Permit #2021051698

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7034-01490-0100
CONDITIONED SPACE: 2529 sqft
GARAGE: 601 sqft
OPENED PORCH (WITH ROOF) : 471 sqft
OPENED PORCH (WITH ROOF) : 98 sqft
Total Square Footage: 3699 sqft
Block: 01490
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-237-5837
Location Address: 19 EDITH POPE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/23/2021
NOC: RECORDED
Applicant name: MARSEL GILMANSHIN
Owner: GILMANS DEVELOPMENT CORPORATION

Address

3100 STEEL RAIL STREET

BUNNELL, FL 32110

Address

STE 4

BUNNELL, FL 32110

Lot: 0100
Contracted Stated Job Value: ¤300,000.00
Job Description: Single Family Residence
Type: CN

Contractor

GILMANS DEVELOPMENT CORP
Status Location Address State License Number Phone
ACTIVE

4873 PALM COAST PARKWAY NW #4

PALM COAST, FL 32137

CBC1263180 (Exp: 08/31/2026) 386-237-5837

Sub Contractors

MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
MAXIM BUDNIK
Status Location Address State License Number
ACTIVE

3 WAVECREST PL

PALM COAST, FL 32164

CAC1818445 (Exp: 08/31/2026)
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/12/2023 FINAL APPROVED RMARTIN
Note: 9/12/23 Did this on 9/11/23 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23: 1a). Smoke detector in left front bedroom behind garage is now beeping low battery. 2a). Still missing breaker/heater core label on AHU. (as previously noted on 5/9 & 7/5). Also missing manufacturer's rubber breaker seal over unit breaker (exposing the inside of the unit to condensation, etc,). 3a). Left side bathroom still not sealed behind toilet at wall base as previously noted on 7/5/23. 7/5/2023 - PREVIOUS INSPECTION NOTES 7/5/23: Inspetion now complete!. Previously listed items 1, 3, 6 and 7 remain unresolved. Additionally: 1). Right side hose bibb is missing anti-siphon device. 2). Master bathroom - Waterfall shower head has very low pressure. 3). Left side hall bathroom - area behind the toilet is not sealed & tile is missing grout. 5/9/2023 - PREVIOUS INSPECTION NOTES 5/9/23: INSPECTION STOPPED. HOUSE IS NOT READY! *** Smoke detectors checked & approved. 1). No Address 2). No water 3). AHU heater sticker is not affixed to AHU. (breaker size could not be verified). 4). Garage outlet for sprinkler system has no power. Also, garage door opener outlet - no power. 5). Front entry exterior GFCI outlet box is not secured and/or sealed properly. 6). Permit box is thrown into neighboring wooded lot. 7). No energy calcs on-site.
BLD - BUILDING FINAL 09/06/2023 Disapproved -FEE REQUIRED RSIMS
Note: 9/6/23: 1a). Smoke detector in left front bedroom behind garage is now beeping low battery. 2a). Still missing breaker/heater core label on AHU. (as previously noted on 5/9 & 7/5). Also missing manufacturer's rubber breaker seal over unit breaker (exposing the inside of the unit to condensation, etc,). 3a). Left side bathroom still not sealed behind toilet at wall base as previously noted on 7/5/23. 7/5/2023 - PREVIOUS INSPECTION NOTES 7/5/23: Inspetion now complete!. Previously listed items 1, 3, 6 and 7 remain unresolved. Additionally: 1). Right side hose bibb is missing anti-siphon device. 2). Master bathroom - Waterfall shower head has very low pressure. 3). Left side hall bathroom - area behind the toilet is not sealed & tile is missing grout. 5/9/2023 - PREVIOUS INSPECTION NOTES 5/9/23: INSPECTION STOPPED. HOUSE IS NOT READY! *** Smoke detectors checked & approved. 1). No Address 2). No water 3). AHU heater sticker is not affixed to AHU. (breaker size could not be verified). 4). Garage outlet for sprinkler system has no power. Also, garage door opener outlet - no power. 5). Front entry exterior GFCI outlet box is not secured and/or sealed properly. 6). Permit box is thrown into neighboring wooded lot. 7). No energy calcs on-site.
BLD - BUILDING FINAL 07/05/2023 Disapproved -FEE REQUIRED RSIMS
Note: 7/5/23: Inspetion now complete!. Previously listed items 1, 3, 6 and 7 remain unresolved. Additionally: 1). Right side hose bibb is missing anti-siphon device. 2). Master bathroom - Waterfall shower head has very low pressure. 3). Left side hall bathroom - area behind the toilet is not sealed & tile is missing grout. 5/9/2023 - PREVIOUS INSPECTION NOTES 5/9/23: INSPECTION STOPPED. HOUSE IS NOT READY! *** Smoke detectors checked & approved. 1). No Address 2). No water 3). AHU heater sticker is not affixed to AHU. (breaker size could not be verified). 4). Garage outlet for sprinkler system has no power. Also, garage door opener outlet - no power. 5). Front entry exterior GFCI outlet box is not secured and/or sealed properly. 6). Permit box is thrown into neighboring wooded lot. 7). No energy calcs on-site.
BLD - BUILDING FINAL 05/09/2023 Disapproved -FEE REQUIRED RSIMS
Note: 5/9/23: INSPECTION STOPPED. HOUSE IS NOT READY! *** Smoke detectors checked & approved. 1). No Address 2). No water 3). AHU heater sticker is not affixed to AHU. (breaker size could not be verified). 4). Garage outlet for sprinkler system has no power. Also, garage door opener outlet - no power. 5). Front entry exterior GFCI outlet box is not secured and/or sealed properly. 6). Permit box is thrown into neighboring wooded lot. 7). No energy calcs on-site.
U -UTILITY RESIDENTIAL FINAL 05/09/2023 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 02/17/2023 APPROVED GBERTOLA
Note: 02/17/23=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/24/22 1) NEED TO HAVE SEED AND STRAW ON BARE AREAS ON VACANT LOTS BEHIDE YOU AND TO THE LEFT 2) NEED TO FIX ALL WASH OUTS IN FRONT OF PROPERTY
ROW- PAVER RESTRAINTS 08/24/2022 APPROVED PFLANAGAN
ROW - FINAL APRON (AFTER POUR) 08/24/2022 APPROVED PFLANAGAN
ROW - STORMWATER FINAL 08/24/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 8/24/22 1) NEED TO HAVE SEED AND STRAW ON BARE AREAS ON VACANT LOTS BEHIDE YOU AND TO THE LEFT 2) NEED TO FIX ALL WASH OUTS IN FRONT OF PROPERTY
ROW FIELD SURVEY /GRADING CERTIFICATION 08/05/2022 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 08/05/2022 APPROVED RGROSS
GRAVITY SEWER TEST 07/06/2022 APPROVED MGIBSON
U-CROSS CONNECTION 07/06/2022 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
U - SEWER TIE IN 07/06/2022 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 06/16/2022 APPROVED - AS NOTED PFLANAGAN
Note: 6/16/22 ITS THE CONTRACTOR RESPONSIBILITY TO CHECK CULVERT PIPE ELEVATION BEFORE POURING CONCRETE ------------------------------------------------------------------------------------------------------------------------------- 6/3/22 (1) NEED TO RESUBMIT A NEW SITE PLAN SHOWING THAT THE DRIVEWAY IS A PAVER DRIVEWAY THE SITE PLAN SHOWS THAT YOU SUBMITED TO THE CITY AND THE CITY APPROVED IT IS A CONCRETE DRIVEWAY (2) NEED TO DIG THE PAVER RESTRANTS OUT MORE NEED TO BE 8"X 8"
ROW- PRE-APRON (PRE-POUR) 06/03/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 6/3/22 (1) NEED TO RESUBMIT A NEW SITE PLAN SHOWING THAT THE DRIVEWAY IS A PAVER DRIVEWAY THE SITE PLAN SHOWS THAT YOU SUBMITED TO THE CITY AND THE CITY APPROVED IT IS A CONCRETE DRIVEWAY (2) NEED TO DIG THE PAVER RESTRANTS OUT MORE NEED TO BE 8"X 8"
ELECTRIC - EARLY POWER 06/03/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 8:03 am
PEP TANK INSTALLATION REQUEST 04/20/2022 APPROVED CSTONE
INSULATION 03/24/2022 APPROVED JWALKER
LATH/BRICK/ WATER BARRIER 03/24/2022 APPROVED JWALKER
ALL ROUGH 03/15/2022 APPROVED - AS NOTED JWALKER
Note: THIS IS A REINSPECTION 2/15/22 The ledger board at the front entry carrying the trusses please supply a detail. The bearing wall at the garage still needs to be addressed. All the 29 trusses 30,31,32,33,34,35 Are to have LUS24 hangers at truss 14. One 29 truss strap is not nail 1/28/22 The above listed corrections noted at roof sheating, braces, ties. down cells HAVE NOT BEEN CORRECTED 1- All flex duct laying on ceiling joist need to raised up and supported to allow for insulation fill. 2- The 18" duct at the garage is not attached to the plenum box. 3- All garage outlet brach circuts are to be 20amp and supplied by 12-2 wire. Garage door opener outlet. 4-5' head test not holding water 5-The 1 1/2 PVC vent above laundry room needs to be supported. 6-Tub not installed, Cut out not sealed. 7-Water heater supply lines have not been finished. 8-Missing nail plates at plumbing lines through out the building 9-Please supply installation instruction for rear slider as all fasteners appear to be concealed. 10-Rear door not installed. 11- Front entry door not installed. 12 rear bedroom missing smoke detector outlet box. THIS INSPECTION WAS STOPPED DUE TO NUMEROUS FAILURES. Please have all above corrected, contractor may want to walk job before reinspection to avoid further fees. 3/15/22 The ledger board above the front entry will need to be installed as per the revision detailsl. Leave empty expoxy container on site. Rear slider install instruction will also need to be on site. Insulation inspection will not pass in the 2 listed items are not corrected.
ALL ROUGH 02/28/2022 Disapproved -FEE REQUIRED JWALKER
Note: 2/15/22 The ledger board at the front entry carrying the trusses please supply a detail. The bearing wall at the garage still needs to be addressed. All the 29 trusses 30,31,32,33,34,35 Are to have LUS24 hangers at truss 14. One 29 truss strap is not nail 1/28/22 The above listed corrections noted at roof sheating, braces, ties. down cells HAVE NOT BEEN CORRECTED 1- All flex duct laying on ceiling joist need to raised up and supported to allow for insulation fill. 2- The 18" duct at the garage is not attached to the plenum box. 3- All garage outlet brach circuts are to be 20amp and supplied by 12-2 wire. Garage door opener outlet. 4-5' head test not holding water 5-The 1 1/2 PVC vent above laundry room needs to be supported. 6-Tub not installed, Cut out not sealed. 7-Water heater supply lines have not been finished. 8-Missing nail plates at plumbing lines through out the building 9-Please supply installation instruction for rear slider as all fasteners appear to be concealed. 10-Rear door not installed. 11- Front entry door not installed. 12 rear bedroom missing smoke detector outlet box. THIS INSPECTION WAS STOPPED DUE TO NUMEROUS FAILURES. Please have all above corrected, contractor may want to walk job before reinspection to avoid further fees.
ROOF VALLEY & METAL 02/16/2022 APPROVED RMARTIN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/15/2022 APPROVED - AS NOTED JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION A full set of approved drawings need to be onsite for inspections. Roof sheating passes inspection. To help out the builder, I did an inspection of ties and braces with out approved drawings. 1-Multiple hold down anchors / straps at the truss ends are missing fasteners or proper number of 9 per hold down not installed. 2- Over framing hold downs not fastened or missing at front entry and garage. 3- The 2x8 creating the ridge above the right side shower is not supported and will need blocking added to create a continuos load path. 4-Blocking will need to be installed at the right side of the building where the horizontal laid sheets meet the 2 ply hip truss. 5-Truss 12 is missing engineering. Marked the packet. All other trusses passed engineering install. 6- It appears from the non approved drawing that the bearing wall has not been framed. These are some of the noted failures with out access to approved drawings. Builder may want to inspect site before reinspection. 2/9/22 As listed above a full set of approved drawings. needs to be on site for this inspection. The prints in the box are the same ones from the prior inspection. Please provide appoved set to avoid further fees. Thank you. 2/10/22 The truss drawing supplied is by a WW truss company. The engineering packet is by MITEK truss company. Please provide a truss drawing, appoved and that coresponds with the engineer packet. There are several areas of unnailed roof sheating at the garage. the left back bedroom. the right side of the rear porch. and the front right side hip roof. Suggest a meeting on site with contractor to resolve issues. 2/11/22 Meet with builder on job site. Truss plan will be submitted to building department for approval Sheating needs to be nailed. Over framing straps at garage need nailed. The print calls for bearing wall at garage door entry. Frame as per detail or have engineer submitt a revision for wall as built. 2/15/22 The ledger board at the front entry carrying the trusses please supply a detail. The bearing wall at the garage still needs to be addressed. All the 29 trusses 30,31,32,33,34,35 Are to have LUS24 hangers at truss 14. One 29 truss strap is not nailed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/11/2022 Disapproved - NO FEE JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION A full set of approved drawings need to be onsite for inspections. Roof sheating passes inspection. To help out the builder, I did an inspection of ties and braces with out approved drawings. 1-Multiple hold down anchors / straps at the truss ends are missing fasteners or proper number of 9 per hold down not installed. 2- Over framing hold downs not fastened or missing at front entry and garage. 3- The 2x8 creating the ridge above the right side shower is not supported and will need blocking added to create a continuos load path. 4-Blocking will need to be installed at the right side of the building where the horizontal laid sheets meet the 2 ply hip truss. 5-Truss 12 is missing engineering. Marked the packet. All other trusses passed engineering install. 6- It appears from the non approved drawing that the bearing wall has not been framed. These are some of the noted failures with out access to approved drawings. Builder may want to inspect site before reinspection. 2/9/22 As listed above a full set of approved drawings. needs to be on site for this inspection. The prints in the box are the same ones from the prior inspection. Please provide appoved set to avoid further fees. Thank you. 2/10/22 The truss drawing supplied is by a WW truss company. The engineering packet is by MITEK truss company. Please provide a truss drawing, appoved and that coresponds with the engineer packet. There are several areas of unnailed roof sheating at the garage. the left back bedroom. the right side of the rear porch. and the front right side hip roof. Suggest a meeting on site with contractor to resolve issues. 2/11/22 Meet with builder on job site. Truss plan will be submitted to building department for approval Sheating needs to be nailed. Over framing straps at garage need nailed. The print calls for bearing wall at garage door entry. Frame as per detail or have engineer submitt a revision for wall as built.
ROOF VALLEY & METAL 02/10/2022 Disapproved - NO FEE JWALKER
Note: Due to unailed roof decking. From roof brace. sheating tie downs, The underlayment cannot be approved.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/10/2022 Disapproved - NO FEE JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION A full set of approved drawings need to be onsite for inspections. Roof sheating passes inspection. To help out the builder, I did an inspection of ties and braces with out approved drawings. 1-Multiple hold down anchors / straps at the truss ends are missing fasteners or proper number of 9 per hold down not installed. 2- Over framing hold downs not fastened or missing at front entry and garage. 3- The 2x8 creating the ridge above the right side shower is not supported and will need blocking added to create a continuos load path. 4-Blocking will need to be installed at the right side of the building where the horizontal laid sheets meet the 2 ply hip truss. 5-Truss 12 is missing engineering. Marked the packet. All other trusses passed engineering install. 6- It appears from the non approved drawing that the bearing wall has not been framed. These are some of the noted failures with out access to approved drawings. Builder may want to inspect site before reinspection. 2/9/22 As listed above a full set of approved drawings. needs to be on site for this inspection. The prints in the box are the same ones from the prior inspection. Please provide appoved set to avoid further fees. Thank you. 2/10/22 The truss drawing supplied is by a WW truss company. The engineering packet is by MITEK truss company. Please provide a truss drawing, appoved and that coresponds with the engineer packet. There are several areas of unnailed roof sheating at the garage. the left back bedroom. the right side of the rear porch. and the front right side hip roof. Suggest a meeting on site with contractor to resolve issues.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/09/2022 Disapproved - NO FEE JWALKER
Note: THIS IS A REINSPECTION A full set of approved drawings need to be onsite for inspections. Roof sheating passes inspection. To help out the builder, I did an inspection of ties and braces with out approved drawings. 1-Multiple hold down anchors / straps at the truss ends are missing fasteners or proper number of 9 per hold down not installed. 2- Over framing hold downs not fastened or missing at front entry and garage. 3- The 2x8 creating the ridge above the right side shower is not supported and will need blocking added to create a continuos load path. 4-Blocking will need to be installed at the right side of the building where the horizontal laid sheets meet the 2 ply hip truss. 5-Truss 12 is missing engineering. Marked the packet. All other trusses passed engineering install. 6- It appears from the non approved drawing that the bearing wall has not been framed. These are some of the noted failures with out access to approved drawings. Builder may want to inspect site before reinspection. 2/9/22 As listed above a full set of approved drawings. needs to be on site for this inspection. The prints in the box are the same ones from the prior inspection. Please provide appoved set to avoid further fees. Thank you.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/03/2022 Disapproved -FEE REQUIRED JWALKER
Note: A full set of approved drawings need to be onsite for inspections. Roof sheating passes inspection. To help out the builder, I did an inspection of ties and braces with out approved drawings. 1-Multiple hold down anchors / straps at the truss ends are missing fasteners or proper number of 9 per hold down not installed. 2- Over framing hold downs not fastened or missing at front entry and garage. 3- The 2x8 creating the ridge above the right side shower is not supported and will need blocking added to create a continuos load path. 4-Blocking will need to be installed at the right side of the building where the horizontal laid sheets meet the 2 ply hip truss. 5-Truss 12 is missing engineering. Marked the packet. All other trusses passed engineering install. 6- It appears from the non approved drawing that the bearing wall has not been framed. These are some of the noted failures with out access to approved drawings. Builder may want to inspect site before reinspection.
FOUND SURVEY APPROVED (OFFICE) 02/01/2022 APPROVED TBAKER
ELECTRIC - EARLY POWER 01/31/2022 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 12/09/2021 APPROVED JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Please provide a full set of approved drawings for inspection. 11/16/21 Above listed correction has not been made. 11/17/21 The 8" precast lintels at the rear Lania area. L13 and L12 are not precast. Steel lintels have been installed in place of the precast. Please submitt an engineer revision to the building departmart for the lintel changes. Missing Dowels Rear left sliding door area, and the center rear lania column. The dowel that was drilled at the front window near the toilet room was not drill 6" and was easily removed the rebar also needs to lap a minimum of 25"s. Redrill 6" min. epoxy and install dowel of proper length. Marked missing dowels on print.
TIE BEAM / LINTEL 12/08/2021 CANCELLED BY APPLICANT JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Please provide a full set of approved drawings for inspection. 11/16/21 Above listed correction has not been made. 11/17/21 The 8" precast lintels at the rear Lania area. L13 and L12 are not precast. Steel lintels have been installed in place of the precast. Please submitt an engineer revision to the building departmart for the lintel changes. Missing Dowels Rear left sliding door area, and the center rear lania column. The dowel that was drilled at the front window near the toilet room was not drill 6" and was easily removed the rebar also needs to lap a minimum of 25"s. Redrill 6" min. epoxy and install dowel of proper length. Marked missing dowels on print.
TIE BEAM / LINTEL 11/17/2021 Disapproved - NO FEE JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please provide a full set of approved drawings for inspection. 11/16/21 Above listed correction has not been made. 11/17/21 The 8" precast lintels at the rear Lania area. L13 and L12 are not precast. Steel lintels have been installed in place of the precast. Please submitt an engineer revision to the building departmart for the lintel changes. Missing Dowels Rear left sliding door area, and the center rear lania column. The dowel that was drilled at the front window near the toilet room was not drill 6" and was easily removed the rebar also needs to lap a minimum of 25"s. Redrill 6" min. epoxy and install dowel of proper length. Marked missing dowels on print.
TIE BEAM / LINTEL 11/16/2021 Disapproved -FEE REQUIRED JWALKER
Note: THIS IS A REINSPECTION Please provide a full set of approved drawings for inspection. 11/16/21 Above listed correction has not been made.
TIE BEAM / LINTEL 11/10/2021 Disapproved - NO FEE JWALKER
Note: Please provide a full set of approved drawings for inspection.
MONOLITHIC SLAB 09/30/2021 APPROVED JWALKER
PLUMBING 1ST ROUGH UNDERGROUND 09/02/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 09/02/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 10/31/2022 10/31/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/06/2022 06/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 06/06/2022 06/13/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 06/06/2022 06/06/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/15/2022 03/15/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 02/14/2022 02/15/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/01/2022 02/01/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/01/2022 02/01/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 12/03/2021 12/06/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
BLD HOLD 11/29/2021 11/29/2021
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision : Lintel changes Revision note item 4 with FL 11389.1 cannot be found on Approval Listing. Please verify the FL Number for clarification per F.S. 553.842.
BLD COMPLETE 11/12/2021 11/12/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 11/10/2021 11/10/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. Revised sheet 2 does not have the typical sectional drawing and truss connector schedule. Provide both.
BADMIN HOLD 08/26/2021 08/26/2021
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM MISSING DESCRIPTION OF IMPROVEMENT ON NOC. PLEASE RE-RECORD
BADMIN COMPLETE 08/26/2021 08/26/2021
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
SW1 COMPLETE 06/22/2021 06/22/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
MECH COMPLETE 06/21/2021 06/21/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 06/21/2021 06/21/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 06/17/2021 06/17/2021
Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)
ZON HOLD 06/15/2021 06/16/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM A new site plan/survey with these changes was not submitted... House does not meet the minimum 7.5ft side setback Site plan/survey must show the material and width of the front entry walkway AC and door pad location must be shown on site plan/survey. It can not be located in the 5' utility easement
MECH HOLD 06/15/2021 06/16/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Unable to separate duct layout from Energy Calc packet. Need to resubmit entire Energy Calc packet with duct layout signed by only one contractor. Also duct layout submitted is unreadable
ELEC COMPLETE 06/15/2021 06/16/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 05/27/2021 06/01/2021
Note: Released By: JPI
CUSVC COMPLETE 05/27/2021 06/04/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 05/27/2021 06/01/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Reference the 2017 NEC
ENGIN1 COMPLETE 05/27/2021 05/27/2021
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
LOCATE COMPLETE 05/27/2021 06/02/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 05/27/2021 05/28/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Reference 2020 Florida building code 7Th edition on condenser unit anchors. Not 2017 2. Duct layout is signed by two contractors.
SW1 HOLD 05/27/2021 06/02/2021
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See checklist in attachments highlighted line under Drainage section. Drainage must flow from rear to the front. Proposed indicates rear to the rear.
ZON HOLD 05/27/2021 06/03/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM House does not meet the minimum 7.5ft side setback Site plan/survey must show the material and width of the front entry walkway AC and door pad location must be shown on site plan/survey. It can not be located in the 5' utility easement If screening ac with a fence landscape plan must show the height, color and material of fence Landscape plan show two sod types being used. Please show the specific sod type you are using. Note: if using St.Augustine sod landscape plan must show that irrigation will be installed. Must have a total of 16 foundation plantings. 8 must be in the front and 4 along each side wrapping corners
SWALE COMPLETE 05/27/2021 08/07/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN FEE ¤20.00 06/23/2021
BUILDING DISCOUNT 100% (¤1,581.80) 06/23/2021
ELECTRIC FEE ¤257.40 06/23/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 06/23/2021
IMPACT FEE FIRE ¤367.00 06/23/2021
IMPACT FEE PARKS ¤1,199.12 06/23/2021
IMPACT FEE SCHOOL ¤3,600.00 06/23/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 06/23/2021
MECHANICAL FEE ¤257.40 06/23/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 06/23/2021
PLAN CHECK FEE ¤131.60 06/23/2021
PLUMBING FEE ¤257.40 06/23/2021
NEW RESIDENTIAL INSPECTIONS ¤658.00 06/23/2021
SITE PLAN 20 ¤20.00 06/23/2021
SURCHARGE FS 533.721 ¤2.00 06/23/2021
SURCHARGE - FS 468.631 ¤2.00 06/23/2021
STORM WATER PERMIT FEES ¤80.00 06/23/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 06/23/2021
SEWER CREDIT (¤850.00) 06/15/2021
SEWER INSPECTION ¤25.00 06/15/2021
SEWER CAPITAL FACILITY ¤4,664.55 06/15/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 06/15/2021
METER - DEPOSIT ¤60.00 06/15/2021
WATER- TURN ON ¤25.00 06/15/2021
CONNECTION FEES ¤1,017.83 06/15/2021
WATER -IRRIGATION INSPECTION ¤25.00 06/15/2021
PLAN REVIEW - REVISION ¤32.50
PLAN REVIEW - REVISION ¤32.50
PLAN REVIEW - REVISION ¤32.50
REINSPECTION RESIDENTIAL ¤40.00
REINSPECTION RESIDENTIAL ¤40.00
REINSPECTION RESIDENTIAL ¤40.00
REINSPECTION RESIDENTIAL ¤40.00
REINSPECTION RESIDENTIAL ¤40.00
REINSPECTION RESIDENTIAL ¤40.00
SW ENG REINSPECTION 20 ¤20.00
SW ENG REINSPECTION 30 ¤30.00
Fees Total Due: ¤387.50 Total Paid: ¤15,281.43