Permit #2021050941
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7031-00590-0180 |
| Total Square Footage: 945 sqft |
| Block: 00590 |
| Subdivision: 2166 - SECTION 31-ROYAL PALMS |
| Job Phone: 386-227-2646 |
| Location Address: 8 RIVERSIDE LN |
| Type: DR - DRIVEWAY |
| Issue Date: 06/02/2021 |
| NOC: Unknown |
| Applicant name: JUAN P BARTOLOME HERNANDEZ |
| Owner: MIELE FRANK A & APOLONIA E TRUSTEES & AGOSTINO A M |
|
Address 8 RIVERSIDE LANE PALM COAST, FL 32164 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤1,000.00 |
| Job Description: CONCRETE CIRCULAR DRIVEWAY AND EXTENSION OF 6' CONCRETE SIDEWALK |
| Type: CN |
Contractor
A TOUCH OF SPAIN INC
| Status | Location Address | Phone |
| INACTIVE |
74 SEVEN WONDERS TRAIL , |
386-227-2646 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 06/01/2022 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 01/21/2022 | APPROVED | GBERTOLA |
| Note: 01/21/2022= CORRERCTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD THIS IS A REINSPECTION rigth side minor end need to remove the sand from inside the culvert pipe and sodded the swale THE DRIVEWAY CULVERT PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED ON THE LEFT SIDE.MARKED WITH PINK SPRAY PAINT MITERED END FOOTERS ARE HIGHER THAN THE CULVERT INVERT NEED TO GRIND THEM DOWN 12/13/21 - Left side needs concrete removed from the inside end of the Culvert. Right side needs concrete removed from under the ground that was overpoured and could cause damage when the swale is regraded with a Grad-all. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/21/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL INSPECTION | 12/13/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION rigth side minor end need to remove the sand from inside the culvert pipe and sodded the swale THE DRIVEWAY CULVERT PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED ON THE LEFT SIDE.MARKED WITH PINK SPRAY PAINT MITERED END FOOTERS ARE HIGHER THAN THE CULVERT INVERT NEED TO GRIND THEM DOWN 12/13/21 - Left side needs concrete removed from the inside end of the Culvert. Right side needs concrete removed from under the ground that was overpoured and could cause damage when the swale is regraded with a Grad-all. | |||
| ROW - FINAL INSPECTION | 08/23/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: rigth side minor end need to remove the sand from inside the culvert pipe and sodded the swale THE DRIVEWAY CULVERT PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED ON THE LEFT SIDE.MARKED WITH PINK SPRAY PAINT MITERED END FOOTERS ARE HIGHER THAN THE CULVERT INVERT NEED TO GRIND THEM DOWN | |||
| ROW- PRE-APRON (PRE-POUR) | 07/12/2021 | APPROVED - AS NOTED | KRUTH |
| Note: 7/8/21 - Pipe and area flooded out and washed out under the pipe end footers. Could not see if rebar was there or not. Corrections made 7/12/21 pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/08/2021 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION 7/8/21 - Pipe and area flooded out and washed out under the pipe end footers. Could not see if rebar was there or not. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/06/2021 | CANCELLED BY APPLICANT | RGROSS |
Review History
| Department | Status | Date In | Date Out |
| ZON | HOLD | 05/26/2021 | 05/26/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENT: Please note that the driveway must be separated from the front walkway or it will exceed the maximum width allowed for a circular driveway. You have it drawn right up to the existing walkway. If you are going to include it - the total width of a circular driveway cannot exceed 18' at its widest point. THE SITE PLAN RECEIVED ON 5/25 STILL SHOWS THE CONCRETE DRIVEWAY ABUTTING THE FRONT WALKWAY WHICH WOULD MAKE THE DRIVEWAY WIDER THAN ALLOWED. | |||
| ZON | COMPLETE | 05/26/2021 | 05/27/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/24/2021 | 05/24/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please note that the driveway must be separated from the front walkway or it will exceed the maximum width allowed for a circular driveway. You have it drawn right up to the existing walkway. If you are going to include it - the total width of a circular driveway cannot exceed 18' at its widest point. | |||
| ZON | HOLD | 05/19/2021 | 05/20/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM The 8 foundation plantings need to be between 2 to 8 feet from the foundation of the home - the ones you have in the curved area do not count. The curved area must show the setback to be at least 5' from the property line. | |||
| ENGIN1 | COMPLETE | 05/14/2021 | 05/18/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 05/14/2021 | 05/19/2021 |
| Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/14/2021 | 05/17/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM New patio to left side does not meet the minimum 25' front setback. Only a walkway no wider than 6' would be allowed. You will need to demonstrate that the house will meet the landscaping requirements that there are a minimum of 8 foundation plantings within 2-8 feet from the foundation of the home if you are adding a front walkway. Please provide the setback from the front property line to the bottom arc of the new circular driveway to demonstrate it meets the minimum 5' required. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/31/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/31/2022 |
| STORM WATER PERMIT FEES | ¤40.00 | 06/02/2021 |
| ADMIN FEE | ¤20.00 | 06/02/2021 |
| BUILDING DISCOUNT 100% | (¤20.00) | 06/02/2021 |
| SITE PLAN 20 | ¤20.00 | 06/02/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/02/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/02/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤104.00 |