Permit #2021051687
Permit Details
Status: COED
| Parcel Id: 07-11-31-7025-00050-0100 |
| CONDITIONED SPACE: 1665 sqft |
| GARAGE: 395 sqft |
| OPENED PORCH (WITH ROOF) : 64 sqft |
| OPENED PORCH (WITH ROOF) : 73 sqft |
| Total Square Footage: 2197 sqft |
| Block: 00050 |
| Subdivision: 2189 - SECTION 25-PINE GROVE |
| Job Phone: 321-249-3126 |
| Location Address: 8 PLUMTREE PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/11/2021 |
| NOC: RECORDED |
| Applicant name: MOREY C DOYLE |
| Owner: WJHFL LLC D\B\A WJH LLC A DELAWARE LIMITED |
|
Address 3091 GOVERNORS LAKE DRIVE SUITE 300 NORCROSS, GA 30071 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤99,900.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WADE JURNEY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
3091 GOVERNORS LAKE DRIVE NORCROSS, GA 30071 |
CGC1517458 (Exp: 08/31/2022) | 321-249-3126 |
Sub Contractors
EDWIN R INSALACO
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
3191 MAGUIRE BLVD ORLANDO, FL 32803 |
STE 200 ORLANDO, FL 32803 |
EC13001310 (Exp: 08/31/2024) | 321-441-7990 | 407-426-9741 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
IAN ALAN BRENNER
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
691 GARDEN COMMERCE PKWY WINTER GARDEN, FL 34787 |
STE 170 WINTER GARDEN, FL 34787 |
CCC1331270 (Exp: 08/31/2026) | 407-649-1333 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 05/03/2022 | APPROVED | GBERTOLA |
| Note: 05/3/22= CORRECTION WERE MADE The fall in the swale is in the wrong direction please. WATER FLOW TO LEFT SIDE NEED TO REMOVE THE CONCRETE INSIDE THE CULVERT PIPES AND THE DIR 4/29/22 NEED HAVE ALL DIRT AND OVER POURED CONCRETE CLEANED OUT OF CULVERT PIPE | |||
| U -UTILITY RESIDENTIAL FINAL | 04/29/2022 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 04/29/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: The fall in the swale is in the wrong direction please. WATER FLOW TO LEFT SIDE NEED TO REMOVE THE CONCRETE INSIDE THE CULVERT PIPES AND THE DIR 4/29/22 NEED HAVE ALL DIRT AND OVER POURED CONCRETE CLEANED OUT OF CULVERT PIPE | |||
| ROW - FINAL APRON (AFTER POUR) | 04/29/2022 | APPROVED | PFLANAGAN |
| BLD - BUILDING FINAL | 04/29/2022 | Approval - Private Provider | PPROVIDER |
| FINAL SURVEY (OFFICE USE ONLY) | 04/28/2022 | APPROVED | EMADISON |
| Note: CORRECTION MADE IT SOD IS NOT DOWN, NEED A NEW FINAL SURVEY | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/28/2022 | APPROVED - AS NOTED | EMADISON |
| Note: The fall in the swale is in the wrong direction please. WATER FLOW TO LEFT SIDE NEED TO REMOVE THE CONCRETE INSIDE THE CULVERT PIPES AND THE DIRT | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/21/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: SOD IS NOT DOWN, NEED A NEW FINAL SURVEY | |||
| ROW- PROJECT STATUS | 03/30/2022 | APPROVED | GBERTOLA |
| Note: MEETING WITH THE DARIN EMON GRADING | |||
| ELECTRIC - EARLY POWER | 03/28/2022 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 03/22/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION TOO MUCH WATER IN THE POUR AREA. WATER RUNNING CLEAR THE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION. 3/21/22 - Footers on the end completely washed out. Water still leaching from below in some parts of the sides of the pipe. Builder may want to use some roadbase along the sides to obsorb some of the moisture keeping the gound too soft to pour. Photo's attached. 3/22/22 - Culvert ends have been properly prepared. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/21/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION TOO MUCH WATER IN THE POUR AREA. WATER RUNNING CLEAR THE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION. 3/21/22 - Footers on the end completely washed out. Water still leaching from below in some parts of the sides of the pipe. Builder may want to use some roadbase along the sides to obsorb some of the moisture keeping the gound too soft to pour. Photo's attached. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/16/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: TOO MUCH WATER IN THE POUR AREA. WATER RUNNING CLEAR THE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION. | |||
| U-CROSS CONNECTION | 03/14/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/14/2022 | APPROVED | TBAKER |
| GRAVITY SEWER TEST | 02/24/2022 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 02/22/2022 | CANCELLED BY INSPECTOR | KSANDOE |
| Note: Call private provider | |||
| U - SEWER TIE IN | 02/22/2022 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 02/16/2022 | Approval - Private Provider | PPROVIDER |
| INSULATION | 02/14/2022 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 02/09/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 01/20/2022 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 01/17/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/17/2022 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 12/27/2021 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 12/01/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/23/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 11/15/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/14/2022 | 03/14/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/14/2022 | 03/14/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/11/2021 | 06/11/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/07/2021 | 06/08/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/27/2021 | 05/31/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/27/2021 | 06/04/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 05/27/2021 | 06/01/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit riser diagram | |||
| ENGIN1 | COMPLETE | 05/27/2021 | 05/27/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/27/2021 | 06/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/27/2021 | 05/28/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/27/2021 | 06/02/2021 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See checklist in attachments highlighted line. Need more directional arrows to clearly show the drainage pattern | |||
| ZON | COMPLETE | 05/27/2021 | 06/03/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| SWALE | COMPLETE | 05/27/2021 | 08/07/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/03/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/29/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/29/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/11/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/11/2021 |
| SEWER CREDIT | (¤802.58) | 06/11/2021 |
| SEWER INSPECTION | ¤25.00 | 06/11/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/11/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/11/2021 |
| METER - DEPOSIT | ¤60.00 | 06/11/2021 |
| WATER- TURN ON | ¤25.00 | 06/11/2021 |
| ADMIN FEE | ¤20.00 | 06/11/2021 |
| CONNECTION FEES | ¤1,017.83 | 06/11/2021 |
| BUILDING DISCOUNT 100% | (¤1,069.40) | 06/11/2021 |
| ELECTRIC FEE | ¤184.20 | 06/11/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/11/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/11/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/11/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/11/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/11/2021 |
| MECHANICAL FEE | ¤184.20 | 06/11/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/11/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/11/2021 |
| PLAN CHECK FEE | ¤82.80 | 06/11/2021 |
| PLUMBING FEE | ¤184.20 | 06/11/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤414.00 | 06/11/2021 |
| SITE PLAN 20 | ¤20.00 | 06/11/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/11/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/11/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,408.85 |