Permit #2021051643
Permit Details
Status: COED
| Parcel Id: 15-11-31-2970-00000-1040 |
| CONDITIONED SPACE: 3948 sqft |
| OPENED PORCH (WITH ROOF) : 442 sqft |
| GARAGE: 760 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 87 sqft |
| GARAGE: 72 sqft |
| Total Square Footage: 5764 sqft |
| Block: 00000 |
| Subdivision: 2070 - GRAND HAVEN NORTH PHASE 1 |
| Job Phone: 386-445-2012 |
| Location Address: 10 LONG LAKE WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/09/2021 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: KRAYTER VALERIY & YELENA KRAYTER |
|
Address 20 NORTH PARK CIRCLE PALM COAST, FL 32137 |
| Lot: 1040 |
| Contracted Stated Job Value: ¤461,787.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
MARK B SOWERS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
609 FOURTH ST BUNNELL, FL 32110 |
35616 (Exp: 08/31/2026) | 386-225-1753 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/27/2023 | FINAL APPROVED | TSTAUFFACHER |
| ROW - STORMWATER FINAL | 12/29/2022 | FINAL APPROVED | PFLANAGAN |
| Note: 12/19/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE PALLET OF SOD PICKED UP BEFORE THIS INSPECTION WILL PASS | |||
| U -UTILITY RESIDENTIAL FINAL | 12/29/2022 | FINAL APPROVED | DHANEY |
| Note: 12/19/2022 - PREVIOUS INSPECTION NOTES all 3 sewer clean out-s need lowering and flush mount caps | |||
| ROW - STORMWATER FINAL | 12/19/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO HAVE THE PALLET OF SOD PICKED UP BEFORE THIS INSPECTION WILL PASS | |||
| U -UTILITY RESIDENTIAL FINAL | 12/19/2022 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: all 3 sewer clean out-s need lowering and flush mount caps | |||
| U-CROSS CONNECTION | 12/19/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 12/19/2022 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/16/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/16/2022 | APPROVED | PFLANAGAN |
| GAS ROUGH | 12/01/2022 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 11/14/2022 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS. CONTRACTOR STATES THE PAVERS ARE GOING ALL THE WAY TO THE HOUSE NOW -------------------------------------------------------------------------------------------- 11/8/2022 - PREVIOUS INSPECTION NOTES THERE ARE NO PAVER RESTRAINTS UP AGAINIST THE HOUSE NEED TO POUR THOSE BEFORE PASSING ------------------------------------------------------------------------------------------------------- 11/4/2022 - PREVIOUS INSPECTION NOTES ** 11/04/22 PAVER BASE NEEDS MORE COMPACTION ALSO NOT ENOUGH PAVER BASE PUT DOWN SITE NOT READY. 9/16/2022 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND SIDEWALK AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO DOWN AND COMPACTED WITH NO PAVERS LAYED. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/08/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THERE ARE NO PAVER RESTRAINTS UP AGAINIST THE HOUSE NEED TO POUR THOSE BEFORE PASSING ------------------------------------------------------------------------------------------------------- 11/4/2022 - PREVIOUS INSPECTION NOTES ** 11/04/22 PAVER BASE NEEDS MORE COMPACTION ALSO NOT ENOUGH PAVER BASE PUT DOWN SITE NOT READY. 9/16/2022 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND SIDEWALK AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO DOWN AND COMPACTED WITH NO PAVERS LAYED. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/04/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/04/22 PAVER BASE NEEDS MORE COMPACTION ALSO NOT ENOUGH PAVER BASE PUT DOWN SITE NOT READY. 9/16/2022 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND SIDEWALK AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO DOWN AND COMPACTED WITH NO PAVERS LAYED. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/16/2022 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR APRON AND SIDEWALK AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO DOWN AND COMPACTED WITH NO PAVERS LAYED. | |||
| ROW- PAVER RESTRAINTS | 09/16/2022 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 07/14/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:35 am | |||
| GRAVITY SEWER TEST | 06/06/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 06/06/2022 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 06/03/2022 | APPROVED | FWILLIS |
| WINDOW NAILING | 05/17/2022 | APPROVED | FWILLIS |
| INSULATION | 05/17/2022 | APPROVED | FWILLIS |
| ALL ROUGH | 04/04/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: CALL IN WINDOW NAILING FOR MASTER BATH WINDOW AND WINDOW OVER FRONT DOOR WHEN READY | |||
| ELECTRIC-TUG | 02/16/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 12:30 pm | |||
| ROOF VALLEY & METAL | 12/21/2021 | APPROVED | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/14/2021 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 11/16/2021 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 10/28/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/20/2021 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/14/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/18/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/05/2023 | 01/05/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/28/2021 | 10/28/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/28/2021 | 10/28/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/03/2021 | 06/04/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/26/2021 | 05/31/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/26/2021 | 05/27/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 05/26/2021 | 06/01/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit riser diagram for generator and manufacture specs | |||
| ENGIN1 | COMPLETE | 05/26/2021 | 05/26/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Roadway designed with curb and gutter; swale plan not required | |||
| LOCATE | COMPLETE | 05/26/2021 | 06/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/26/2021 | 05/28/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/26/2021 | 06/02/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/26/2021 | 06/03/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 01/30/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/30/2023 |
| REINSPECTION FEE | ¤40.00 | 01/30/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/30/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/30/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/30/2023 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/09/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤94.17) | 08/09/2021 |
| SEWER INSPECTION | ¤25.00 | 08/09/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,024.00 | 08/09/2021 |
| SITE PLAN 20 | ¤20.00 | 08/09/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/09/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/09/2021 |
| CONNECTION FEES | ¤25.00 | 08/09/2021 |
| METER - DEPOSIT | ¤60.00 | 08/09/2021 |
| WATER-METER | ¤441.07 | 08/09/2021 |
| ADMIN FEE | ¤20.00 | 08/09/2021 |
| BUILDING DISCOUNT 100% | (¤2,350.40) | 08/09/2021 |
| ELECTRIC FEE | ¤367.20 | 08/09/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 08/09/2021 |
| IMPACT FEE FIRE | ¤367.00 | 08/09/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 08/09/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/09/2021 |
| IMPACT FEE TRANSPORTATION | ¤3,139.00 | 08/09/2021 |
| MECHANICAL FEE | ¤367.20 | 08/09/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 08/09/2021 |
| PLAN CHECK FEE | ¤204.80 | 08/09/2021 |
| PLUMBING FEE | ¤367.20 | 08/09/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤8,991.54 |