I want to search for...
Permit #2021051497
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00870-0130 |
| CONDITIONED SPACE: 1215 sqft |
| CONDITIONED SPACE: 1215 sqft |
| GARAGE: 280 sqft |
| GARAGE: 280 sqft |
| OPENED PORCH (WITH ROOF) : 118 sqft |
| OPENED PORCH (WITH ROOF) : 118 sqft |
| GARAGE: 22 sqft |
| OPENED PORCH (WITH ROOF) : 22 sqft |
| Total Square Footage: 3270 sqft |
| Block: 00870 |
| Subdivision: 2123 - SECTION 57-ULYSSES TREES |
| Job Phone: 863-845-6967 |
| Location Address: 37 ULLMAN PL |
| Type: DU - DUPLEX |
| Issue Date: 02/01/2022 |
| NOC: RECORDED |
| Applicant name: LARRY SHERWIN THOMPSON |
| Owner: CARPENTER COMPANIES FLORIDA LLC |
|
Address SUITE 116 TAMPA, FL 33606 |
|
Address 142 WEST PLATT STREET TAMPA, FL 33606 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
THOMCO OF FLORIDA LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
6381 ROBERTS RD KATHLEEN, FL 33849 |
CGC1513647 (Exp: 08/31/2024) | 863-845-6967 |
Sub Contractors
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/07/2022 | FINAL APPROVED | BTAYLOR |
| ROW - FINAL INSPECTION | 12/07/2022 | FINAL APPROVED | PFLANAGAN |
| Note: 12/6/2022 - PREVIOUS INSPECTION NOTES Note to Inspector: There is a water valve in the center of the swale near the invert of the pipe. This is a main valve that could not be moved per the water dept. Inspect as normal and disregard the valve as-is. Any questions call Robert 386-793-3980 | |||
| U -UTILITY RESIDENTIAL FINAL | 12/07/2022 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/06/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/06/2022 | APPROVED | PFLANAGAN |
| ROW - FINAL INSPECTION | 12/06/2022 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: Note to Inspector: There is a water valve in the center of the swale near the invert of the pipe. This is a main valve that could not be moved per the water dept. Inspect as normal and disregard the valve as-is. Any questions call Robert 386-793-3980 | |||
| ROW - FINAL APRON (AFTER POUR) | 12/06/2022 | APPROVED | PFLANAGAN |
| Note: Note to Inspector: There is a water valve in the center of the swale near the invert of the pipe. This is a main valve that could not be moved per the water dept. Inspect as normal and disregard the valve as-is. Any questions call Robert 386-793-3980 | |||
| U-CROSS CONNECTION | 12/05/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. 12/2/2022 - PREVIOUS INSPECTION NOTES irrigation not yet installed-has irrigation meters to be connected yet | |||
| U-CROSS CONNECTION | 12/02/2022 | Disapproved - NO FEE | LFITZGERALD |
| Note: irrigation not yet installed-has irrigation meters to be connected yet | |||
| ELECTRIC - EARLY POWER | 11/30/2022 | APPROVED | BTAYLOR |
| ROW- PRE-APRON (PRE-POUR) | 11/30/2022 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR THE DRIVEWAY -------------------------------------------------------------------------------------------- Note to Inspector: There is a water valve in the center of the swale near the invert of the pipe. This is a main valve that could not be moved per the water dept. Inspect as normal and disregard the valve as-is. Any questions call Robert 386-793-3980 11/23/2022 - PREVIOUS INSPECTION NOTES NEED A 22.5 degree elbow required TOO WET ALSO | |||
| ROW- PROJECT STATUS | 11/28/2022 | APPROVED | PFLANAGAN |
| Note: NEED TO HAVE THE UTILITYS MOVE THE WATER METER | |||
| ROW- PRE-APRON (PRE-POUR) | 11/23/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: NEED A 22.5 degree elbow required TOO WET ALSO | |||
| ROW- PRE-APRON (PRE-POUR) | 11/21/2022 | CANCELLED BY APPLICANT | WEB |
| GRAVITY SEWER TEST | 11/17/2022 | APPROVED | BTAYLOR |
| U - SEWER TIE IN | 11/17/2022 | APPROVED | BTAYLOR |
| INSULATION | 10/13/2022 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 10/2/2022 1:16:08 PM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd and been rescheduled to October 4th. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 10-7-22 1. No water pressure. | |||
| ALL ROUGH | 10/07/2022 | APPROVED - AS NOTED | BTAYLOR |
| Note: 10/2/2022 1:16:08 PM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd and been rescheduled to October 4th. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 10-7-22 1. No water pressure. | |||
| FIREWALL FINAL | 10/05/2022 | APPROVED | BTAYLOR |
| ALL ROUGH | 10/03/2022 | CANCELLED BY APPLICANT | BBEMBRY |
| Note: Inspections requested for October 3rd and been rescheduled to October 4th. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. | |||
| FIREWALL DRYWALL NAILING | 09/22/2022 | APPROVED | BTAYLOR |
| Note: 9/15/2022 - PREVIOUS INSPECTION NOTES 9-15-22 1.Bottom cord not screwed off. | |||
| FIREWALL DRYWALL NAILING | 09/15/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: 9-15-22 1.Bottom cord not screwed off. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/06/2022 | APPROVED | BTAYLOR |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Left side unit/ on back lanai, shiners exposed and sheathing loose. Also, please provide plans for all inspections. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 8-11-22 1. Straps missing 2. Gable truss not strapped down. 3. Need paperwork stating that bracket for double truss is alright to use 4. Engineering not complete. Areas circled 6-28-22 Shiners still showing in area mentioned above and still missing documents 107.3,1 07/12/2022: Roof decking is approved, okay to cover with underlayment and shingles/ call back in for tie down and truss engineering inspection 8-24-22 1. Gable truss not strapped down. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/24/2022 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Left side unit/ on back lanai, shiners exposed and sheathing loose. Also, please provide plans for all inspections. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 8-11-22 1. Straps missing 2. Gable truss not strapped down. 3. Need paperwork stating that bracket for double truss is alright to use 4. Engineering not complete. Areas circled 6-28-22 Shiners still showing in area mentioned above and still missing documents 107.3,1 07/12/2022: Roof decking is approved, okay to cover with underlayment and shingles/ call back in for tie down and truss engineering inspection 8-24-22 1. Gable truss not strapped down. | |||
| LATH/BRICK/ WATER BARRIER | 08/22/2022 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 08/12/2022 | APPROVED | BTAYLOR |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION not installed 8-11-22 1. No metal flashing on right side entry way. | |||
| ROOF VALLEY & METAL | 08/11/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: THIS IS A REINSPECTION not installed 8-11-22 1. No metal flashing on right side entry way. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/11/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Left side unit/ on back lanai, shiners exposed and sheathing loose. Also, please provide plans for all inspections. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 8-11-22 1. Straps missing 2. Gable truss not strapped down. 3. Need paperwork stating that bracket for double truss is alright to use 4. Engineering not complete. Areas circled 6-28-22 Shiners still showing in area mentioned above and still missing documents 107.3,1 07/12/2022: Roof decking is approved, okay to cover with underlayment and shingles/ call back in for tie down and truss engineering inspection | |||
| ROOF VALLEY & METAL | 07/26/2022 | Disapproved - NO FEE | RMARTIN |
| Note: not installed | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/12/2022 | PARTIALLY APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Left side unit/ on back lanai, shiners exposed and sheathing loose. Also, please provide plans for all inspections. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 6-28-22 Shiners still showing in area mentioned above and still missing documents 107.3,1 07/12/2022: Roof decking is approved, okay to cover with underlayment and shingles/ call back in for tie down and truss engineering inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/28/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION Left side unit/ on back lanai, shiners exposed and sheathing loose. Also, please provide plans for all inspections. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 6-28-22 Shiners still showing in area mentioned above and still missing documents 107.3,1 | |||
| WALL SHEATHING | 06/28/2022 | APPROVED | LMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/22/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Left side unit/ on back lanai, shiners exposed and sheathing loose. Also, please provide plans for all inspections. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL | |||
| TIE BEAM / LINTEL | 05/16/2022 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Trusses not stored per SBCA guidelines. Provide letter from engineer confirming integrity of trusses prior to placement | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/11/2022 | APPROVED | AMOBLEY |
| FOOTER | 04/27/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 04/26/2022: Still working on foortings, call back in when ready | |||
| FOOTER | 04/26/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION 04/26/2022: Still working on foortings, call back in when ready | |||
| FOOTER | 04/25/2022 | CANCELLED BY APPLICANT | TSTAUFFACHER |
| WATER METER INSTALLATION REQUEST | 04/19/2022 | APPROVED | CSTONE |
| MONOLITHIC SLAB | 04/14/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Approved inspector plans not complete Electical ground not installed No pressure on water supply lines Island chase not installed Trusses not stored per SBCA guidelines. Provide letter from engineer confirming integrity of trusses prior to placement 4.13.22 - Caved in particularly @ column pads, will not achieve concrete coverage of steel No Termite Cert. on site | |||
| MONOLITHIC SLAB | 04/13/2022 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: THIS IS A REINSPECTION Approved inspector plans not complete Electical ground not installed No pressure on water supply lines Island chase not installed Trusses not stored per SBCA guidelines. Provide letter from engineer confirming integrity of trusses prior to placement 4.13.22 - Caved in particularly @ column pads, will not achieve concrete coverage of steel No Termite Cert. on site | |||
| MONOLITHIC SLAB | 04/07/2022 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Approved inspector plans not complete Electical ground not installed No pressure on water supply lines Island chase not installed Trusses not stored per SBCA guidelines. Provide letter from engineer confirming integrity of trusses prior to placement | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/01/2022 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/11/2022 | 05/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/11/2022 | 05/11/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/13/2022 | 04/13/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/09/2022 | 02/16/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ZON | COMPLETE | 09/29/2021 | 10/04/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/29/2021 | 09/29/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/29/2021 | 10/06/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/22/2021 | 09/23/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Please fix the legal description on the survey and site plan. (It is missing the Section number - 57) Please provide the width of walkways on the site plan. The landscape plan must be for the house being built. You have to correct the site plan and survey to provide the information requested above and then the landscape plan must match – the driveway will have to be adjusted on the site plan and the landscape plan. The A/C pads are in the rear on the site plan and on the side on the floor plan. All must match. | |||
| ENGIN1 | COMPLETE | 09/22/2021 | 09/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/22/2021 | 09/29/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/08/2021 | 09/09/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/08/2021 | 09/08/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENTS: Please fix the legal description on the survey and site plan. (It is missing the Section number - 57) The driveway must be a minimum of 16' wide for each unit to total 32’. Please provide the width of walkways on the site plan. The landscape plan must be for the house being built. You have to correct the site plan and survey to provide the information requested above and then the landscape plan must match – the driveway will have to be adjusted on the site plan and the landscape plan. The A/C pads are in the rear on the site plan and on the side on the floor plan. All must match. Please provide the exterior material (stucco) where requested on the color sheet. | |||
| ENGIN1 | COMPLETE | 09/08/2021 | 09/08/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/08/2021 | 09/15/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/19/2021 | 08/19/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 08/19/2021 | 08/19/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM List all sub contractors. 2nd request | |||
| ENGIN1 | COMPLETE | 08/19/2021 | 08/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/19/2021 | 08/20/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENTS: Please fix the legal description on the survey and site plan. (It is missing the Section number.) The driveway must be a minimum of 16' wide for each unit to total 32’. Please provide the width of walkways on the site plan. The landscape plan is for a single family residence. This permit is for a duplex. Please upload the correct landscape plan. ( A minimum of 16 foundation plantings are required: 8 across the front and 4 on each side. At least 4 credit trees, including one shade tree, are required for this site. Pine trees are not credit trees.) The A/C pads are in the rear on the site plan and on the side on the floor plan. All must match. Please provide the exterior material (stucco) where requested on the color sheet. | |||
| BLD | COMPLETE | 08/19/2021 | 08/19/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 08/19/2021 | 08/26/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/24/2021 | 08/25/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/24/2021 | 05/31/2021 |
| Note: Held By: JPI 1. Sections A and B on page S-2A both reference GA File ASW 1002 for separation above block wall. However, file provided on same page is ASW 0810. Please clarify which is appropriate and correct to match. 2. Correct sheet numbering. Foundation and floor plan both labelled page 2. 3. Product Approval Spec Sheet provided, and Product Approval #’s provided on drawings, page PA. Numbers do not match for multiple products. Please review and provide matching numbers or eliminate one. 4. Page 6, roof framing plan indicates incorrect section through rated partition. Floor plan, page 2, indicates Section B with curb. | |||
| CUSVC | COMPLETE | 05/24/2021 | 05/26/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 05/24/2021 | 05/25/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM List all sub contractors. | |||
| ENGIN1 | HOLD | 05/24/2021 | 05/26/2021 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Site plan elevations are off by approx. 1.50' per as-built drawings; please revise. The road name on the site plan is incorrect; please revise | |||
| LOCATE | COMPLETE | 05/24/2021 | 06/09/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/24/2021 | 05/25/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs and heatload for both sides of duplex. | |||
| SW1 | COMPLETE | 05/24/2021 | 06/01/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/24/2021 | 05/27/2021 |
| Note: Held By: ESTELLE LENS - (386)986-3751 - Please fix the legal description on the survey and site plan. (It is missing the Section number.) The driveways must be a minimum of 16' wide for at least 20 feet from the garage doors. Please provide the material of the driveways and the width and material of the walkways on the site plan. The landscape plan is for a single family residence. This permit is for a duplex. Please upload the correct landscape plan. ( A minimum of 16 foundation plantings are required: 8 across the front and 4 on each side. At least 4 credit trees, including one shade tree, are required for this site. Pine trees are not credit trees.) The A/C pads are in the rear on the site plan and on the side on the floor plan. All must match. Please provide the exterior material (stucco) where requested on the color sheet. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 12/07/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/07/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/07/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/07/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/07/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 12/07/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 12/07/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/07/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/16/2022 |
| CONNECTION FEES | ¤1,077.88 | 02/16/2022 |
| METER - DEPOSIT | ¤60.00 | 02/16/2022 |
| WATER- TURN ON | ¤25.00 | 02/16/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 02/16/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 02/16/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 02/01/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 02/01/2022 |
| WATER- TURN ON | ¤25.00 | 02/01/2022 |
| WATER- TURN ON | ¤25.00 | 02/01/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 02/01/2022 |
| INSPECTION- ELECTRICAL | ¤242.40 | 02/01/2022 |
| INSPECTION - MECHANICAL | ¤242.40 | 02/01/2022 |
| INSPECTION - PLUMBING | ¤242.40 | 02/01/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤121.60 | 02/01/2022 |
| WATER-METER | ¤467.09 | 02/01/2022 |
| METER - DEPOSIT | ¤60.00 | 02/01/2022 |
| METER - DEPOSIT | ¤60.00 | 02/01/2022 |
| CONNECTION FEES | ¤1,077.88 | 02/01/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 02/01/2022 |
| NEW RESIDENTIAL INSPECTIONS | ¤608.00 | 02/01/2022 |
| SITE PLAN 20 | ¤20.00 | 02/01/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/01/2022 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/01/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/01/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤79.98) | 02/01/2022 |
| SEWER CREDIT | (¤1,806.00) | 02/01/2022 |
| SEWER INSPECTION | ¤25.00 | 02/01/2022 |
| BUILDING DISCOUNT 100% | (¤1,476.80) | 02/01/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 02/01/2022 |
| IMPACT FEE FIRE | ¤734.00 | 02/01/2022 |
| IMPACT FEE PARKS | ¤2,398.24 | 02/01/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 02/01/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,666.00 | 02/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/01/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤31,495.16 |