Permit #2021051506

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00290-0060
CONDITIONED SPACE: 1215 sqft
CONDITIONED SPACE: 1215 sqft
GARAGE: 280 sqft
GARAGE: 280 sqft
OPENED PORCH (WITH ROOF) : 118 sqft
OPENED PORCH (WITH ROOF) : 118 sqft
OPENED PORCH (WITH ROOF) : 22 sqft
OPENED PORCH (WITH ROOF) : 22 sqft
Total Square Footage: 3270 sqft
Block: 00290
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 863-845-6967
Location Address: 8 SERENADE PL
Type: DU - DUPLEX
Issue Date: 12/29/2021
NOC: RECORDED
Applicant name: LARRY SHERWIN THOMPSON
Owner: CARPENTER COMPANIES FLORIDA LLC

Address

142 W PLANT ST, STE 116

TAMPA, FL 33606

Lot: 0060
Contracted Stated Job Value: ¤150,000.00
Job Description: DUPLEX
Type: CN

Contractor

THOMCO OF FLORIDA LLC
Status Location Address State License Number Phone
INACTIVE

6381 ROBERTS RD

KATHLEEN, FL 33849

CGC1513647 (Exp: 08/31/2024) 863-845-6967

Sub Contractors

JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/22/2022 FINAL APPROVED RMARTIN
U -UTILITY RESIDENTIAL FINAL 12/22/2022 FINAL APPROVED JHARDING
ROW - FINAL INSPECTION 12/21/2022 Disapproved - NO FEE GBERTOLA
Note: 12/21/22= NEED HOT PATCH ON THE ROAD ______________________________________________________________________________________________________________ 12/20/2022 - PREVIOUS INSPECTION NOTES 12/19/2022 - PREVIOUS INSPECTION NOTES CANT PASS AS NOTED ASPHALT PATCH NEEDS TO BE DONE BEFORE ROW FINAL WILL PASS ------------------------------------------------------------------- 12/16/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE ASPHALT PATCH DONE
ROW - FINAL INSPECTION 12/21/2022 APPROVED GBERTOLA
Note: 12/21/22= CORRECTION WERE MADE 12/21/2022 - PREVIOUS INSPECTION NOTES 12/21/22= NEED HOT PATCH ON THE ROAD ______________________________________________________________________________________________________________ 12/20/2022 - PREVIOUS INSPECTION NOTES 12/19/2022 - PREVIOUS INSPECTION NOTES CANT PASS AS NOTED ASPHALT PATCH NEEDS TO BE DONE BEFORE ROW FINAL WILL PASS ------------------------------------------------------------------- 12/16/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE ASPHALT PATCH DONE
ROW - FINAL INSPECTION 12/20/2022 CANCELLED BY APPLICANT PFLANAGAN
Note: 12/19/2022 - PREVIOUS INSPECTION NOTES CANT PASS AS NOTED ASPHALT PATCH NEEDS TO BE DONE BEFORE ROW FINAL WILL PASS ------------------------------------------------------------------- 12/16/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE ASPHALT PATCH DONE
ROW - FINAL INSPECTION 12/19/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: CANT PASS AS NOTED ASPHALT PATCH NEEDS TO BE DONE BEFORE ROW FINAL WILL PASS ------------------------------------------------------------------- 12/16/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE ASPHALT PATCH DONE
ROW - FINAL INSPECTION 12/16/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO HAVE THE ASPHALT PATCH DONE
ROW - FINAL APRON (AFTER POUR) 12/16/2022 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/15/2022 APPROVED PFLANAGAN
Note: 12/6/2022 - PREVIOUS INSPECTION NOTES YOU ARE STILL NEED TO FIX THE FOLLOWING 1) THE SOD ELEVATION UP NEXT TO HOUSE NEED TO BE 4" BELOW FFE FOR CONCRETE BLOCK HOMES AND 6" BELOW WOOD FRAME HOMES 2) YOU ARE IMPACTING YOUR DRAINAGE ON TO THE ADJACENT LOTS SURROUNDING YOURS ---------------------------------------------------------------------------------------------------------------------- 11/29/2022 - PREVIOUS INSPECTION NOTES 1) THE SOD ELEVATION UP NEXT TO HOUSE NEED TO BE 4" BELOW FFE FOR CONCRETE BLOCK HOMES AND 6" BELOW WOOD FRAME HOMES 2) YOU ARE IMPACTING YOUR DRAINAGE ON TO THE ADJACENT LOTS SURROUNDING YOURS
ROW FIELD SURVEY /GRADING CERTIFICATION 12/15/2022 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/06/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: YOU ARE STILL NEED TO FIX THE FOLLOWING 1) THE SOD ELEVATION UP NEXT TO HOUSE NEED TO BE 4" BELOW FFE FOR CONCRETE BLOCK HOMES AND 6" BELOW WOOD FRAME HOMES 2) YOU ARE IMPACTING YOUR DRAINAGE ON TO THE ADJACENT LOTS SURROUNDING YOURS ---------------------------------------------------------------------------------------------------------------------- 11/29/2022 - PREVIOUS INSPECTION NOTES 1) THE SOD ELEVATION UP NEXT TO HOUSE NEED TO BE 4" BELOW FFE FOR CONCRETE BLOCK HOMES AND 6" BELOW WOOD FRAME HOMES 2) YOU ARE IMPACTING YOUR DRAINAGE ON TO THE ADJACENT LOTS SURROUNDING YOURS
U-CROSS CONNECTION 12/05/2022 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ELECTRIC - EARLY POWER 12/05/2022 APPROVED BTAYLOR
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/29/2022 Disapproved - NO FEE PFLANAGAN
Note: 1) THE SOD ELEVATION UP NEXT TO HOUSE NEED TO BE 4" BELOW FFE FOR CONCRETE BLOCK HOMES AND 6" BELOW WOOD FRAME HOMES 2) YOU ARE IMPACTING YOUR DRAINAGE ON TO THE ADJACENT LOTS SURROUNDING YOURS
FINAL SURVEY (OFFICE USE ONLY) 11/23/2022 Disapproved - NO FEE GBERTOLA
Note: NEED TO CHECK INVERT NUMBERS SWALE PLAN INVERT IS 23.30 INVERT ON THE FINAL SURVEY IS 24.01 - 24.12 The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place I NEED ELEVATION ON THE CENTER LINA ON THE ROAD Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. (D) D.Florida Building Code, Residential, Chapter 4, R404.1.6
ROW- PRE-APRON (PRE-POUR) 10/06/2022 APPROVED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE MAKE SURE THE FOOTERS AT THE END OF PIPE ARE DUG OUT ----------------------------------------------------------------------------------- 10/3/2022 - PREVIOUS INSPECTION NOTES 9/23/2022 - PREVIOUS INSPECTION NOTES 9/15/2022 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE 36" ON FLARED END OF DRIVEWAY ON THE RIGHT SIDE 2) SOIL AROUND CULVERT PIPE IS WAY TO SOFT NEED TO COMPACT SOIL MORE OR ADD SOME ROCK OR SOMTHING TO MAKE IT HARDER 3) NEED TO RAISE FORM BOARDS OVER PIPE NEED TO HAVE 5" OF CONCRETE OVER THE PIPE ----------------------------------------------------------------------------------------------------------------------------- I CANNOT FIND THE BM, NEED TO RE STABLISH THE BENCH MARK. APRON WING NEED TO BE 36 INCH, DIDN'T CHECK THE CULVERT PIPE
ROW- PRE-APRON (PRE-POUR) 10/03/2022 CANCELLED BY APPLICANT PFLANAGAN
Note: 9/23/2022 - PREVIOUS INSPECTION NOTES 9/15/2022 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE 36" ON FLARED END OF DRIVEWAY ON THE RIGHT SIDE 2) SOIL AROUND CULVERT PIPE IS WAY TO SOFT NEED TO COMPACT SOIL MORE OR ADD SOME ROCK OR SOMTHING TO MAKE IT HARDER 3) NEED TO RAISE FORM BOARDS OVER PIPE NEED TO HAVE 5" OF CONCRETE OVER THE PIPE ----------------------------------------------------------------------------------------------------------------------------- I CANNOT FIND THE BM, NEED TO RE STABLISH THE BENCH MARK. APRON WING NEED TO BE 36 INCH, DIDN'T CHECK THE CULVERT PIPE
ROW- PRE-APRON (PRE-POUR) 09/23/2022 CANCELLED BY APPLICANT PFLANAGAN
Note: 9/15/2022 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE 36" ON FLARED END OF DRIVEWAY ON THE RIGHT SIDE 2) SOIL AROUND CULVERT PIPE IS WAY TO SOFT NEED TO COMPACT SOIL MORE OR ADD SOME ROCK OR SOMTHING TO MAKE IT HARDER 3) NEED TO RAISE FORM BOARDS OVER PIPE NEED TO HAVE 5" OF CONCRETE OVER THE PIPE ----------------------------------------------------------------------------------------------------------------------------- I CANNOT FIND THE BM, NEED TO RE STABLISH THE BENCH MARK. APRON WING NEED TO BE 36 INCH, DIDN'T CHECK THE CULVERT PIPE
INSULATION 09/20/2022 APPROVED BTAYLOR
Note: 9/19/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES 9/15/2022 - PREVIOUS INSPECTION NOTES 9-15-22 1. Can not use white foam in place of fire foam.
INSULATION 09/19/2022 CANCELLED BY APPLICANT BTAYLOR
Note: 9/16/2022 - PREVIOUS INSPECTION NOTES 9/15/2022 - PREVIOUS INSPECTION NOTES 9-15-22 1. Can not use white foam in place of fire foam.
INSULATION 09/16/2022 CANCELLED BY APPLICANT BTAYLOR
Note: 9/15/2022 - PREVIOUS INSPECTION NOTES 9-15-22 1. Can not use white foam in place of fire foam.
INSULATION 09/15/2022 Disapproved - NO FEE BTAYLOR
Note: 9-15-22 1. Can not use white foam in place of fire foam.
ROW- PRE-APRON (PRE-POUR) 09/15/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO HAVE 36" ON FLARED END OF DRIVEWAY ON THE RIGHT SIDE 2) SOIL AROUND CULVERT PIPE IS WAY TO SOFT NEED TO COMPACT SOIL MORE OR ADD SOME ROCK OR SOMTHING TO MAKE IT HARDER 3) NEED TO RAISE FORM BOARDS OVER PIPE NEED TO HAVE 5" OF CONCRETE OVER THE PIPE ----------------------------------------------------------------------------------------------------------------------------- I CANNOT FIND THE BM, NEED TO RE STABLISH THE BENCH MARK. APRON WING NEED TO BE 36 INCH, DIDN'T CHECK THE CULVERT PIPE
ROW- PRE-APRON (PRE-POUR) 09/08/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: I CANNOT FIND THE BM, NEED TO RE STABLISH THE BENCH MARK. APRON WING NEED TO BE 36 INCH, DIDN'T CHECK THE CULVERT PIPE
ALL ROUGH 09/06/2022 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/02/2022 APPROVED BTAYLOR
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 05/18/2022: roof sheathing only is approved per requst. 5/27/22 NEED ENGINEERED LETTER FOR CUT TRUSSES IN KITCHEN AREA BOTH SIDES 8-15-22 1. Not ready
FIREWALL FINAL 09/02/2022 APPROVED BTAYLOR
FIREWALL DRYWALL NAILING 08/25/2022 CANCELLED BY APPLICANT WEB
FIREWALL DRYWALL NAILING 08/25/2022 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 08/23/2022 APPROVED BTAYLOR
Note: THIS IS A REINSPECTION 8-22-22 1.Holes on right side need to have lath over them.
GRAVITY SEWER TEST 08/23/2022 APPROVED MGIBSON
U - SEWER TIE IN 08/23/2022 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 08/22/2022 Disapproved - NO FEE BTAYLOR
Note: 8-22-22 1.Holes on right side need to have lath over them.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/15/2022 Disapproved - NO FEE BTAYLOR
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 05/18/2022: roof sheathing only is approved per requst. 5/27/22 NEED ENGINEERED LETTER FOR CUT TRUSSES IN KITCHEN AREA BOTH SIDES 8-15-22 1. Not ready
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/27/2022 Disapproved - NO FEE RMARTIN
Note: THIS IS A REINSPECTION 05/18/2022: roof sheathing only is approved per requst. 5/27/22 NEED ENGINEERED LETTER FOR CUT TRUSSES IN KITCHEN AREA BOTH SIDES
ROOF VALLEY & METAL 05/27/2022 APPROVED RMARTIN
WALL SHEATHING 05/18/2022 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/18/2022 PARTIALLY APPROVED TSTAUFFACHER
Note: 05/18/2022: roof sheathing only is approved per requst.
FOUND SURVEY APPROVED (OFFICE) 04/27/2022 APPROVED TBAKER
FOOTER 04/18/2022 APPROVED - AS NOTED DCUSHING
Note: Retrofit Bearing pads and added filled cells to demizing wall
TIE BEAM / LINTEL 03/03/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Marked with highlighter on plans: Multiple dowel do not meet 3/4 in clearance, Holes for dowels must also be clear and free of dust and debris
TIE BEAM / LINTEL 03/02/2022 Disapproved - NO FEE TSTAUFFACHER
Note: Marked with highlighter on plans: Multiple dowel do not meet 3/4 in clearance, Holes for dowels must also be clear and free of dust and debris
MONOLITHIC SLAB 02/18/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Soil inside forms not compacted 02/17/2022: Work not completed areas inside main body of house not compacted
MONOLITHIC SLAB 02/17/2022 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: THIS IS A REINSPECTION Soil inside forms not compacted 02/17/2022: Work not completed areas inside main body of house not compacted
MONOLITHIC SLAB 02/15/2022 Disapproved - NO FEE TSTAUFFACHER
Note: Soil inside forms not compacted
MONOLITHIC SLAB 02/14/2022 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 02/08/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/02/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 HOLD 08/02/2022 08/02/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Wrong foundation survey submitted.
ZON HOLD 08/02/2022 08/02/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Foundation survey submitted not for this address
ENGIN1 COMPLETE 08/02/2022 08/02/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/02/2022 08/02/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 06/28/2022 06/29/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BADMIN INFORMATION 06/24/2022 06/24/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO TRUSS.PDF
BADMIN INFORMATION 06/24/2022 06/24/2022
Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM YOU NEED TO RENAMETHE TRUSS PLANS JUST TRUSS PLANS DO NOT PUT ANY NUMBERS OR ADDRESS IN FRONT OF THE DOCUMENTS. JUST NAME TRUSS JUST TRUSS
ENGIN1 COMPLETE 04/27/2022 04/27/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/27/2022 04/27/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/31/2022 04/01/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 10/18/2021 10/18/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 10/18/2021 10/18/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 10/04/2021 10/05/2021
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENTS: The legal description on the survey and the site plan is missing the section number. Please fix. THE CORRECT INFORMATION THAT NEEDS TO BE IN THE LEGAL DESCRIPTION IS "LOT 6, BLOCK 29, OF PALM COAST, MAP OF SEMINOLE PARK, SECTION 58"......... Need to provide the width of the walkways on the site plan.
SW1 HOLD 10/04/2021 10/12/2021
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See highlighted items on Attachment Stormwater Checklist. Water must flow form rear to front. Elevations along both side property lines must be shown 10 ft off the line. These elevation help determine if the drainage should be a "Common Swale" down the center of the two adjacent lots or if the drainage should be inside the new property line. Questions call Robert 386-793-3980
BADMIN HOLD 10/04/2021 10/04/2021
Note: Held By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM there is no survey you only submitted the Revision form
BADMIN COMPLETE 10/04/2021 10/04/2021
Note: Released By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/04/2021 10/04/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
CUSVC COMPLETE 08/19/2021 08/26/2021
Note: Released By: HALEIGH HAND - -
MECH COMPLETE 08/19/2021 08/19/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 08/19/2021 08/20/2021
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENTS: The legal description on the survey and the site plan is missing the section number. Please fix. The minimum driveway width is 16 feet for each garage – to total 32’. Please upload the correct landscape plan for review. Please refer to the land development code for the required number of CREDIT trees, the required number and placement of foundation plantings and please note that this lot faces a public right of way in the rear and requires additional foundation plantings in the rear. Need to provide the width of the walkways on the site plan. Please provide the exterior finish where requested on the color sheet. The A/C pads are in the rear on the site plan and on the sides on the floor plan. All must match, to include landscape plan.
BLD COMPLETE 08/19/2021 08/19/2021
Note: Released By: JPI
SW1 HOLD 08/19/2021 08/26/2021
Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items.
SWALE COMPLETE 06/01/2021 08/06/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 06/01/2021 06/01/2021
Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items.
ZON HOLD 05/25/2021 05/28/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - The legal description on the survey and the site plan is missing the section number. Please fix. The minimum driveway width is 16 feet for at least 20 feet from the garage doors. Then they may be reduced to a minimum of 10 feet the rest of the way to the roadway. Please upload the correct landscape plan for review. Please refer to the land development code for the required number of CREDIT trees, the required number and placement of foundation plantings and please note that this lot faces a public right of way in the rear and requires additional foundation plantings in the rear. Need to provide the driveway material on the site plan. Need to provide the width and material of the walkways on the site plan. Please provide the exterior finish where requested on the color sheet. The A/C pads are in the rear on the site plan and on the sides on the floor plan. All must match. Banding is required on the windows on the rear elevation which faces a public right of way.
BLD HOLD 05/25/2021 05/31/2021
Note: Held By: JPI 1. Sections A and B on page S-2A both reference GA File ASW 1002 for separation above block wall. However, file provided on same page is ASW 0810. Please clarify which is appropriate and correct to match. 2. Page 6, roof framing plan indicates incorrect section through rated partition. Floor plan, page 2, indicates Section B with curb. 3. Correct sheet numbering. Foundation and floor plan both labelled page 2. 4. Missing sheet 3A. Complete review cannot be performed. 5. Product Approval Spec Sheet provided, and Product Approval #’s provided for on drawings, page PA. Numbers do not match for multiple products. Please review and either provide matching numbers or eliminate one.
CUSVC HOLD 05/25/2021 05/25/2021
Note: Held By: HALEIGH HAND - - Please correct the utility application to have duplex checked off instead of single family.
ELEC COMPLETE 05/25/2021 05/26/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/25/2021 06/01/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/25/2021 05/28/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 05/25/2021 05/26/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Energy calcs and heatload for both sides of duplex 2. Orientation of Energy Calcs does not match the site plan. Revise to match the site plan.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤26.02 12/22/2022
CONTRACTOR CHANGE ¤20.00 12/22/2022
CONTRACTOR CHANGE ¤20.00 12/22/2022
SW ENG REINSPECTION 20 ¤20.00 12/22/2022
SW ENG REINSPECTION 20 ¤20.00 12/22/2022
SW ENG REINSPECTION 30 ¤30.00 12/22/2022
SW ENG REINSPECTION 30 ¤30.00 12/22/2022
PLAN REVIEW - REVISION ¤32.50 12/22/2022
PLAN REVIEW - REVISION ¤32.50 12/22/2022
REINSPECTION RESIDENTIAL ¤40.00 12/22/2022
CONNECTION FEES ¤120.10 12/22/2022
SEWER CAPITAL FACILITY ¤550.42 12/22/2022
WATER CAPITAL FACILITY FEE ¤404.10 12/22/2022
WATER CAPITAL FACILITY FEE ¤6,848.90 12/29/2021
METER - DEPOSIT ¤120.00 12/29/2021
METER - DEPOSIT ¤60.00 12/29/2021
WATER-METER ¤441.07 12/29/2021
CONNECTION FEES ¤2,035.66 12/29/2021
CONTRACTOR CHANGE ¤40.00 12/29/2021
STORM WATER PERMIT FEES ¤80.00 12/29/2021
3% TRANS IMPACT FEE CREDIT (¤79.98) 12/29/2021
SEWER CREDIT (¤2,932.00) 12/29/2021
SEWER INSPECTION ¤25.00 12/29/2021
SEWER CAPITAL FACILITY ¤9,329.10 12/29/2021
BUILDING DISCOUNT 100% (¤1,476.80) 12/29/2021
3% FIRE IMPACT FEE CREDIT (¤22.02) 12/29/2021
IMPACT FEE FIRE ¤734.00 12/29/2021
IMPACT FEE PARKS ¤2,398.24 12/29/2021
IMPACT FEE SCHOOL ¤7,200.00 12/29/2021
IMPACT FEE TRANSPORTATION ¤2,666.00 12/29/2021
WATER -IRRIGATION INSPECTION ¤25.00 12/29/2021
WATER -IRRIGATION INSPECTION ¤50.00 12/29/2021
3% PARKS IMPACT FEE CREDIT (¤71.95) 12/29/2021
NEW RESIDENTIAL INSPECTIONS ¤608.00 12/29/2021
SITE PLAN 20 ¤20.00 12/29/2021
SURCHARGE FS 533.721 ¤2.00 12/29/2021
SURCHARGE - FS 468.631 ¤2.00 12/29/2021
WATER- TURN ON ¤25.00 12/29/2021
WATER- TURN ON ¤50.00 12/29/2021
ADMINISTRATIVE RESIDENTIAL ¤20.00 12/29/2021
INSPECTION- ELECTRICAL ¤242.40 12/29/2021
INSPECTION - MECHANICAL ¤242.40 12/29/2021
INSPECTION - PLUMBING ¤242.40 12/29/2021
PLAN REVIEW - RESIDENTIAL ¤121.60 12/29/2021
Fees Total Due: ¤0.00 Total Paid: ¤30,391.66