I want to search for...
Permit #2021051642
Permit Details
Status: COED
| Parcel Id: 07-11-31-7004-00220-0020 |
| CONDITIONED SPACE: 2066 sqft |
| GARAGE: 787 sqft |
| OPENED PORCH (WITH ROOF) : 284 sqft |
| OPENED PORCH (WITH ROOF) : 73 sqft |
| Total Square Footage: 3210 sqft |
| Block: 00220 |
| Subdivision: 2203 - SECTION 4-COUNTRY CLUB COVE |
| Job Phone: 386-931-5395 |
| Location Address: 5 CORMORANT CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/07/2021 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: GINN MICHAEL CHARLES II |
|
Address 18813 41ST N LOXAHATCHEE, FL 33470 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤370,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
DILLON CARRERAS
| Status | Location Address | State License Number |
| ACTIVE |
3504 LUNDY ROAD PALATKA, FL 32177 |
EC13010133 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/04/2023 | FINAL APPROVED | AGAETANO |
| Note: 12/29/2022 - PREVIOUS INSPECTION NOTES 10/31/2022 - PREVIOUS INSPECTION NOTES 10-31-2022 Door locked. NEED ACCESS FOR INSPECTION FBC 110. 12-29-2022 Energy calcs do not match with units. Please have pull down steps in garage open and ladder down for inspection. | |||
| BLD - BUILDING FINAL | 12/29/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 10/31/2022 - PREVIOUS INSPECTION NOTES 10-31-2022 Door locked. NEED ACCESS FOR INSPECTION FBC 110. 12-29-2022 Energy calcs do not match with units. Please have pull down steps in garage open and ladder down for inspection. | |||
| ROW - STORMWATER FINAL | 11/18/2022 | FINAL APPROVED | EMADISON |
| Note: ** 11/18/22 CORRECTIONS MADE 11/17/2022 - PREVIOUS INSPECTION NOTES ** 11/17/22 FACING THE HOUSE ON THE LEFT SIDE, MUST CLEAN SEDIMENT FROM CANAL AT SEAWALL THAT HAS ERODED INTO IT. THIS NEEDS TO BE REMOVED BEFORE ROW FINAL WILL PASS (SEE PREVIOUS NOTES) 10/31/2022 - PREVIOUS INSPECTION NOTES 10/31/22=FACING THE HOUSE ON THE LEFT SIDE, MUST CLEAN SEDIMENT FROM CANAL AT SEAWALL THAT HAS ERODED INTO IT. NEED TO REPAIR THE WASH OUT ON THE LEFT CORNER ON THE BACK YARD .................................................................................................................................................................................................................................. BEFORE FINAL ROW IS APPROVED: ** 10/18/22 ROAD REPAIRS NEEDED BOTH SIDES OF DRIVEWAY REPAIR OUTLINED WITH PINK PAINT ** BOTH RIGHT AND LEFT SIDE PROPERTY LINES NEED TO HAVE MATERIAL TO FILL WASHOUTS AND SODDED ALSO NEED TO CLEAN ERODED SEDIMENT FROM ADJACENT PROPERTIES WHICH THEY WERE NEGATIVELY IMPACTED BY THIS JOB SITE. ** MUST CLEAN SEDIMENT FROM CANAL AT SEAWALL THAT HAS ERODED INTO IT. ** CLEAN CULVERT ENDS | |||
| ROW - STORMWATER FINAL | 11/17/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/17/22 FACING THE HOUSE ON THE LEFT SIDE, MUST CLEAN SEDIMENT FROM CANAL AT SEAWALL THAT HAS ERODED INTO IT. THIS NEEDS TO BE REMOVED BEFORE ROW FINAL WILL PASS (SEE PREVIOUS NOTES) 10/31/2022 - PREVIOUS INSPECTION NOTES 10/31/22=FACING THE HOUSE ON THE LEFT SIDE, MUST CLEAN SEDIMENT FROM CANAL AT SEAWALL THAT HAS ERODED INTO IT. NEED TO REPAIR THE WASH OUT ON THE LEFT CORNER ON THE BACK YARD .................................................................................................................................................................................................................................. BEFORE FINAL ROW IS APPROVED: ** 10/18/22 ROAD REPAIRS NEEDED BOTH SIDES OF DRIVEWAY REPAIR OUTLINED WITH PINK PAINT ** BOTH RIGHT AND LEFT SIDE PROPERTY LINES NEED TO HAVE MATERIAL TO FILL WASHOUTS AND SODDED ALSO NEED TO CLEAN ERODED SEDIMENT FROM ADJACENT PROPERTIES WHICH THEY WERE NEGATIVELY IMPACTED BY THIS JOB SITE. ** MUST CLEAN SEDIMENT FROM CANAL AT SEAWALL THAT HAS ERODED INTO IT. ** CLEAN CULVERT ENDS | |||
| U-CROSS CONNECTION | 11/17/2022 | APPROVED | DHANEY |
| BLD - BUILDING FINAL | 10/31/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 10-31-2022 Door locked. NEED ACCESS FOR INSPECTION FBC 110. | |||
| ROW - STORMWATER FINAL | 10/31/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 10/31/22=FACING THE HOUSE ON THE LEFT SIDE, MUST CLEAN SEDIMENT FROM CANAL AT SEAWALL THAT HAS ERODED INTO IT. NEED TO REPAIR THE WASH OUT ON THE LEFT CORNER ON THE BACK YARD .................................................................................................................................................................................................................................. BEFORE FINAL ROW IS APPROVED: ** 10/18/22 ROAD REPAIRS NEEDED BOTH SIDES OF DRIVEWAY REPAIR OUTLINED WITH PINK PAINT ** BOTH RIGHT AND LEFT SIDE PROPERTY LINES NEED TO HAVE MATERIAL TO FILL WASHOUTS AND SODDED ALSO NEED TO CLEAN ERODED SEDIMENT FROM ADJACENT PROPERTIES WHICH THEY WERE NEGATIVELY IMPACTED BY THIS JOB SITE. ** MUST CLEAN SEDIMENT FROM CANAL AT SEAWALL THAT HAS ERODED INTO IT. ** CLEAN CULVERT ENDS | |||
| U -UTILITY RESIDENTIAL FINAL | 10/31/2022 | FINAL APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 10/20/2022 | APPROVED | AGAETANO |
| ROW - FINAL APRON (AFTER POUR) | 10/18/2022 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/18/2022 | APPROVED | EMADISON |
| Note: ** 10/18/22 ROAD REPAIRS NEEDED BOTH SIDES OF DRIVEWAY REPAIR OUTLINED WITH PINK PAINT ** BOTH RIGHT AND LEFT SIDE PROPERTY LINES NEED TO HAVE MATERIAL TO FILL WASHOUTS AND SODDED ALSO NEED TO CLEAN ERODED SEDIMENT FROM ADJACENT PROPERTIES WHICH THEY WERE NEGATIVELY IMPACTED BY THIS JOB SITE. ** MUST CLEAN SEDIMENT FROM CANAL AT SEAWALL THAT HAS ERODED INTO IT. ** CLEAN CULERT ENDS 10/11/2022 - PREVIOUS INSPECTION NOTES ** 10/11/22 BUILDER NEEDS TO RESCHEDULE FIELD SURVEY WHEN SOD IS DOWN.. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/11/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/11/22 BUILDER NEEDS TO RESCHEDULE FIELD SURVEY WHEN SOD IS DOWN.. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/11/2022 | APPROVED | EMADISON |
| ROW- PRE-APRON (PRE-POUR) | 09/02/2022 | APPROVED | EMADISON |
| Note: THIS IS A REINSPECTION ** 09/02/22 AT THE TIME OF THE INSPECTION CULVERT IS GOOD, ENSURE FOOTERS ARE CLEANED OUT IN THE EVENT OF RAIN RECHECK CULVERT ELEVATIONS ** 08/30/22 TOO MUCH WATER IN APRON POUR AREA FOOTERS ARE FULL OF WATER MATERIAL AROIUND CULVERT IS BUTTER SOFT FOOT SINKS 4 INCHES AND WATER PUSHES OUT | |||
| ROW- PRE-APRON (PRE-POUR) | 08/30/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/30/22 TOO MUCH WATER IN APRON POUR AREA FOOTERS ARE FULL OF WATER MATERIAL AROIUND CULVERT IS BUTTER SOFT FOOT SINKS 4 INCHES AND WATER PUSHES OUT | |||
| U - SEWER TIE IN | 06/21/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 06/21/2022 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 05/25/2022 | APPROVED | AGAETANO |
| INSULATION | 05/20/2022 | APPROVED | AGAETANO |
| ALL ROUGH | 05/13/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Homeowner on site and showed a photo of the repaired PVC line in the living room area. Please provide manufacturer's specifications of the material that was used and that it is allowable to be used under concrete. P3003.2 Prohibited joints. | |||
| ALL ROUGH | 05/12/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Homeowner on site and showed a photo of the repaired PVC line in the living room area. Please provide manufacturer's specifications of the material that was used and that it is allowable to be used under concrete. Please request an additional inspection on the pipe that will be repaired. P3003.2 Prohibited joints. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/10/2022 | APPROVED | RMARTIN |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION Please have a full set of approved drawings on site for inspection. Inspection stopped. 04-18-2022 - 1. A2 Legend indicates bearing wall details. No details provided. 2. No details or strapping provided for 2 x 6 rafters at hallway from garage. Must have continuous load path. 3. Please provide bearing wall connector schedule in garage. Framer on site with inspector. 05-04-2022 Above issues have not been corrected. Please provide a FULL set of approved drawings for inspectio. To avoide further fees, please provide a FULL set of approved drawings for future inspections. FBC 107. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/09/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION Please have a full set of approved drawings on site for inspection. Inspection stopped. 04-18-2022 - 1. A2 Legend indicates bearing wall details. No details provided. 2. No details or strapping provided for 2 x 6 rafters at hallway from garage. Must have continuous load path. 3. Please provide bearing wall connector schedule in garage. Framer on site with inspector. 05-04-2022 Above issues have not been corrected. Please provide a FULL set of approved drawings for inspectio. To avoide further fees, please provide a FULL set of approved drawings for future inspections. FBC 107. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/04/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION Please have a full set of approved drawings on site for inspection. Inspection stopped. 04-18-2022 - 1. A2 Legend indicates bearing wall details. No details provided. 2. No details or strapping provided for 2 x 6 rafters at hallway from garage. Must have continuous load path. 3. Please provide bearing wall connector schedule in garage. Framer on site with inspector. 05-04-2022 Above issues have not been corrected. Please provide a FULL set of approved drawings for inspectio. To avoide further fees, please provide a FULL set of approved drawings for future inspections. FBC 107. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/03/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please have a full set of approved drawings on site for inspection. Inspection stopped. 04-18-2022 - 1. A2 Legend indicates bearing wall details. No details provided. 2. No details or strapping provided for 2 x 6 rafters at hallway from garage. Must have continuous load path. 3. Please provide bearing wall connector schedule in garage. Framer on site with inspector. | |||
| WALL SHEATHING | 04/27/2022 | APPROVED | AGAETANO |
| ROOF VALLEY & METAL | 04/19/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/18/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION Please have a full set of approved drawings on site for inspection. Inspection stopped. 04-18-2022 - 1. A2 Legend indicates bearing wall details. No details provided. 2. No details or strapping provided for 2 x 6 rafters at hallway from garage. Must have continuous load path. 3. Please provide bearing wall connector schedule in garage. Framer on site with inspector. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/14/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Please have a full set of approved drawings on site for inspection. Inspection stopped. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/07/2022 | PARTIALLY APPROVED | RGROSS |
| Note: Per Builder the Temp Culvert is scheduled to be re-set tomorrow. Next inspection 4/7/22. This should have been a drainage inspection. Nieghbors called temp pipe clogged. Field Survey scheduled instead of drainage. | |||
| ELECTRIC-TUG | 04/04/2022 | APPROVED | AGAETANO |
| TIE BEAM / LINTEL | 03/02/2022 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 02/25/2022 | APPROVED | TBAKER |
| ELEV CERT-FOUNDATION APPROVAL | 02/24/2022 | APPROVED | JMYERS |
| MONOLITHIC SLAB | 02/14/2022 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/24/2022 | APPROVED | MGIBSON |
| STEM WALL FOUNDATION | 12/03/2021 | APPROVED | RMARTIN |
| STEM WALL FOUNDATION | 11/24/2021 | APPROVED | DCUSHING |
| WATER METER INSTALLATION REQUEST | 08/23/2021 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/03/2023 | 01/03/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 11/17/2022 | 11/18/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| PLFM | HOLD | 10/25/2022 | 10/26/2022 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM In Section D there does not appear to be a seal in the required box, the elevation certificate is not valid without a seal. Please provide all 6 pages of the elevation certificate. A revised EC was not submitted for review. | |||
| MECH | COMPLETE | 10/25/2022 | 10/25/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 10/10/2022 | 10/10/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM In Section D there does not appear to be a seal in the required box, the elevation certificate is not valid without a seal. Please provide all 6 pages of the elevation certificate. | |||
| ENGIN1 | COMPLETE | 02/24/2022 | 02/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/24/2022 | 02/24/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 02/24/2022 | 02/24/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The foundation elevation certificate has been approved. Please provide Final prior to CO. | |||
| BLD | COMPLETE | 12/09/2021 | 12/09/2021 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Truss plans not required for submittal, only to be at the job site for the inspector the Truss 'layout' is required for prior approval. | |||
| BLD | HOLD | 12/08/2021 | 12/08/2021 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM repeat comment - Digital signature cannot be a copy, they must be verifiable. | |||
| BLD | HOLD | 12/07/2021 | 12/07/2021 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Digital signature cannot be a copy, they must be verifiable. | |||
| BADMIN | HOLD | 11/15/2021 | 11/15/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM PLANS ARE MISSING DIGITAL SIGNATURE FROM ARCHITECT/ENGINEER | |||
| BADMIN | COMPLETE | 11/15/2021 | 11/15/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/15/2021 | 11/15/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/07/2021 | 06/07/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/07/2021 | 06/07/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 06/03/2021 | 06/04/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate has been approved, however at foundation there must be a visible seal in the box in Section D. Either use a raised seal and shade over it so that it is visible or use a wet seal. | |||
| BLD | COMPLETE | 05/26/2021 | 05/31/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/26/2021 | 05/27/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/26/2021 | 06/01/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/26/2021 | 05/26/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/26/2021 | 06/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/26/2021 | 05/27/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show R38 in attic w/ vented soffit. Energy calcs say R21 on roof deck with unvented soffit. Revise to soffit note and insulation match. 2. Duct Layout needs to be signed by the AC contractor | |||
| SW1 | COMPLETE | 05/26/2021 | 06/02/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/26/2021 | 06/03/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveway must be a minimum width of 16ft Landscape plan must clearly show the 4 required trees for this lot size | |||
| SWALE | COMPLETE | 05/26/2021 | 08/07/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 01/04/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/04/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/04/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/04/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/04/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/04/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/04/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/04/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/04/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/04/2023 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/07/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/07/2021 |
| SEWER INSPECTION | ¤25.00 | 06/07/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/07/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/07/2021 |
| CONNECTION FEES | ¤1,017.83 | 06/07/2021 |
| METER - DEPOSIT | ¤60.00 | 06/07/2021 |
| METER - DEPOSIT | ¤60.00 | 06/07/2021 |
| WATER-METER | ¤441.07 | 06/07/2021 |
| WATER- TURN ON | ¤25.00 | 06/07/2021 |
| WATER- TURN ON | ¤25.00 | 06/07/2021 |
| ADMIN FEE | ¤20.00 | 06/07/2021 |
| BUILDING DISCOUNT 100% | (¤1,754.00) | 06/07/2021 |
| ELECTRIC FEE | ¤282.00 | 06/07/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/07/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/07/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/07/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/07/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/07/2021 |
| MECHANICAL FEE | ¤282.00 | 06/07/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/07/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/07/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/07/2021 |
| PLAN CHECK FEE | ¤148.00 | 06/07/2021 |
| PLUMBING FEE | ¤282.00 | 06/07/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤740.00 | 06/07/2021 |
| SITE PLAN 20 | ¤20.00 | 06/07/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/07/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/07/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,990.00 |