I want to search for...
Permit #2021050891
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00410-0290 |
| CONDITIONED SPACE: 1650 sqft |
| GARAGE: 403 sqft |
| OPENED PORCH (WITH ROOF) : 81 sqft |
| Total Square Footage: 2134 sqft |
| Block: 00410 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 321-249-3126 |
| Location Address: 2 PILLAR LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/20/2021 |
| NOC: RECORDED |
| Applicant name: MOREY C DOYLE |
| Owner: WJHFL DBA A WJH LLC A DELAWARE |
|
Address 3091 GOVERNORS LAKE DRIVE NORCROSS , GA 30071 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤99,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WADE JURNEY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
3091 GOVERNORS LAKE DRIVE NORCROSS, GA 30071 |
CGC1517458 (Exp: 08/31/2022) | 321-249-3126 |
Sub Contractors
IAN ALAN BRENNER
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
691 GARDEN COMMERCE PKWY WINTER GARDEN, FL 34787 |
STE 170 WINTER GARDEN, FL 34787 |
CCC1331270 (Exp: 08/31/2026) | 407-649-1333 |
EDWIN R INSALACO
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
3191 MAGUIRE BLVD ORLANDO, FL 32803 |
STE 200 ORLANDO, FL 32803 |
EC13001310 (Exp: 08/31/2024) | 321-441-7990 | 407-426-9741 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING FINAL | 12/30/2021 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 12/30/2021 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 12/30/2021 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 12/30/2021 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 12/30/2021 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 12/29/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD 12/29/2021=Re -grade permit has issue number 2021121135 at the ende of the re grade need a new final survey | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/29/2021 | APPROVED | GBERTOLA |
| Note: 12/29/2021=Re -grade permit has issue number 2021121135 at the end of the re grade need a new final survey | |||
| ROW - STORMWATER FINAL | 12/29/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: 12/29/2021=Re -grade permit has issue number 2021121135 to fix all swale around the property at the ende of the re grade need a new final survey also need to fix the sod by the road need to be lower then the road. The top of slope of “V” swales along the property lines shall be a minimum of 0.20 feet higher than the toe of slope. finish grade to be 2 inches below the edge of the pavement before the sod is laid sec. 300.f The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) I.Land Development Code Technical Manual, Section 300, Drawing 300.D, DISTANCE BETWEEN EDGE OF THE PAVEMENT AND RIGHT-OF-WAY LINE IS APPROXIMATELY 15 FEET, ON THE INSIDE OF THE PROPERTY NEED A 4-1 SLPOPE | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/29/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: 12/29/2021=Re -grade permit has issue number 2021121135 at the ende of the re grade need a new final survey The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) I.Land Development Code Technical Manual, Section 300, Drawing 300.D, DISTANCE BETWEEN EDGE OF THE PAVEMENT AND RIGHT-OF-WAY LINE IS APPROXIMATELY 15 FEET, ON THE INSIDE OF THE PROPERTY NEED A 4-1 SLPOPE | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/28/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) I.Land Development Code Technical Manual, Section 300, Drawing 300.D, DISTANCE BETWEEN EDGE OF THE PAVEMENT AND RIGHT-OF-WAY LINE IS APPROXIMATELY 15 FEET, ON THE INSIDE OF THE PROPERTY NEED A 4-1 SLPOPE | |||
| ROW- PROJECT STATUS | 12/28/2021 | APPROVED | GBERTOLA |
| Note: have a meeting with the grading guy and CM NATE ABOUT THE RE-GRADING THE SWALE | |||
| ELECTRIC - EARLY POWER | 12/14/2021 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 12/06/2021 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 12/03/2021 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 11/15/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING | |||
| PEP TANK INSTALLATION REQUEST | 11/08/2021 | APPROVED | CSTONE |
| FOUND SURVEY APPROVED (OFFICE) | 11/05/2021 | APPROVED | TBAKER |
| INSULATION | 11/02/2021 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 11/01/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ALL ROUGH | 11/01/2021 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 10/27/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 10/14/2021 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 10/11/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/11/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 10/01/2021 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 09/22/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/09/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 07/29/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | HOLD | 12/30/2021 | 12/30/2021 |
| Note: Held By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM BLOWER DOOR TEST SAYS 2017 6TH EDITON BLOWER NEEDS TO SAY 2020 7 EDITION | |||
| BADMIN | COMPLETE | 12/30/2021 | 12/30/2021 |
| Note: Released By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 12/28/2021 | 12/28/2021 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM If you are submitting for a regrading permit, you cannot submit on an existing permit, a new permit must be created/applied for. | |||
| BADMIN | COMPLETE | 12/28/2021 | 12/28/2021 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 12/28/2021 | 12/28/2021 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Same comment as previous - you cannot submit an application through another permit. The permit has to be separate permit applied for. You can do this online in the same manner as the single family residence permit by choosing the lot grading permit type. | |||
| BADMIN | COMPLETE | 12/28/2021 | 12/28/2021 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/05/2021 | 11/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/05/2021 | 11/05/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/15/2021 | 07/30/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/14/2021 | 05/14/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/14/2021 | 05/17/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/14/2021 | 05/17/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/14/2021 | 05/15/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/14/2021 | 05/19/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/14/2021 | 05/17/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/14/2021 | 05/19/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/14/2021 | 05/20/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 05/20/2021 |
| WATER- TURN ON | ¤25.00 | 05/20/2021 |
| ADMIN FEE | ¤20.00 | 05/20/2021 |
| CONNECTION FEES | ¤1,017.83 | 05/20/2021 |
| BUILDING DISCOUNT 100% | (¤1,052.60) | 05/20/2021 |
| ELECTRIC FEE | ¤181.80 | 05/20/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 05/20/2021 |
| IMPACT FEE FIRE | ¤367.00 | 05/20/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 05/20/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/20/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 05/20/2021 |
| MECHANICAL FEE | ¤181.80 | 05/20/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/20/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 05/20/2021 |
| PLAN CHECK FEE | ¤81.20 | 05/20/2021 |
| PLUMBING FEE | ¤181.80 | 05/20/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤406.00 | 05/20/2021 |
| SITE PLAN 20 | ¤20.00 | 05/20/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/20/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/20/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/20/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 05/20/2021 |
| SEWER CREDIT | (¤1,147.00) | 05/20/2021 |
| SEWER INSPECTION | ¤25.00 | 05/20/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 05/20/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 05/20/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,984.43 |