I want to search for...
Permit #2021051326
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00090-0080 |
| CONDITIONED SPACE: 1840 sqft |
| GARAGE: 674 sqft |
| OPENED PORCH (WITH ROOF) : 162 sqft |
| OPENED PORCH (WITH ROOF) : 47 sqft |
| Total Square Footage: 2723 sqft |
| Block: 00090 |
| Subdivision: 2123 - SECTION 57-ULYSSES TREES |
| Job Phone: 386-445-3405 |
| Location Address: 40 UTAH PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/07/2021 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: BLUE WATER HOMES INC |
|
Address STE #1 PALM COAST, FL 32137 |
|
Address 4881 PALM COAST PKWY NW PALM COAST, FL 32137 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤205,436.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 03/29/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: Looks good at time of inspection Finished grade along the fenceline was not below the fenceline. CM was on site and began to dig dirt away from the fence. Inspector could not wait long enough to see the end product. | |||
| BLD - BUILDING FINAL | 03/25/2022 | FINAL APPROVED | TSTAUFFACHER |
| U-CROSS CONNECTION | 03/24/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/24/2022 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 03/24/2022 | Disapproved - NO FEE | RGROSS |
| Note: Finished grade along the fenceline was not below the fenceline. CM was on site and began to dig dirt away from the fence. Inspector could not wait long enough to see the end product. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/22/2022 | APPROVED | PFLANAGAN |
| ROW - FINAL APRON (AFTER POUR) | 03/22/2022 | APPROVED | PFLANAGAN |
| FINAL SURVEY (OFFICE USE ONLY) | 03/22/2022 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 02/04/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:11 am | |||
| ROW- PRE-APRON (PRE-POUR) | 02/03/2022 | APPROVED | RGROSS |
| U - SEWER TIE IN | 01/19/2022 | APPROVED | MGIBSON |
| INSULATION | 11/19/2021 | APPROVED | TSTAUFFACHER |
| LATH/BRICK/ WATER BARRIER | 11/17/2021 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 11/10/2021 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 10/19/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/13/2021 | APPROVED | TSTAUFFACHER |
| TIE BEAM / LINTEL | 08/26/2021 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 08/20/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/11/2021 | APPROVED | PBUCKLEY |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/06/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 08/06/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/20/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/24/2022 | 03/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/04/2021 | 11/10/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. Architects letter calls for a stud to be added. Provide what size stud is to me installed as well attached to top plate. 2. Blocking under truss. Provide size of blocking, spacing and attachment method for block. 3. As mentioned, provide what size stud is to me installed as well attached to truss. | |||
| BLD | HOLD | 10/29/2021 | 11/01/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. Architects letter calls for a stud to be added. Provide what size stud is to me installed as well attached to top plate. 2. Blocking under truss. Provide size of blocking, spacing and attachment method for block. 3. As mentioned, provide what size stud is to me installed as well attached to truss. | |||
| ENGIN1 | COMPLETE | 08/20/2021 | 08/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/20/2021 | 08/20/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/07/2021 | 06/07/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/28/2021 | 06/01/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| ENGIN1 | COMPLETE | 05/28/2021 | 06/01/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/20/2021 | 05/23/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/20/2021 | 05/24/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/20/2021 | 05/24/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/20/2021 | 05/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/20/2021 | 05/28/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/20/2021 | 05/21/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/20/2021 | 05/26/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/20/2021 | 05/26/2021 |
| Note: Held By: ESTELLE LENS - (386)986-3751 - The parcel falls slightly in the FEMA map panel number ...0231E. Please add that to the site plan notes. Four shrubs are required on the left side of the residence. The LRV for Pure White is 84, not 42. Please correct. | |||
| SWALE | COMPLETE | 05/20/2021 | 08/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 03/28/2022 |
| BUILDING DISCOUNT 100% | (¤1,212.20) | 06/07/2021 |
| ELECTRIC FEE | ¤204.60 | 06/07/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/07/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/07/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/07/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/07/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/07/2021 |
| MECHANICAL FEE | ¤204.60 | 06/07/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/07/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/07/2021 |
| PLAN CHECK FEE | ¤96.40 | 06/07/2021 |
| PLUMBING FEE | ¤204.60 | 06/07/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤482.00 | 06/07/2021 |
| SITE PLAN 20 | ¤20.00 | 06/07/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/07/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/07/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/07/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/07/2021 |
| SEWER CREDIT | (¤2,465.75) | 06/07/2021 |
| SEWER INSPECTION | ¤25.00 | 06/07/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/07/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/07/2021 |
| METER - DEPOSIT | ¤60.00 | 06/07/2021 |
| WATER- TURN ON | ¤25.00 | 06/07/2021 |
| ADMIN FEE | ¤20.00 | 06/07/2021 |
| CONNECTION FEES | ¤1,017.83 | 06/07/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,705.68 |