I want to search for...
Permit #2021051539
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00180-0220 |
| CONDITIONED SPACE: 2148 sqft |
| GARAGE: 609 sqft |
| OPENED PORCH (WITH ROOF) : 212 sqft |
| OPENED PORCH (WITH ROOF) : 25 sqft |
| Total Square Footage: 2994 sqft |
| Block: 00180 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: 321-610-3924 |
| Location Address: 31 FAIRCHILD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/04/2021 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMBELL JR |
| Owner: VINTAGE ESTATE HOMES LLC |
|
Address 4885 N WICKHAM ROAD MELBOURNE, FL 32940 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
SUITE 101 MELBOURNE, FL 32940 |
CBC058803 (Exp: 08/31/2022) | 321-610-3924 |
Sub Contractors
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
ZACHARY PETER BOERA
| Status | Location Address | State License Number | Phone |
| CANCEL |
7225 SANDSCOVE COURT, SUITE 1 WINTER PARK, FL 32792 |
CAC1817652 (Exp: 08/31/2022) | 407-629-6920 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/01/2022 | FINAL APPROVED | RMARTIN |
| BLD - BUILDING FINAL | 02/28/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ELECTRIC PANEL HAS TWO BREAKERS THAT NEED TO BE LABELED, FRONT DOOR NEEDS WEATHER STRIPING, NEED TO SEAL DRYWALL AT AIR HANDLER UNIT, NEED TO TAKE OFF SOFIT AT GARAGE EYEBROW SO WE CAN SEE HOW IT WAS BUILT ALSO AT ROOF OVER THE GARAGE | |||
| BLD - BUILDING FINAL | 02/28/2022 | CANCELLED BY APPLICANT | WEB |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION ELECTRIC PANEL HAS TWO BREAKERS THAT NEED TO BE LABELED, FRONT DOOR NEEDS WEATHER STRIPING, NEED TO SEAL DRYWALL AT AIR HANDLER UNIT, NEED TO TAKE OFF SOFIT AT GARAGE EYEBROW SO WE CAN SEE HOW IT WAS BUILT ALSO AT ROOF OVER THE GARAGE | |||
| BLD - BUILDING FINAL | 02/24/2022 | Disapproved - NO FEE | RMARTIN |
| Note: THIS IS A REINSPECTION ELECTRIC PANEL HAS TWO BREAKERS THAT NEED TO BE LABELED, FRONT DOOR NEEDS WEATHER STRIPING, NEED TO SEAL DRYWALL AT AIR HANDLER UNIT, NEED TO TAKE OFF SOFIT AT GARAGE EYEBROW SO WE CAN SEE HOW IT WAS BUILT ALSO AT ROOF OVER THE GARAGE | |||
| BLD - BUILDING FINAL | 02/23/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. AHU breaker not labeled on unit. 2. Please post insulation plackard in attic. 3. Slots in garage on outside wall need to be sealed. 4. Hole in garage ceiling at small garage door needs to be sealed. 5. Access panels in master bath need to be covered. | |||
| TUB SET | 02/22/2022 | APPROVED | MGIBSON |
| U -UTILITY RESIDENTIAL FINAL | 02/14/2022 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/07/2022 | APPROVED | KRUTH |
| ROW - STORMWATER FINAL | 02/07/2022 | APPROVED | KRUTH |
| U-CROSS CONNECTION | 02/07/2022 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 02/07/2022 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 02/07/2022 | APPROVED | KRUTH |
| ELECTRIC - EARLY POWER | 01/26/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1.Ufer ground must be accessible 2.Light in pantry not safed off 1/24/22 1. Ufer ground must be accessible 2. Light in pantry not safed off 1/26/22 Emailed FPL @ 10:15 AM | |||
| TUB SET | 01/25/2022 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 01/25/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION NOT TIE IN TO SEWER TAP YET | |||
| U - SEWER TIE IN | 01/24/2022 | Disapproved - NO FEE | MGIBSON |
| Note: NOT TIE IN TO SEWER TAP YET | |||
| ELECTRIC - EARLY POWER | 01/24/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: THIS IS A REINSPECTION 1.Ufer ground must be accessible 2.Light in pantry not safed off 1/24/22 1. Ufer ground must be accessible 2. Light in pantry not safed off | |||
| ELECTRIC - EARLY POWER | 01/21/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1.Ufer ground must be accessible 2.Light in pantry not safed off | |||
| ROW- PRE-APRON (PRE-POUR) | 01/12/2022 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| INSULATION | 12/10/2021 | APPROVED - AS NOTED | KSANDOE |
| Note: Tub Set inspection added for Garden tub. | |||
| ALL ROUGH | 12/06/2021 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION NAIL GUARDS NEEDED AT MID SPAN BLOCKING @ WATER HEATER AND AT BOTTOM PLATES BOTH VANITIES | |||
| ALL ROUGH | 12/03/2021 | Disapproved - NO FEE | DCUSHING |
| Note: NAIL GUARDS NEEDED AT MID SPAN BLOCKING @ WATER HEATER AND AT BOTTOM PLATES BOTH VANITIES | |||
| LATH/BRICK/ WATER BARRIER | 12/03/2021 | APPROVED | DCUSHING |
| ROOF VALLEY & METAL | 11/04/2021 | APPROVED | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/01/2021 | APPROVED | DCUSHING |
| TIE BEAM / LINTEL | 09/15/2021 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION Clearance from masonry FBC, R606.3.4 minimum wall reinforcing steel coverage not met (.75 inch) (see orange paint) 9-15-21 notes above resolved | |||
| TIE BEAM / LINTEL | 09/14/2021 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Clearance from masonry FBC, R606.3.4 minimum wall reinforcing steel coverage not met (.75 inch) (see orange paint) | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/10/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/25/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION 1. CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.3.3.7.4 (caved in in several areas and many bottom corners slumped in and rounded) 2. No evidence of termite treatment or notice of intent to treat, R318.1.7 3. missing UFER NEC 250.68(A) | |||
| MONOLITHIC SLAB | 08/24/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.3.3.7.4 (caved in in several areas and many bottom corners slumped in and rounded) 2. No evidence of termite treatment or notice of intent to treat, R318.1.7 3. missing UFER NEC 250.68(A) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/12/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 08/12/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 08/10/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/28/2022 | 02/28/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/22/2022 | 02/22/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/15/2022 | 02/16/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the builder per 107.1 FBC Residential 2020 7th edition 2. Minimum outdoor design temp on heatload for st. augustine at 1% per wrightsoft needs to be 89 degrees 3. Design location on heatload needs to be St. Augustine | |||
| ZON | COMPLETE | 09/09/2021 | 09/09/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/09/2021 | 09/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/09/2021 | 09/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/09/2021 | 09/09/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 08/30/2021 | 08/30/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Wrong foundation survey | |||
| ZON | HOLD | 08/30/2021 | 08/30/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM foundation survey submitted is for wrong address | |||
| SW1 | COMPLETE | 06/02/2021 | 06/02/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/02/2021 | 06/02/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/25/2021 | 06/01/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/25/2021 | 05/31/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/25/2021 | 05/26/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/25/2021 | 05/26/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/25/2021 | 05/25/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/25/2021 | 05/28/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/25/2021 | 05/26/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from 2020 7Th edition code cycle | |||
| SWALE | COMPLETE | 05/25/2021 | 08/06/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/28/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/25/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/22/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/22/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/22/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 02/22/2022 |
| BUILDING DISCOUNT 100% | (¤1,346.60) | 08/04/2021 |
| ELECTRIC FEE | ¤223.80 | 08/04/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 08/04/2021 |
| IMPACT FEE FIRE | ¤367.00 | 08/04/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 08/04/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/04/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 08/04/2021 |
| MECHANICAL FEE | ¤223.80 | 08/04/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/04/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 08/04/2021 |
| PLAN CHECK FEE | ¤109.20 | 08/04/2021 |
| PLUMBING FEE | ¤223.80 | 08/04/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤546.00 | 08/04/2021 |
| SITE PLAN 20 | ¤20.00 | 08/04/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/04/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/04/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/04/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 08/04/2021 |
| SEWER INSPECTION | ¤25.00 | 08/04/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 08/04/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 08/04/2021 |
| CONNECTION FEES | ¤1,017.83 | 08/04/2021 |
| METER - DEPOSIT | ¤60.00 | 08/04/2021 |
| WATER- TURN ON | ¤25.00 | 08/04/2021 |
| ADMIN FEE | ¤20.00 | 08/04/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,356.43 |