Permit #2021051114
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00570-0070 |
| CONDITIONED SPACE: 1527 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 120 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| Total Square Footage: 2111 sqft |
| Block: 00570 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: (386)437-1508 |
| Location Address: 65 RANDOLPH DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/09/2021 |
| NOC: RECORDED |
| Applicant name: TAMMI SUE MARQUIS |
| Owner: JM PROPERTIES X LLC |
|
Address PO BOX 9 CISSNA PARK, IL 60924 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
GULFSTREAM HOMES & CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 1092 BUNNELL, FL 32110 |
CRC1326418 (Exp: 08/31/2026) | (386)437-1508 | 386-437-9769 |
Sub Contractors
JAMES CRAIG FISHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 451 BUNNELL, FL 32110 |
CAC1819807 (Exp: 08/31/2026) | 386-222-9549 |
ARTHUR J PASCOE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 730007 ORMOND BEACH, FL 32174 |
EC13007168 (Exp: 08/31/2026) | 386-547-6439 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
MICHAEL MATTHEW SANKOSWSKI
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3 SEAMANSHIP TRAIL PALM COAST, FL 32164 |
CAC1818816 (Exp: 08/31/2026) | 386-316-4401 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 09/02/2022 | APPROVED | GBERTOLA |
| Note: BUILDER IS GOING TO FIX THE SWALE | |||
| U -UTILITY RESIDENTIAL FINAL | 09/01/2022 | FINAL APPROVED | JHARDING |
| BLD - BUILDING FINAL | 09/01/2022 | Disapproved - NO FEE | JWALKER |
| Note: Exterior outlets need to be GFI protected. Laundry room outlet lower left wall not GFI protected. Laundry branch can serve no other circuts. NEC 210.11 Anti tilt not installed on oven. | |||
| BLD - BUILDING FINAL | 09/01/2022 | FINAL APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Exterior outlets need to be GFI protected. Laundry room outlet lower left wall not GFI protected. Laundry branch can serve no other circuts. NEC 210.11 Anti tilt not installed on oven. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/31/2022 | APPROVED | GBERTOLA |
| Note: correction were made | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/31/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U-CROSS CONNECTION | 08/31/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 08/31/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U-CROSS CONNECTION | 08/30/2022 | CANCELLED BY APPLICANT | WEB |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/30/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 08/30/22= THE FRONT OR SIDE PROPERTY LINE CAN NOT BE LOWER THEM THE PROPERTY LINE NEED TO READ INSPECTOR NOTES, CHECK FINAL SURVEY FOR DETAIL. 08/29/22=The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/29/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: 08/29/22=The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/26/2022 | CANCELLED BY APPLICANT | STHOMAS |
| ELECTRIC - EARLY POWER | 08/05/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:12 am | |||
| ROW- PRE-APRON (PRE-POUR) | 07/18/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. APRON SOFT | |||
| ROW- PRE-APRON (PRE-POUR) | 07/15/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. APRON SOFT | |||
| U - SEWER TIE IN | 07/06/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 07/06/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 06/10/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 4/19/2022 12:00:48 PM Interior (sheet rock) email rhand@palmcoastgov.com with questions | |||
| INSULATION | 05/03/2022 | APPROVED | JWALKER |
| PEP TANK INSTALLATION REQUEST | 04/19/2022 | Disapproved - NO FEE | CSTONE |
| Note: Interior (sheet rock) email rhand@palmcoastgov.com with questions | |||
| ALL ROUGH | 04/11/2022 | APPROVED - AS NOTED | JWALKER |
| Note: seal dryer duct and microwave exhaust duct fittings completely raise flex duct off ceiling joist to allow for propoer blow in insulation depth | |||
| LATH/BRICK/ WATER BARRIER | 04/07/2022 | APPROVED | JWALKER |
| ROOF VALLEY & METAL | 04/04/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/24/2022 | APPROVED - AS NOTED | JWALKER |
| Note: THIS IS A REINSPECTION 3/22/22 Meet on site with contractor, Contractor will take care of the mismatched engineering and the truss layout plan. Down cells pass. Roof sheating was inspected and passes. Contractor may finish roof valley metal for inspection so as to keep the job moving. 3/24/22 Gable end bracing and blocking needs to be installed. Details on page A6 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/22/2022 | Disapproved - NO FEE | JWALKER |
| Note: 3/22/22 Meet on site with contractor, Contractor will take care of the mismatched engineering and the truss layout plan. Down cells pass. Roof sheating was inspected and passes. Contractor may finish roof valley metal for inspection so as to keep the job moving. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/04/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/10/2021 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 10/18/2021 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/12/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/25/2021 | APPROVED | TCHURCHILL |
| ROW - DRAINAGE | 08/23/2021 | APPROVED | GBERTOLA |
| Note: meet with the builder |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/14/2022 | 04/18/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/04/2022 | 03/04/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/04/2022 | 03/04/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/24/2022 | 02/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/24/2022 | 03/02/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/24/2022 | 02/24/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/14/2022 | 01/14/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 12/14/2021 | 12/14/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Slab elevation on foundation survey is 1.8' higher than approved site plan. Please revise and resubmit appropriate drawing. | |||
| ZON | COMPLETE | 12/14/2021 | 12/14/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 08/03/2021 | 08/03/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please submit revised survey. Original survey elevations are off by 1.81' according to ITT as-builts. | |||
| ZON | COMPLETE | 06/08/2021 | 06/08/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/07/2021 | 06/07/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/07/2021 | 06/07/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/07/2021 | 06/07/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM This house backs to a rear street so Banding is required around windows and doors on the rear | |||
| ENGIN1 | HOLD | 05/19/2021 | 05/19/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey elevations differ form ITT as-builts by 1.81' | |||
| BLD | COMPLETE | 05/18/2021 | 05/23/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/18/2021 | 05/20/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/18/2021 | 05/19/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/18/2021 | 05/18/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/18/2021 | 05/24/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/18/2021 | 05/19/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Duct Layout needs to be signed by the AC contractor | |||
| SW1 | COMPLETE | 05/18/2021 | 05/25/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/18/2021 | 05/24/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM This house back to a rear street. Banding required around windows and doors in rear Additional foundation plantings required along the rear. | |||
| SWALE | COMPLETE | 05/18/2021 | 04/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/31/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/31/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/31/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/09/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/09/2021 |
| SEWER CREDIT | (¤1,342.00) | 06/09/2021 |
| SEWER INSPECTION | ¤25.00 | 06/09/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/09/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/09/2021 |
| CONNECTION FEES | ¤1,017.83 | 06/09/2021 |
| METER - DEPOSIT | ¤60.00 | 06/09/2021 |
| WATER- TURN ON | ¤25.00 | 06/09/2021 |
| ADMIN FEE | ¤20.00 | 06/09/2021 |
| BUILDING DISCOUNT 100% | (¤1,010.60) | 06/09/2021 |
| ELECTRIC FEE | ¤175.80 | 06/09/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/09/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/09/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/09/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/09/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/09/2021 |
| MECHANICAL FEE | ¤175.80 | 06/09/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/09/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/09/2021 |
| PLAN CHECK FEE | ¤77.20 | 06/09/2021 |
| PLUMBING FEE | ¤175.80 | 06/09/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤386.00 | 06/09/2021 |
| SITE PLAN 20 | ¤20.00 | 06/09/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/09/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/09/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,881.93 |