I want to search for...
Permit #2021051146
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00730-0100 |
| CONDITIONED SPACE: 1198 sqft |
| CONDITIONED SPACE: 1198 sqft |
| GARAGE: 330 sqft |
| GARAGE: 330 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| OPENED PORCH (WITH ROOF) : 30 sqft |
| OPENED PORCH (WITH ROOF) : 30 sqft |
| Total Square Footage: 3298 sqft |
| Block: 00730 |
| Subdivision: - |
| Job Phone: (386) 246-6123 |
| Location Address: 8 SLEEPY HOLLOW TR |
| Type: DU - DUPLEX |
| Issue Date: 05/25/2021 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: ZUKERMAN MICHAEL NATALIE H&W |
|
Address 3106 S WOODALL DR SOLON, OH 44139 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤282,480.00 |
| Job Description: Duplex residential |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/02/2022 | FINAL APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Cancelled 02/25/2022 03/01/2022// cancelled by super | |||
| BLD - BUILDING FINAL | 03/01/2022 | CANCELLED BY APPLICANT | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Cancelled 02/25/2022 03/01/2022// cancelled by super | |||
| BLD - BUILDING FINAL | 02/25/2022 | CANCELLED BY APPLICANT | TSTAUFFACHER |
| Note: Cancelled 02/25/2022 | |||
| U -UTILITY RESIDENTIAL FINAL | 02/25/2022 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/24/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION Left front yard plumbers dug up yard need to fix for drainage After fixed need to resubmit a new final survey to show new drainage | |||
| ROW - FINAL INSPECTION | 02/24/2022 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 02/24/2022 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/15/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: Left front yard plumbers dug up yard need to fix for drainage After fixed need to resubmit a new final survey to show new drainage | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/15/2022 | APPROVED | PFLANAGAN |
| U-CROSS CONNECTION | 02/11/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/07/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION THAT MATERIAL IS NO COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE MATERIAL NEED TO BE MORE COMPACTED ON THE APRON NEED TO ADD FORM BOARD BY THE ROAD TO PREVENT CONCRETE GOING IN TO THE ROAD CULVERT ELEVATION IS GOOD 2/7/22 - A pre pour inspection should be done BEFORE the driveway is poured. Builder is to remove the entire driveway so that it can be properly inspected before pouring. 2/7/22 - After further review this inspection was approved as-noted on 1/12/22 and therefore was inspected before the pre pour. Spoke to CM and Fee was removed. Pre pour generated by the failed inspection was also deleted. Any Questions call Robert 386-793-3980. | |||
| ELECTRIC - EARLY POWER | 01/18/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:05 am | |||
| ROW- PRE-APRON (PRE-POUR) | 01/12/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: 01/12/2022=correction were made AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. THAT MATERIAL IS NO COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE MATERIAL NEED TO BE MORE COMPACTED ON THE APRON NEED TO ADD FORM BOARD BY THE ROAD TO PREVENT CONCRETE GOING IN TO THE ROAD | |||
| ROW- PRE-APRON (PRE-POUR) | 01/11/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: THAT MATERIAL IS NO COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE MATERIAL NEED TO BE MORE COMPACTED ON THE APRON NEED TO ADD FORM BOARD BY THE ROAD TO PREVENT CONCRETE GOING IN TO THE ROAD CULVERT ELEVATION IS GOOD | |||
| U - SEWER TIE IN | 01/05/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/05/2022 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 12/09/2021 | APPROVED | TSTAUFFACHER |
| PEP TANK INSTALLATION REQUEST | 12/01/2021 | APPROVED | TCHURCHILL |
| FIREWALL FINAL | 11/29/2021 | APPROVED | RMARTIN |
| INSULATION | 11/22/2021 | PARTIALLY APPROVED | TSTAUFFACHER |
| Note: Provide documentation for foam used in top plates | |||
| INSULATION | 11/22/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Provide documentation for foam used in top plates Documentation provided by insulation company. | |||
| ALL ROUGH | 11/16/2021 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 11/12/2021 | APPROVED | TSTAUFFACHER |
| FIREWALL DRYWALL NAILING | 10/22/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/12/2021 | APPROVED | TSTAUFFACHER |
| TIE BEAM / LINTEL | 09/17/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Missing down rod on common wall in the back//marked on plans Please get dumpster on site and clean site | |||
| TIE BEAM / LINTEL | 09/15/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Missing down rod on common wall in the back//marked on plans Please get dumpster on site and clean site | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/25/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/26/2021 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/21/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 06/25/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | HOLD | 01/28/2022 | 01/28/2022 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM CAN NOT SCHEDULE FINAL INSPECTION. PLEASE CONTACT GABRIEL BERTOLA 386-225-3840, TO REMOVE EXTRA 'PRE-POUR INSPECTION'. | |||
| BADMIN | COMPLETE | 01/28/2022 | 01/28/2022 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/24/2021 | 08/25/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/24/2021 | 08/24/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/18/2021 | 05/25/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/18/2021 | 05/24/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/18/2021 | 05/19/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/18/2021 | 05/18/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/18/2021 | 05/24/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/18/2021 | 05/19/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/18/2021 | 05/25/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/18/2021 | 05/24/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| SWALE | COMPLETE | 05/18/2021 | 08/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/02/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/25/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤79.98) | 05/25/2021 |
| SEWER CREDIT | (¤6,036.54) | 05/25/2021 |
| SEWER INSPECTION | ¤25.00 | 05/25/2021 |
| SEWER CAPITAL FACILITY | ¤9,329.10 | 05/25/2021 |
| WATER CAPITAL FACILITY FEE | ¤6,848.90 | 05/25/2021 |
| METER - DEPOSIT | ¤120.00 | 05/25/2021 |
| WATER- TURN ON | ¤50.00 | 05/25/2021 |
| ADMIN FEE | ¤20.00 | 05/25/2021 |
| CONNECTION FEES | ¤2,035.66 | 05/25/2021 |
| BUILDING DISCOUNT 100% | (¤1,472.60) | 05/25/2021 |
| ELECTRIC FEE | ¤241.80 | 05/25/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 05/25/2021 |
| IMPACT FEE FIRE | ¤734.00 | 05/25/2021 |
| IMPACT FEE PARKS | ¤2,398.24 | 05/25/2021 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 05/25/2021 |
| IMPACT FEE TRANSPORTATION | ¤2,666.00 | 05/25/2021 |
| MECHANICAL FEE | ¤241.80 | 05/25/2021 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 05/25/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 05/25/2021 |
| PLAN CHECK FEE | ¤121.20 | 05/25/2021 |
| PLUMBING FEE | ¤241.80 | 05/25/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤606.00 | 05/25/2021 |
| SITE PLAN 20 | ¤20.00 | 05/25/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/25/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/25/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤25,370.41 |