Permit #2021051690

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-01620-0120
CONDITIONED SPACE: 1351 sqft
GARAGE: 404 sqft
OPENED PORCH (WITH ROOF) : 120 sqft
OPENED PORCH (WITH ROOF) : 46 sqft
Total Square Footage: 1921 sqft
Block: 01620
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 863-845-6967
Location Address: 67 BIRCHWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/29/2021
NOC: RECORDED
Applicant name: LARRY SHERWIN THOMPSON
Owner: CARPENTER COMPANIES FLORIDA

Address

142 WEST PLATT STREET STE 116

TAMPA, FL 33606

Lot: 0120
Contracted Stated Job Value: ¤140,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

THOMCO OF FLORIDA LLC
Status Location Address State License Number Phone
INACTIVE

6381 ROBERTS RD

KATHLEEN, FL 33849

CGC1513647 (Exp: 08/31/2024) 863-845-6967

Sub Contractors

JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 02/21/2023 FINAL APPROVED PFLANAGAN
Note: LOOKS LIKE THEY ARE FIXING AREA IN FRONT BARE AREAS IN THE BACK LOOKS GOOD ------------------------------------------------------------------------------------------- 2/16/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE RESERVED PARCEL BEHIND YOUR LOT 2) THERE IS A BIG HOLE THAT HAS COME UP IN THE FRONT YARD NEED TO BE FIXED --------------------------------------------------------------- 2/10/2023 - PREVIOUS INSPECTION NOTES 1) NEED CLEAN ALL OVER POURED CONCRETE AND DIRT OUT OF THE CULVERT PIPE 2) NEED TO REMOVE THE DIRT OUT OF THE ROAD SIDE SWALE 3) NEED TO PICK UP ALL TRASH AROUND THE LOT AND IN THE RESERVED PARCEL IN THE BACK 4) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE RESERVED PARCEL
ROW - STORMWATER FINAL 02/16/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) STILL NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE RESERVED PARCEL BEHIND YOUR LOT 2) THERE IS A BIG HOLE THAT HAS COME UP IN THE FRONT YARD NEED TO BE FIXED --------------------------------------------------------------- 2/10/2023 - PREVIOUS INSPECTION NOTES 1) NEED CLEAN ALL OVER POURED CONCRETE AND DIRT OUT OF THE CULVERT PIPE 2) NEED TO REMOVE THE DIRT OUT OF THE ROAD SIDE SWALE 3) NEED TO PICK UP ALL TRASH AROUND THE LOT AND IN THE RESERVED PARCEL IN THE BACK 4) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE RESERVED PARCEL
ROW - STORMWATER FINAL 02/10/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED CLEAN ALL OVER POURED CONCRETE AND DIRT OUT OF THE CULVERT PIPE 2) NEED TO REMOVE THE DIRT OUT OF THE ROAD SIDE SWALE 3) NEED TO PICK UP ALL TRASH AROUND THE LOT AND IN THE RESERVED PARCEL IN THE BACK 4) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE RESERVED PARCEL
U -UTILITY RESIDENTIAL FINAL 02/10/2023 FINAL APPROVED DHANEY
BLD - BUILDING FINAL 02/10/2023 FINAL APPROVED RMARTIN
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/09/2023 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 02/09/2023 APPROVED PFLANAGAN
ROW - FINAL APRON (AFTER POUR) 02/09/2023 APPROVED PFLANAGAN
U-CROSS CONNECTION 01/19/2023 APPROVED DHANEY
ROW- PRE-APRON (PRE-POUR) 12/20/2022 APPROVED EMADISON
Note: ** 12/20/22 READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) ** IN THE EVENT OF RAIN RECHECK CULVERT ELEVATION AND COMPACTION
U - SEWER TIE IN 12/14/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 12/14/2022 APPROVED MGIBSON
ELECTRIC - EARLY POWER 12/08/2022 APPROVED JMUNSON
PEP TANK INSTALLATION REQUEST 10/31/2022 APPROVED CSTONE
INSULATION 10/19/2022 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2420 Front pancake metalic boxes for carrige lights must be bonded Check on insualtion
ALL ROUGH 10/14/2022 APPROVED - AS NOTED MKRASKI
Note: Front pancake metalic boxes for carrige lights must be bonded Check on insualtion
LATH/BRICK/ WATER BARRIER 08/10/2022 APPROVED MKRASKI
ROOF VALLEY & METAL 08/03/2022 APPROVED FWILLIS
ROOF VALLEY & METAL 08/01/2022 CANCELLED BY APPLICANT WEB
WALL SHEATHING 07/26/2022 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/26/2022 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 07/25/2022 APPROVED TBAKER
TIE BEAM / LINTEL 07/06/2022 APPROVED FWILLIS
MONOLITHIC SLAB 06/02/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 05/31/2022 CANCELLED BY APPLICANT FWILLIS
MONOLITHIC SLAB 05/24/2022 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 05/13/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/18/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 01/26/2023 01/26/2023
Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Wrong address
BADMIN INFORMATION 01/18/2023 01/18/2023
Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Termite is wrong address
MECH COMPLETE 11/07/2022 11/07/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 07/25/2022 07/25/2022
Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers
ENGIN1 COMPLETE 07/25/2022 07/25/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/25/2022 07/25/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 HOLD 05/27/2022 05/27/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is not acceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevations of finished concrete foundation/slab.
ZON COMPLETE 05/27/2022 05/27/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/27/2022 05/27/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/28/2021 10/28/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 10/28/2021 11/03/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM Check the site plan water split half to the back and half to the front
ENGIN1 COMPLETE 10/28/2021 10/28/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 10/04/2021 10/04/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan specifies that driveway will be asphalt millings or concrete fines. It must be solid concrete or pavers
SW1 HOLD 10/04/2021 10/12/2021
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See SW-1 Checklist in Attachments. Highlighted items. Also in the Informational Package dated 10/12/21 there is a sample survey of what is required for Storm water review.
ZON HOLD 09/22/2021 09/22/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway
ENGIN1 COMPLETE 09/22/2021 09/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/22/2021 09/29/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 09/08/2021 09/08/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway and driveway Please show rear setback from furthest point back patio to rear property line on site plan/survey
BLD COMPLETE 09/08/2021 09/11/2021
Note: Released By: JPI
ZON HOLD 08/11/2021 08/11/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Site plan must show the width and material of front entry walkway and driveway House layout on landscape plan doesn't match plans and site plan Must have a total of four trees for this lot size Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. Please show rear setback from back patio to property line on site plan/survey
BLD COMPLETE 08/11/2021 08/16/2021
Note: Released By: JPI
ENGIN1 COMPLETE 08/11/2021 08/11/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/11/2021 08/19/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
BLD HOLD 06/24/2021 06/24/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM PLAN REVIEW COMMENT NO. 1 FROM PREVIOUS REVIEW HOLD HAS BEEN REMOVED. PLEASE RESPOND TO REMAINING COMMENT BELOW. 2. Product Approval Spec Sheet provided, and Product Approval #’s provided for on drawings, page PA. Numbers do not match for multiple products. Please review and either provide matching numbers or eliminate one.
BLD HOLD 05/27/2021 05/31/2021
Note: Held By: JPI 1. Please complete quality control on sheet numbering and the sheet uploads. It appears that sheets are mis-numbered and there are sheets missing. 2. Product Approval Spec Sheet provided, and Product Approval #’s provided for on drawings, page PA. Numbers do not match for multiple products. Please review and either provide matching numbers or eliminate one.
CUSVC COMPLETE 05/27/2021 06/04/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 05/27/2021 06/01/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/27/2021 05/27/2021
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
LOCATE COMPLETE 05/27/2021 06/02/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 05/27/2021 05/28/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/27/2021 06/02/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
SWALE COMPLETE 05/27/2021 08/07/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 05/27/2021 06/03/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway and driveway House layout on landscape plan doesn't match plans and site plan Must have a total of four trees for this lot size Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. Please show rear setback from back patio to property line on site plan/survey

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 03/06/2023
CONNECTION FEES ¤60.05 03/06/2023
CONTRACTOR CHANGE ¤20.00 03/06/2023
CONTRACTOR CHANGE ¤20.00 03/06/2023
SW ENG REINSPECTION 20 ¤20.00 03/06/2023
SW ENG REINSPECTION 20 ¤20.00 03/06/2023
SEWER CAPITAL FACILITY ¤275.21 03/06/2023
WATER CAPITAL FACILITY FEE ¤202.05 03/06/2023
WATER CAPITAL FACILITY FEE ¤3,424.45 12/29/2021
STORM WATER PERMIT FEES ¤80.00 12/29/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 12/29/2021
SEWER CREDIT (¤850.00) 12/29/2021
SEWER INSPECTION ¤25.00 12/29/2021
SEWER CAPITAL FACILITY ¤4,664.55 12/29/2021
BUILDING DISCOUNT 100% (¤926.60) 12/29/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 12/29/2021
IMPACT FEE FIRE ¤367.00 12/29/2021
IMPACT FEE PARKS ¤1,199.12 12/29/2021
IMPACT FEE SCHOOL ¤3,600.00 12/29/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 12/29/2021
WATER -IRRIGATION INSPECTION ¤25.00 12/29/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 12/29/2021
NEW RESIDENTIAL INSPECTIONS ¤346.00 12/29/2021
SITE PLAN 20 ¤20.00 12/29/2021
SURCHARGE FS 533.721 ¤2.00 12/29/2021
SURCHARGE - FS 468.631 ¤2.00 12/29/2021
CONNECTION FEES ¤1,017.83 12/29/2021
CONTRACTOR CHANGE ¤40.00 12/29/2021
METER - DEPOSIT ¤60.00 12/29/2021
WATER- TURN ON ¤25.00 12/29/2021
ADMINISTRATIVE RESIDENTIAL ¤20.00 12/29/2021
INSPECTION- ELECTRICAL ¤163.80 12/29/2021
INSPECTION - MECHANICAL ¤163.80 12/29/2021
INSPECTION - PLUMBING ¤163.80 12/29/2021
PLAN REVIEW - RESIDENTIAL ¤69.20 12/29/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,971.24