Permit #2021051215

Permit Details

Status: COED

Parcel Id: 48-11-31-1710-00000-0760
CONDITIONED SPACE: 3212 sqft
GARAGE: 978 sqft
GARAGE: 614 sqft
OPENED PORCH (WITH ROOF) : 542 sqft
OPENED PORCH (WITH ROOF) : 84 sqft
Total Square Footage: 5430 sqft
Block: 00000
Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II
Job Phone: 386-445-2012
Location Address: 5 SCARLET OAK CIR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/01/2021
NOC: RECORDED
Applicant name: JOHN NICHOLAS CORDASCI
Owner: HARRISON PHILIP WAYNE & ROCHELE H&W

Address

8 SCARLET CIRCLE

PALM COAST, FL 32137

Lot: 0760
Contracted Stated Job Value: ¤596,047.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SKYWAY BUILDERS INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 354786

PALM COAST, FL 32135

CBC1263769 (Exp: 08/31/2024) 386-445-2012

Sub Contractors

THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
THELMA JOANNA SAMS
Status Location Address State License Number Phone
ACTIVE

8222 S. ORANGE AVE

CRESCENT CITY, FL 32112

LQ24872 (Exp: 09/16/2027) 407-855-1903

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/23/2022 FINAL APPROVED LMILLER
U-CROSS CONNECTION 06/22/2022 APPROVED - AS NOTED LFITZGERALD
Note: has re-claim irrigation-no cross connection
U -UTILITY RESIDENTIAL FINAL 06/22/2022 APPROVED - AS NOTED LFITZGERALD
Note: Moving forward please just tie into the 6in sewer lateral and utilize the 6 in. clean out-the 4in is not needed, thank you
GAS ROUGH 06/22/2022 APPROVED MGIBSON
Note: THIS IS A REINSPECTION ANOTHEE GAS ROUGH WILL BE REQUIRED WHEN LINE IS RAN FROM TANK TO HOUSE STUB OUT
GAS FINAL 06/22/2022 APPROVED MGIBSON
FINAL SURVEY (OFFICE USE ONLY) 06/21/2022 APPROVED PFLANAGAN
ROW - FINAL APRON (AFTER POUR) 06/21/2022 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 06/21/2022 APPROVED PFLANAGAN
ROW - STORMWATER FINAL 06/21/2022 APPROVED - AS NOTED PFLANAGAN
Note: LOOKS GOOD AT TIME OF INSPECTION
ROW- PRE-APRON (PRE-POUR) 05/23/2022 APPROVED GBERTOLA
ROW- PAVER RESTRAINTS 04/21/2022 APPROVED RGROSS
U - SEWER TIE IN 04/14/2022 APPROVED LMILLER
Note: THIS IS A REINSPECTION tie in is covered with water, (need to be able to see connection) 4-14-22 notes above resolved
U - SEWER TIE IN 04/13/2022 Disapproved - NO FEE LMILLER
Note: tie in is covered with water, (need to be able to see connection)
GRAVITY SEWER TEST 04/13/2022 APPROVED LMILLER
ELECTRIC - EARLY POWER 01/13/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:35 am
LATH/BRICK/ WATER BARRIER 11/04/2021 APPROVED TSTAUFFACHER
INSULATION 11/04/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION need to place nail plates at low voltage (ran after allrough or framing placed after allrough)
INSULATION 11/02/2021 Disapproved - NO FEE LMILLER
Note: need to place nail plates at low voltage (ran after allrough or framing placed after allrough)
GAS ROUGH 10/22/2021 PARTIALLY APPROVED MGIBSON
Note: ANOTHEE GAS ROUGH WILL BE REQUIRED WHEN LINE IS RAN FROM TANK TO HOUSE STUB OUT
ALL ROUGH 10/18/2021 APPROVED LMILLER
Note: THIS IS A REINSPECTION Inspection stopped, roof not complete (still laying shingles), walked into garage on left side Wiring not complete. (nothing further looked at. 10-18-21... notes above resolved
ALL ROUGH 10/12/2021 Disapproved -FEE REQUIRED LMILLER
Note: Inspection stopped, roof not complete (still laying shingles), walked into garage on left side Wiring not complete. (nothing further looked at.
ROOF VALLEY & METAL 09/07/2021 APPROVED LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION maximum spacing 12 inches in between rows exceeded 8-31-21... notes above NOT resolved 9-7-21... notes aboved resolved
ROOF VALLEY & METAL 08/31/2021 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION maximum spacing 12 inches in between rows exceeded 8-31-21... notes above NOT resolved
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/31/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION 1. missing SP4 kings for Continuous load path… R301,2.1 8-31-21... notes above reolved
ROOF VALLEY & METAL 08/20/2021 Disapproved - NO FEE WMILLER
Note: maximum spacing 12 inches in between rows exceeded
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/20/2021 Disapproved - NO FEE WMILLER
Note: 1. missing SP4 kings for Continuous load path… R301,2.1
ELECTRIC-TUG 08/12/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 3:00
TIE BEAM / LINTEL 07/27/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION 1. Clearance from masonry FBC, R606.3.4 minimum wall reinforcing steel coverage not met (.75 inch) 2. need to drill and epoxy (verticle missing) all marked with orange, some inside some outside 7-27-21... notes above resolved
TIE BEAM / LINTEL 07/26/2021 Disapproved -FEE REQUIRED WMILLER
Note: 1. Clearance from masonry FBC, R606.3.4 minimum wall reinforcing steel coverage not met (.75 inch) 2. need to drill and epoxy (verticle missing) all marked with orange, some inside some outside
FOUND SURVEY APPROVED (OFFICE) 07/16/2021 APPROVED TBAKER
MONOLITHIC SLAB 06/30/2021 APPROVED WMILLER
PLUMBING 1ST ROUGH UNDERGROUND 06/24/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 06/02/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 06/22/2022 06/22/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/16/2021 07/16/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/16/2021 07/16/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 05/26/2021 05/27/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
ELEC COMPLETE 05/26/2021 06/01/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 05/26/2021 05/28/2021
Note: Released By: JPI
URB COMPLETE 05/25/2021 05/26/2021
Note: Released By: JOHN BEAUDET - (386)986-2456 -
PLFM COMPLETE 05/25/2021 05/25/2021
Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 5/19/2021, the structure will fall outside of the Special Flood Hazard Area. No elevation certificates will be required.
BLD HOLD 05/19/2021 05/23/2021
Note: Held By: JPI 1. Per Table R803.2.1, nailing pattern for Exposure C should be no less than 6” at edges and in the field.
CUSVC COMPLETE 05/19/2021 05/24/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 05/19/2021 05/20/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Electric load calcs do not match the square footage of the house. Need outlets in bathroom 2 and 3. NEC 2017 210.52
ENGIN1 COMPLETE 05/19/2021 05/19/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/19/2021 05/24/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 05/19/2021 05/21/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/19/2021 05/26/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 05/19/2021 05/25/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Need to correct the legal description on the site plan. (Map book and page - it is correct on the survey)

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 06/23/2022
REINSPECTION RESIDENTIAL ¤40.00 06/23/2022
REINSPECTION RESIDENTIAL ¤40.00 06/23/2022
CONTRACTOR CHANGE ¤40.00 06/23/2022
REINSPECTION FEE ¤40.00 06/23/2022
NEW RESIDENTIAL INSPECTIONS ¤1,194.00 06/01/2021
SITE PLAN 20 ¤20.00 06/01/2021
SURCHARGE FS 533.721 ¤2.00 06/01/2021
SURCHARGE - FS 468.631 ¤2.00 06/01/2021
STORM WATER PERMIT FEES ¤80.00 06/01/2021
3% TRANS IMPACT FEE CREDIT (¤94.17) 06/01/2021
SEWER INSPECTION ¤25.00 06/01/2021
BUILDING DISCOUNT 100% (¤2,707.40) 06/01/2021
ELECTRIC FEE ¤418.20 06/01/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 06/01/2021
IMPACT FEE FIRE ¤367.00 06/01/2021
IMPACT FEE PARKS ¤1,199.12 06/01/2021
IMPACT FEE SCHOOL ¤3,600.00 06/01/2021
IMPACT FEE TRANSPORTATION ¤3,139.00 06/01/2021
MECHANICAL FEE ¤418.20 06/01/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 06/01/2021
PLAN CHECK FEE ¤238.80 06/01/2021
PLUMBING FEE ¤418.20 06/01/2021
CONNECTION FEES ¤25.00 06/01/2021
METER - DEPOSIT ¤60.00 06/01/2021
WATER-METER ¤441.07 06/01/2021
WATER-METER ¤366.42 06/01/2021
ADMIN FEE ¤20.00 06/01/2021
Fees Total Due: ¤0.00 Total Paid: ¤9,377.96