I want to search for...

Permit #2021051146

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00730-0100
CONDITIONED SPACE: 1198 sqft
CONDITIONED SPACE: 1198 sqft
GARAGE: 330 sqft
GARAGE: 330 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
OPENED PORCH (WITH ROOF) : 30 sqft
OPENED PORCH (WITH ROOF) : 30 sqft
Total Square Footage: 3298 sqft
Block: 00730
Subdivision: -
Job Phone: (386) 246-6123
Location Address: 8 SLEEPY HOLLOW TR
Type: DU - DUPLEX
Issue Date: 05/25/2021
NOC: RECORDED
Applicant name: BRIAN ANDREW GAZZOLI
Owner: ZUKERMAN MICHAEL NATALIE H&W

Address

3106 S WOODALL DR

SOLON, OH 44139

Lot: 0100
Contracted Stated Job Value: ¤282,480.00
Job Description: Duplex residential
Type: CN

Contractor

SEAGATE HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

185 CYPRESS POINT PARKWAY

Palm Coast, FL 32137

SUITE 7

Palm Coast, FL 32137

CGC1518372 (Exp: 08/31/2026) 386-246-6132

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/02/2022 FINAL APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Cancelled 02/25/2022 03/01/2022// cancelled by super
BLD - BUILDING FINAL 03/01/2022 CANCELLED BY APPLICANT TSTAUFFACHER
Note: THIS IS A REINSPECTION Cancelled 02/25/2022 03/01/2022// cancelled by super
BLD - BUILDING FINAL 02/25/2022 CANCELLED BY APPLICANT TSTAUFFACHER
Note: Cancelled 02/25/2022
U -UTILITY RESIDENTIAL FINAL 02/25/2022 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 02/24/2022 APPROVED RGROSS
Note: THIS IS A REINSPECTION Left front yard plumbers dug up yard need to fix for drainage After fixed need to resubmit a new final survey to show new drainage
ROW - FINAL INSPECTION 02/24/2022 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 02/24/2022 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 02/15/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: Left front yard plumbers dug up yard need to fix for drainage After fixed need to resubmit a new final survey to show new drainage
FINAL SURVEY (OFFICE USE ONLY) 02/15/2022 APPROVED PFLANAGAN
U-CROSS CONNECTION 02/11/2022 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PRE-APRON (PRE-POUR) 02/07/2022 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION THAT MATERIAL IS NO COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE MATERIAL NEED TO BE MORE COMPACTED ON THE APRON NEED TO ADD FORM BOARD BY THE ROAD TO PREVENT CONCRETE GOING IN TO THE ROAD CULVERT ELEVATION IS GOOD 2/7/22 - A pre pour inspection should be done BEFORE the driveway is poured. Builder is to remove the entire driveway so that it can be properly inspected before pouring. 2/7/22 - After further review this inspection was approved as-noted on 1/12/22 and therefore was inspected before the pre pour. Spoke to CM and Fee was removed. Pre pour generated by the failed inspection was also deleted. Any Questions call Robert 386-793-3980.
ELECTRIC - EARLY POWER 01/18/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:05 am
ROW- PRE-APRON (PRE-POUR) 01/12/2022 APPROVED - AS NOTED GBERTOLA
Note: 01/12/2022=correction were made AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. THAT MATERIAL IS NO COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE MATERIAL NEED TO BE MORE COMPACTED ON THE APRON NEED TO ADD FORM BOARD BY THE ROAD TO PREVENT CONCRETE GOING IN TO THE ROAD
ROW- PRE-APRON (PRE-POUR) 01/11/2022 Disapproved - NO FEE GBERTOLA
Note: THAT MATERIAL IS NO COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE MATERIAL NEED TO BE MORE COMPACTED ON THE APRON NEED TO ADD FORM BOARD BY THE ROAD TO PREVENT CONCRETE GOING IN TO THE ROAD CULVERT ELEVATION IS GOOD
U - SEWER TIE IN 01/05/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 01/05/2022 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 12/09/2021 APPROVED TSTAUFFACHER
PEP TANK INSTALLATION REQUEST 12/01/2021 APPROVED TCHURCHILL
FIREWALL FINAL 11/29/2021 APPROVED RMARTIN
INSULATION 11/22/2021 PARTIALLY APPROVED TSTAUFFACHER
Note: Provide documentation for foam used in top plates
INSULATION 11/22/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Provide documentation for foam used in top plates Documentation provided by insulation company.
ALL ROUGH 11/16/2021 APPROVED TSTAUFFACHER
ROOF VALLEY & METAL 11/12/2021 APPROVED TSTAUFFACHER
FIREWALL DRYWALL NAILING 10/22/2021 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/12/2021 APPROVED TSTAUFFACHER
TIE BEAM / LINTEL 09/17/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Missing down rod on common wall in the back//marked on plans Please get dumpster on site and clean site
TIE BEAM / LINTEL 09/15/2021 Disapproved - NO FEE TSTAUFFACHER
Note: Missing down rod on common wall in the back//marked on plans Please get dumpster on site and clean site
FOUND SURVEY APPROVED (OFFICE) 08/25/2021 APPROVED TBAKER
MONOLITHIC SLAB 07/26/2021 APPROVED TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 07/21/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 06/25/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN HOLD 01/28/2022 01/28/2022
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM CAN NOT SCHEDULE FINAL INSPECTION. PLEASE CONTACT GABRIEL BERTOLA 386-225-3840, TO REMOVE EXTRA 'PRE-POUR INSPECTION'.
BADMIN COMPLETE 01/28/2022 01/28/2022
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/24/2021 08/25/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/24/2021 08/24/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 05/18/2021 05/25/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 05/18/2021 05/24/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 05/18/2021 05/19/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/18/2021 05/18/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/18/2021 05/24/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 05/18/2021 05/19/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/18/2021 05/25/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON COMPLETE 05/18/2021 05/24/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
SWALE COMPLETE 05/18/2021 08/03/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 03/02/2022
STORM WATER PERMIT FEES ¤80.00 05/25/2021
3% TRANS IMPACT FEE CREDIT (¤79.98) 05/25/2021
SEWER CREDIT (¤6,036.54) 05/25/2021
SEWER INSPECTION ¤25.00 05/25/2021
SEWER CAPITAL FACILITY ¤9,329.10 05/25/2021
WATER CAPITAL FACILITY FEE ¤6,848.90 05/25/2021
METER - DEPOSIT ¤120.00 05/25/2021
WATER- TURN ON ¤50.00 05/25/2021
ADMIN FEE ¤20.00 05/25/2021
CONNECTION FEES ¤2,035.66 05/25/2021
BUILDING DISCOUNT 100% (¤1,472.60) 05/25/2021
ELECTRIC FEE ¤241.80 05/25/2021
3% FIRE IMPACT FEE CREDIT (¤22.02) 05/25/2021
IMPACT FEE FIRE ¤734.00 05/25/2021
IMPACT FEE PARKS ¤2,398.24 05/25/2021
IMPACT FEE SCHOOL ¤7,200.00 05/25/2021
IMPACT FEE TRANSPORTATION ¤2,666.00 05/25/2021
MECHANICAL FEE ¤241.80 05/25/2021
WATER -IRRIGATION INSPECTION ¤50.00 05/25/2021
3% PARKS IMPACT FEE CREDIT (¤71.95) 05/25/2021
PLAN CHECK FEE ¤121.20 05/25/2021
PLUMBING FEE ¤241.80 05/25/2021
NEW RESIDENTIAL INSPECTIONS ¤606.00 05/25/2021
SITE PLAN 20 ¤20.00 05/25/2021
SURCHARGE FS 533.721 ¤2.00 05/25/2021
SURCHARGE - FS 468.631 ¤2.00 05/25/2021
Fees Total Due: ¤0.00 Total Paid: ¤25,370.41