILT FENCE ALL AROUND THE CONSTRUCTION SITE IF SILT FENCE IS NO DOWN IN 5 DAYS I WILL TRANSFER THIS TO CODE ENFORCEMENT ON 07/26/2021
ROOF VALLEY & METAL 08/11/2021 Approval - Private Provider PPROVIDER
Note: 08/11/2021 Roof Underlayment, Valley and Metal inspection passed.
WALL SHEATHING 08/04/2021 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/04/2021 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 07/29/2021 PARTIALLY APPROVED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage needs opened across the front of the construction project. Next inspection 6/28/21. 06/29/2021=NEED A TO INSTALL A SILT FENCE, NEED A PIPE IN THE FRONT BE BACK 07/06/2021 07/06/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE BE BACK ON 07/08/2021. 7/21/21 - Temporary Culvert Installed. Next inspection 7/29/21. 07/082021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE be back on 07/09/2021 07/09/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK =07/14/2021 07/14/2021= NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY inspector be back on 07/16/2021 07/16/2021=ROW STILL NO OPEN PIPE IS DOWN BUT STILL A LOT DIRT IN FRONT OF THE PIPE NEED TO OPEN THE SWALE BOTH SIDE TO THE END OF YOUR PROPERTY , STILL NEED A SILT FENCE ALL AROUND THE CONSTRUCTION SITE 07/202/2021=NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE = 07/202021=Erosion Control Inspection (inspection code # 119) ROW STILL NO OPEN PIPE IS DOWN BUT STILL A LOT DIRT IN FRONT OF THE PIPE NEED TO OPEN THE SWALE BOTH SIDE TO THE END OF YOUR PROPERTY , STILL NEED A SILT FENCE ALL AROUND THE CONSTRUCTION SITE IF SILT IS NO DOWN IN 5 DAYS I WILL TRANSFER THIS TO CODE ENFORCEMENT ON 07/26/2021
ROW - DRAINAGE 07/21/2021 PARTIALLY APPROVED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage needs opened across the front of the construction project. Next inspection 6/28/21. 06/29/2021=NEED A TO INSTALL A SILT FENCE, NEED A PIPE IN THE FRONT BE BACK 07/06/2021 07/06/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE BE BACK ON 07/08/2021. 7/21/21 - Temporary Culvert Installed. Next inspection 7/29/21. 07/082021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE be back on 07/09/2021 07/09/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK =07/14/2021 07/14/2021= NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY inspector be back on 07/16/2021 07/16/2021=ROW STILL NO OPEN PIPE IS DOWN BUT STILL A LOT DIRT IN FRONT OF THE PIPE NEED TO OPEN THE SWALE BOTH SIDE TO THE END OF YOUR PROPERTY , STILL NEED A SILT FENCE ALL AROUND THE CONSTRUCTION SITE 07/202/2021=NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE = 07/202021=Erosion Control Inspection (inspection code # 119) ROW STILL NO OPEN PIPE IS DOWN BUT STILL A LOT DIRT IN FRONT OF THE PIPE NEED TO OPEN THE SWALE BOTH SIDE TO THE END OF YOUR PROPERTY , STILL NEED A SILT FENCE ALL AROUND THE CONSTRUCTION SITE IF SILT IS NO DOWN IN 5 DAYS I WILL TRANSFER THIS TO CODE ENFORCEMENT ON 07/26/2021
ROW - DRAINAGE 07/20/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage needs opened across the front of the construction project. Next inspection 6/28/21. 06/29/2021=NEED A TO INSTALL A SILT FENCE, NEED A PIPE IN THE FRONT BE BACK 07/06/2021 07/06/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE BE BACK ON 07/08/2021 07/082021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE be back on 07/09/2021 07/09/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK =07/14/2021 07/14/2021= NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY inspector be back on 07/16/2021 07/16/2021=ROW STILL NO OPEN PIPE IS DOWN BUT STILL A LOT DIRT IN FRONT OF THE PIPE NEED TO OPEN THE SWALE BOTH SIDE TO THE END OF YOUR PROPERTY , STILL NEED A SILT FENCE ALL AROUND THE CONSTRUCTION SITE 07/202/2021=NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE = 07/202021=Erosion Control Inspection (inspection code # 119) ROW STILL NO OPEN PIPE IS DOWN BUT STILL A LOT DIRT IN FRONT OF THE PIPE NEED TO OPEN THE SWALE BOTH SIDE TO THE END OF YOUR PROPERTY , STILL NEED A SILT FENCE ALL AROUND THE CONSTRUCTION SITE IF SILT IS NO DOWN IN 5 DAYS I WILL TRANSFER THIS TO CODE ENFORCEMENT ON 07/26/2021
ROW - DRAINAGE 07/16/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage needs opened across the front of the construction project. Next inspection 6/28/21. 06/29/2021=NEED A TO INSTALL A SILT FENCE, NEED A PIPE IN THE FRONT BE BACK 07/06/2021 07/06/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE BE BACK ON 07/08/2021 07/082021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE be back on 07/09/2021 07/09/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK =07/14/2021 07/14/2021= NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY inspector be back on 07/16/2021 07/16/2021=ROW STILL NO OPEN PIPE IS DOWN BUT STILL A LOT DIRT IN FRONT OF THE PIPE NEED TO OPEN THE SWALE BOTH SIDE TO THE END OF YOUR PROPERTY , STILL NEED A SILT FENCE ALL AROUND THE CONSTRUCTION SITE INSPECTOR BE BACK ON 07/19/2021
TIE BEAM / LINTEL 07/14/2021 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 07/14/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage needs opened across the front of the construction project. Next inspection 6/28/21. 06/29/2021=NEED A TO INSTALL A SILT FENCE, NEED A PIPE IN THE FRONT BE BACK 07/06/2021 07/06/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE BE BACK ON 07/08/2021 07/082021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE be back on 07/09/2021 07/09/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK =07/14/2021 07/14/2021= NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY inspector be back on 07/16/2021
ROW - DRAINAGE 07/09/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage needs opened across the front of the construction project. Next inspection 6/28/21. 06/29/2021=NEED A TO INSTALL A SILT FENCE, NEED A PIPE IN THE FRONT BE BACK 07/06/2021 07/06/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE BE BACK ON 07/08/2021 07/082021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE be back on 07/09/2021 07/09/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK =07/14/2021
ROW - DRAINAGE 07/07/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage needs opened across the front of the construction project. Next inspection 6/28/21. 06/29/2021=NEED A TO INSTALL A SILT FENCE, NEED A PIPE IN THE FRONT BE BACK 07/06/2021 07/06/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE BE BACK ON 07/08/2021 07/082021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE be back on 07/09/2021
ROW - DRAINAGE 07/06/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage needs opened across the front of the construction project. Next inspection 6/28/21. 06/29/2021=NEED A TO INSTALL A SILT FENCE, NEED A PIPE IN THE FRONT BE BACK 07/06/2021 07/06/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE BE BACK ON 07/08/2021
MONOLITHIC SLAB 07/01/2021 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 06/29/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION Drainage needs opened across the front of the construction project. Next inspection 6/28/21. 06/29/2021=NEED A TO INSTALL A SILT FENCE, NEED A PIPE IN THE FRONT BE BACK 07/06/2021
PLUMBING 1ST ROUGH UNDERGROUND 06/28/2021 Approval - Private Provider PPROVIDER
Note: 06/28/2021 Underground plumbing inspection passed.
MONOLITHIC SLAB 06/28/2021 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 06/22/2021 Disapproved - NO FEE RGROSS
Note: Drainage needs opened across the front of the construction project. Next inspection 6/25/21.
WATER METER INSTALLATION REQUEST 06/02/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 08/23/2021 08/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/23/2021 08/23/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 05/19/2021 05/19/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 05/14/2021 07/30/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 05/13/2021 05/14/2021
Note: Released By: JPI
CUSVC COMPLETE 05/13/2021 05/14/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 05/13/2021 05/14/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/13/2021 05/14/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/13/2021 05/18/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 05/13/2021 05/14/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/13/2021 05/18/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 05/13/2021 05/19/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Section number missing in legal description on site plan/survey

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
STORMWATER REINSPECTION FEE ¤40.00 11/03/2021
STORMWATER REINSPECTION FEE ¤40.00 11/03/2021
STORMWATER REINSPECTION FEE ¤40.00 11/03/2021
STORMWATER REINSPECTION FEE ¤40.00 11/03/2021
STORMWATER REINSPECTION FEE ¤40.00 11/03/2021
STORMWATER REINSPECTION FEE ¤40.00 11/03/2021
STORMWATER REINSPECTION FEE ¤40.00 11/03/2021
SW ENG - FIELD SURVEY INSPECT ¤20.00 11/03/2021
SW ENG REINSPECTION 20 ¤20.00 11/03/2021
SW ENG REINSPECTION 30 ¤30.00 11/03/2021
SW ENG REINSPECTION 30 ¤30.00 11/03/2021
STORM WATER PERMIT FEES ¤80.00 05/19/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 05/19/2021
SEWER CREDIT (¤1,147.00) 05/19/2021
SEWER INSPECTION ¤25.00 05/19/2021
SEWER CAPITAL FACILITY ¤4,664.55 05/19/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 05/19/2021
METER - DEPOSIT ¤60.00 05/19/2021
WATER- TURN ON ¤25.00 05/19/2021
ADMIN FEE ¤20.00 05/19/2021
CONNECTION FEES ¤1,017.83 05/19/2021
BUILDING DISCOUNT 100% (¤1,052.60) 05/19/2021
ELECTRIC FEE ¤181.80 05/19/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 05/19/2021
IMPACT FEE FIRE ¤367.00 05/19/2021
IMPACT FEE PARKS ¤1,199.12 05/19/2021
IMPACT FEE SCHOOL ¤3,600.00 05/19/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 05/19/2021
MECHANICAL FEE ¤181.80 05/19/2021
WATER -IRRIGATION INSPECTION ¤25.00 05/19/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 05/19/2021
PLAN CHECK FEE ¤81.20 05/19/2021
PLUMBING FEE ¤181.80 05/19/2021
NEW RESIDENTIAL INSPECTIONS ¤406.00 05/19/2021
SITE PLAN 20 ¤20.00 05/19/2021
SURCHARGE FS 533.721 ¤2.00 05/19/2021
SURCHARGE - FS 468.631 ¤2.00 05/19/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,364.43