Permit #2021051698
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7034-01490-0100 |
| CONDITIONED SPACE: 2529 sqft |
| GARAGE: 601 sqft |
| OPENED PORCH (WITH ROOF) : 471 sqft |
| OPENED PORCH (WITH ROOF) : 98 sqft |
| Total Square Footage: 3699 sqft |
| Block: 01490 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-237-5837 |
| Location Address: 19 EDITH POPE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/23/2021 |
| NOC: RECORDED |
| Applicant name: MARSEL GILMANSHIN |
| Owner: GILMANS DEVELOPMENT CORPORATION |
|
Address 3100 STEEL RAIL STREET BUNNELL, FL 32110 |
|
Address STE 4 BUNNELL, FL 32110 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
GILMANS DEVELOPMENT CORP
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4873 PALM COAST PARKWAY NW #4 PALM COAST, FL 32137 |
CBC1263180 (Exp: 08/31/2026) | 386-237-5837 |
Sub Contractors
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/12/2023 | FINAL APPROVED | RMARTIN |
| Note: 9/12/23 Did this on 9/11/23 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23: 1a). Smoke detector in left front bedroom behind garage is now beeping low battery. 2a). Still missing breaker/heater core label on AHU. (as previously noted on 5/9 & 7/5). Also missing manufacturer's rubber breaker seal over unit breaker (exposing the inside of the unit to condensation, etc,). 3a). Left side bathroom still not sealed behind toilet at wall base as previously noted on 7/5/23. 7/5/2023 - PREVIOUS INSPECTION NOTES 7/5/23: Inspetion now complete!. Previously listed items 1, 3, 6 and 7 remain unresolved. Additionally: 1). Right side hose bibb is missing anti-siphon device. 2). Master bathroom - Waterfall shower head has very low pressure. 3). Left side hall bathroom - area behind the toilet is not sealed & tile is missing grout. 5/9/2023 - PREVIOUS INSPECTION NOTES 5/9/23: INSPECTION STOPPED. HOUSE IS NOT READY! *** Smoke detectors checked & approved. 1). No Address 2). No water 3). AHU heater sticker is not affixed to AHU. (breaker size could not be verified). 4). Garage outlet for sprinkler system has no power. Also, garage door opener outlet - no power. 5). Front entry exterior GFCI outlet box is not secured and/or sealed properly. 6). Permit box is thrown into neighboring wooded lot. 7). No energy calcs on-site. | |||
| BLD - BUILDING FINAL | 09/06/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 9/6/23: 1a). Smoke detector in left front bedroom behind garage is now beeping low battery. 2a). Still missing breaker/heater core label on AHU. (as previously noted on 5/9 & 7/5). Also missing manufacturer's rubber breaker seal over unit breaker (exposing the inside of the unit to condensation, etc,). 3a). Left side bathroom still not sealed behind toilet at wall base as previously noted on 7/5/23. 7/5/2023 - PREVIOUS INSPECTION NOTES 7/5/23: Inspetion now complete!. Previously listed items 1, 3, 6 and 7 remain unresolved. Additionally: 1). Right side hose bibb is missing anti-siphon device. 2). Master bathroom - Waterfall shower head has very low pressure. 3). Left side hall bathroom - area behind the toilet is not sealed & tile is missing grout. 5/9/2023 - PREVIOUS INSPECTION NOTES 5/9/23: INSPECTION STOPPED. HOUSE IS NOT READY! *** Smoke detectors checked & approved. 1). No Address 2). No water 3). AHU heater sticker is not affixed to AHU. (breaker size could not be verified). 4). Garage outlet for sprinkler system has no power. Also, garage door opener outlet - no power. 5). Front entry exterior GFCI outlet box is not secured and/or sealed properly. 6). Permit box is thrown into neighboring wooded lot. 7). No energy calcs on-site. | |||
| BLD - BUILDING FINAL | 07/05/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 7/5/23: Inspetion now complete!. Previously listed items 1, 3, 6 and 7 remain unresolved. Additionally: 1). Right side hose bibb is missing anti-siphon device. 2). Master bathroom - Waterfall shower head has very low pressure. 3). Left side hall bathroom - area behind the toilet is not sealed & tile is missing grout. 5/9/2023 - PREVIOUS INSPECTION NOTES 5/9/23: INSPECTION STOPPED. HOUSE IS NOT READY! *** Smoke detectors checked & approved. 1). No Address 2). No water 3). AHU heater sticker is not affixed to AHU. (breaker size could not be verified). 4). Garage outlet for sprinkler system has no power. Also, garage door opener outlet - no power. 5). Front entry exterior GFCI outlet box is not secured and/or sealed properly. 6). Permit box is thrown into neighboring wooded lot. 7). No energy calcs on-site. | |||
| BLD - BUILDING FINAL | 05/09/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 5/9/23: INSPECTION STOPPED. HOUSE IS NOT READY! *** Smoke detectors checked & approved. 1). No Address 2). No water 3). AHU heater sticker is not affixed to AHU. (breaker size could not be verified). 4). Garage outlet for sprinkler system has no power. Also, garage door opener outlet - no power. 5). Front entry exterior GFCI outlet box is not secured and/or sealed properly. 6). Permit box is thrown into neighboring wooded lot. 7). No energy calcs on-site. | |||
| U -UTILITY RESIDENTIAL FINAL | 05/09/2023 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 02/17/2023 | APPROVED | GBERTOLA |
| Note: 02/17/23=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/24/22 1) NEED TO HAVE SEED AND STRAW ON BARE AREAS ON VACANT LOTS BEHIDE YOU AND TO THE LEFT 2) NEED TO FIX ALL WASH OUTS IN FRONT OF PROPERTY | |||
| ROW- PAVER RESTRAINTS | 08/24/2022 | APPROVED | PFLANAGAN |
| ROW - FINAL APRON (AFTER POUR) | 08/24/2022 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 08/24/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 8/24/22 1) NEED TO HAVE SEED AND STRAW ON BARE AREAS ON VACANT LOTS BEHIDE YOU AND TO THE LEFT 2) NEED TO FIX ALL WASH OUTS IN FRONT OF PROPERTY | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/05/2022 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 08/05/2022 | APPROVED | RGROSS |
| GRAVITY SEWER TEST | 07/06/2022 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 07/06/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| U - SEWER TIE IN | 07/06/2022 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 06/16/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: 6/16/22 ITS THE CONTRACTOR RESPONSIBILITY TO CHECK CULVERT PIPE ELEVATION BEFORE POURING CONCRETE ------------------------------------------------------------------------------------------------------------------------------- 6/3/22 (1) NEED TO RESUBMIT A NEW SITE PLAN SHOWING THAT THE DRIVEWAY IS A PAVER DRIVEWAY THE SITE PLAN SHOWS THAT YOU SUBMITED TO THE CITY AND THE CITY APPROVED IT IS A CONCRETE DRIVEWAY (2) NEED TO DIG THE PAVER RESTRANTS OUT MORE NEED TO BE 8"X 8" | |||
| ROW- PRE-APRON (PRE-POUR) | 06/03/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 6/3/22 (1) NEED TO RESUBMIT A NEW SITE PLAN SHOWING THAT THE DRIVEWAY IS A PAVER DRIVEWAY THE SITE PLAN SHOWS THAT YOU SUBMITED TO THE CITY AND THE CITY APPROVED IT IS A CONCRETE DRIVEWAY (2) NEED TO DIG THE PAVER RESTRANTS OUT MORE NEED TO BE 8"X 8" | |||
| ELECTRIC - EARLY POWER | 06/03/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:03 am | |||
| PEP TANK INSTALLATION REQUEST | 04/20/2022 | APPROVED | CSTONE |
| INSULATION | 03/24/2022 | APPROVED | JWALKER |
| LATH/BRICK/ WATER BARRIER | 03/24/2022 | APPROVED | JWALKER |
| ALL ROUGH | 03/15/2022 | APPROVED - AS NOTED | JWALKER |
| Note: THIS IS A REINSPECTION 2/15/22 The ledger board at the front entry carrying the trusses please supply a detail. The bearing wall at the garage still needs to be addressed. All the 29 trusses 30,31,32,33,34,35 Are to have LUS24 hangers at truss 14. One 29 truss strap is not nail 1/28/22 The above listed corrections noted at roof sheating, braces, ties. down cells HAVE NOT BEEN CORRECTED 1- All flex duct laying on ceiling joist need to raised up and supported to allow for insulation fill. 2- The 18" duct at the garage is not attached to the plenum box. 3- All garage outlet brach circuts are to be 20amp and supplied by 12-2 wire. Garage door opener outlet. 4-5' head test not holding water 5-The 1 1/2 PVC vent above laundry room needs to be supported. 6-Tub not installed, Cut out not sealed. 7-Water heater supply lines have not been finished. 8-Missing nail plates at plumbing lines through out the building 9-Please supply installation instruction for rear slider as all fasteners appear to be concealed. 10-Rear door not installed. 11- Front entry door not installed. 12 rear bedroom missing smoke detector outlet box. THIS INSPECTION WAS STOPPED DUE TO NUMEROUS FAILURES. Please have all above corrected, contractor may want to walk job before reinspection to avoid further fees. 3/15/22 The ledger board above the front entry will need to be installed as per the revision detailsl. Leave empty expoxy container on site. Rear slider install instruction will also need to be on site. Insulation inspection will not pass in the 2 listed items are not corrected. | |||
| ALL ROUGH | 02/28/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 2/15/22 The ledger board at the front entry carrying the trusses please supply a detail. The bearing wall at the garage still needs to be addressed. All the 29 trusses 30,31,32,33,34,35 Are to have LUS24 hangers at truss 14. One 29 truss strap is not nail 1/28/22 The above listed corrections noted at roof sheating, braces, ties. down cells HAVE NOT BEEN CORRECTED 1- All flex duct laying on ceiling joist need to raised up and supported to allow for insulation fill. 2- The 18" duct at the garage is not attached to the plenum box. 3- All garage outlet brach circuts are to be 20amp and supplied by 12-2 wire. Garage door opener outlet. 4-5' head test not holding water 5-The 1 1/2 PVC vent above laundry room needs to be supported. 6-Tub not installed, Cut out not sealed. 7-Water heater supply lines have not been finished. 8-Missing nail plates at plumbing lines through out the building 9-Please supply installation instruction for rear slider as all fasteners appear to be concealed. 10-Rear door not installed. 11- Front entry door not installed. 12 rear bedroom missing smoke detector outlet box. THIS INSPECTION WAS STOPPED DUE TO NUMEROUS FAILURES. Please have all above corrected, contractor may want to walk job before reinspection to avoid further fees. | |||
| ROOF VALLEY & METAL | 02/16/2022 | APPROVED | RMARTIN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/15/2022 | APPROVED - AS NOTED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION A full set of approved drawings need to be onsite for inspections. Roof sheating passes inspection. To help out the builder, I did an inspection of ties and braces with out approved drawings. 1-Multiple hold down anchors / straps at the truss ends are missing fasteners or proper number of 9 per hold down not installed. 2- Over framing hold downs not fastened or missing at front entry and garage. 3- The 2x8 creating the ridge above the right side shower is not supported and will need blocking added to create a continuos load path. 4-Blocking will need to be installed at the right side of the building where the horizontal laid sheets meet the 2 ply hip truss. 5-Truss 12 is missing engineering. Marked the packet. All other trusses passed engineering install. 6- It appears from the non approved drawing that the bearing wall has not been framed. These are some of the noted failures with out access to approved drawings. Builder may want to inspect site before reinspection. 2/9/22 As listed above a full set of approved drawings. needs to be on site for this inspection. The prints in the box are the same ones from the prior inspection. Please provide appoved set to avoid further fees. Thank you. 2/10/22 The truss drawing supplied is by a WW truss company. The engineering packet is by MITEK truss company. Please provide a truss drawing, appoved and that coresponds with the engineer packet. There are several areas of unnailed roof sheating at the garage. the left back bedroom. the right side of the rear porch. and the front right side hip roof. Suggest a meeting on site with contractor to resolve issues. 2/11/22 Meet with builder on job site. Truss plan will be submitted to building department for approval Sheating needs to be nailed. Over framing straps at garage need nailed. The print calls for bearing wall at garage door entry. Frame as per detail or have engineer submitt a revision for wall as built. 2/15/22 The ledger board at the front entry carrying the trusses please supply a detail. The bearing wall at the garage still needs to be addressed. All the 29 trusses 30,31,32,33,34,35 Are to have LUS24 hangers at truss 14. One 29 truss strap is not nailed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/11/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION A full set of approved drawings need to be onsite for inspections. Roof sheating passes inspection. To help out the builder, I did an inspection of ties and braces with out approved drawings. 1-Multiple hold down anchors / straps at the truss ends are missing fasteners or proper number of 9 per hold down not installed. 2- Over framing hold downs not fastened or missing at front entry and garage. 3- The 2x8 creating the ridge above the right side shower is not supported and will need blocking added to create a continuos load path. 4-Blocking will need to be installed at the right side of the building where the horizontal laid sheets meet the 2 ply hip truss. 5-Truss 12 is missing engineering. Marked the packet. All other trusses passed engineering install. 6- It appears from the non approved drawing that the bearing wall has not been framed. These are some of the noted failures with out access to approved drawings. Builder may want to inspect site before reinspection. 2/9/22 As listed above a full set of approved drawings. needs to be on site for this inspection. The prints in the box are the same ones from the prior inspection. Please provide appoved set to avoid further fees. Thank you. 2/10/22 The truss drawing supplied is by a WW truss company. The engineering packet is by MITEK truss company. Please provide a truss drawing, appoved and that coresponds with the engineer packet. There are several areas of unnailed roof sheating at the garage. the left back bedroom. the right side of the rear porch. and the front right side hip roof. Suggest a meeting on site with contractor to resolve issues. 2/11/22 Meet with builder on job site. Truss plan will be submitted to building department for approval Sheating needs to be nailed. Over framing straps at garage need nailed. The print calls for bearing wall at garage door entry. Frame as per detail or have engineer submitt a revision for wall as built. | |||
| ROOF VALLEY & METAL | 02/10/2022 | Disapproved - NO FEE | JWALKER |
| Note: Due to unailed roof decking. From roof brace. sheating tie downs, The underlayment cannot be approved. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/10/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION A full set of approved drawings need to be onsite for inspections. Roof sheating passes inspection. To help out the builder, I did an inspection of ties and braces with out approved drawings. 1-Multiple hold down anchors / straps at the truss ends are missing fasteners or proper number of 9 per hold down not installed. 2- Over framing hold downs not fastened or missing at front entry and garage. 3- The 2x8 creating the ridge above the right side shower is not supported and will need blocking added to create a continuos load path. 4-Blocking will need to be installed at the right side of the building where the horizontal laid sheets meet the 2 ply hip truss. 5-Truss 12 is missing engineering. Marked the packet. All other trusses passed engineering install. 6- It appears from the non approved drawing that the bearing wall has not been framed. These are some of the noted failures with out access to approved drawings. Builder may want to inspect site before reinspection. 2/9/22 As listed above a full set of approved drawings. needs to be on site for this inspection. The prints in the box are the same ones from the prior inspection. Please provide appoved set to avoid further fees. Thank you. 2/10/22 The truss drawing supplied is by a WW truss company. The engineering packet is by MITEK truss company. Please provide a truss drawing, appoved and that coresponds with the engineer packet. There are several areas of unnailed roof sheating at the garage. the left back bedroom. the right side of the rear porch. and the front right side hip roof. Suggest a meeting on site with contractor to resolve issues. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/09/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION A full set of approved drawings need to be onsite for inspections. Roof sheating passes inspection. To help out the builder, I did an inspection of ties and braces with out approved drawings. 1-Multiple hold down anchors / straps at the truss ends are missing fasteners or proper number of 9 per hold down not installed. 2- Over framing hold downs not fastened or missing at front entry and garage. 3- The 2x8 creating the ridge above the right side shower is not supported and will need blocking added to create a continuos load path. 4-Blocking will need to be installed at the right side of the building where the horizontal laid sheets meet the 2 ply hip truss. 5-Truss 12 is missing engineering. Marked the packet. All other trusses passed engineering install. 6- It appears from the non approved drawing that the bearing wall has not been framed. These are some of the noted failures with out access to approved drawings. Builder may want to inspect site before reinspection. 2/9/22 As listed above a full set of approved drawings. needs to be on site for this inspection. The prints in the box are the same ones from the prior inspection. Please provide appoved set to avoid further fees. Thank you. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/03/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: A full set of approved drawings need to be onsite for inspections. Roof sheating passes inspection. To help out the builder, I did an inspection of ties and braces with out approved drawings. 1-Multiple hold down anchors / straps at the truss ends are missing fasteners or proper number of 9 per hold down not installed. 2- Over framing hold downs not fastened or missing at front entry and garage. 3- The 2x8 creating the ridge above the right side shower is not supported and will need blocking added to create a continuos load path. 4-Blocking will need to be installed at the right side of the building where the horizontal laid sheets meet the 2 ply hip truss. 5-Truss 12 is missing engineering. Marked the packet. All other trusses passed engineering install. 6- It appears from the non approved drawing that the bearing wall has not been framed. These are some of the noted failures with out access to approved drawings. Builder may want to inspect site before reinspection. | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/01/2022 | APPROVED | TBAKER |
| ELECTRIC - EARLY POWER | 01/31/2022 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 12/09/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Please provide a full set of approved drawings for inspection. 11/16/21 Above listed correction has not been made. 11/17/21 The 8" precast lintels at the rear Lania area. L13 and L12 are not precast. Steel lintels have been installed in place of the precast. Please submitt an engineer revision to the building departmart for the lintel changes. Missing Dowels Rear left sliding door area, and the center rear lania column. The dowel that was drilled at the front window near the toilet room was not drill 6" and was easily removed the rebar also needs to lap a minimum of 25"s. Redrill 6" min. epoxy and install dowel of proper length. Marked missing dowels on print. | |||
| TIE BEAM / LINTEL | 12/08/2021 | CANCELLED BY APPLICANT | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Please provide a full set of approved drawings for inspection. 11/16/21 Above listed correction has not been made. 11/17/21 The 8" precast lintels at the rear Lania area. L13 and L12 are not precast. Steel lintels have been installed in place of the precast. Please submitt an engineer revision to the building departmart for the lintel changes. Missing Dowels Rear left sliding door area, and the center rear lania column. The dowel that was drilled at the front window near the toilet room was not drill 6" and was easily removed the rebar also needs to lap a minimum of 25"s. Redrill 6" min. epoxy and install dowel of proper length. Marked missing dowels on print. | |||
| TIE BEAM / LINTEL | 11/17/2021 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please provide a full set of approved drawings for inspection. 11/16/21 Above listed correction has not been made. 11/17/21 The 8" precast lintels at the rear Lania area. L13 and L12 are not precast. Steel lintels have been installed in place of the precast. Please submitt an engineer revision to the building departmart for the lintel changes. Missing Dowels Rear left sliding door area, and the center rear lania column. The dowel that was drilled at the front window near the toilet room was not drill 6" and was easily removed the rebar also needs to lap a minimum of 25"s. Redrill 6" min. epoxy and install dowel of proper length. Marked missing dowels on print. | |||
| TIE BEAM / LINTEL | 11/16/2021 | Disapproved -FEE REQUIRED | JWALKER |
| Note: THIS IS A REINSPECTION Please provide a full set of approved drawings for inspection. 11/16/21 Above listed correction has not been made. | |||
| TIE BEAM / LINTEL | 11/10/2021 | Disapproved - NO FEE | JWALKER |
| Note: Please provide a full set of approved drawings for inspection. | |||
| MONOLITHIC SLAB | 09/30/2021 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/02/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 09/02/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/31/2022 | 10/31/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/06/2022 | 06/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/06/2022 | 06/13/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/06/2022 | 06/06/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/15/2022 | 03/15/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/14/2022 | 02/15/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/01/2022 | 02/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/01/2022 | 02/01/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/03/2021 | 12/06/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/29/2021 | 11/29/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision : Lintel changes Revision note item 4 with FL 11389.1 cannot be found on Approval Listing. Please verify the FL Number for clarification per F.S. 553.842. | |||
| BLD | COMPLETE | 11/12/2021 | 11/12/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/10/2021 | 11/10/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. Revised sheet 2 does not have the typical sectional drawing and truss connector schedule. Provide both. | |||
| BADMIN | HOLD | 08/26/2021 | 08/26/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM MISSING DESCRIPTION OF IMPROVEMENT ON NOC. PLEASE RE-RECORD | |||
| BADMIN | COMPLETE | 08/26/2021 | 08/26/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/22/2021 | 06/22/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/21/2021 | 06/21/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/21/2021 | 06/21/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/17/2021 | 06/17/2021 |
| Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) | |||
| ZON | HOLD | 06/15/2021 | 06/16/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM A new site plan/survey with these changes was not submitted... House does not meet the minimum 7.5ft side setback Site plan/survey must show the material and width of the front entry walkway AC and door pad location must be shown on site plan/survey. It can not be located in the 5' utility easement | |||
| MECH | HOLD | 06/15/2021 | 06/16/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Unable to separate duct layout from Energy Calc packet. Need to resubmit entire Energy Calc packet with duct layout signed by only one contractor. Also duct layout submitted is unreadable | |||
| ELEC | COMPLETE | 06/15/2021 | 06/16/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/27/2021 | 06/01/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/27/2021 | 06/04/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 05/27/2021 | 06/01/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Reference the 2017 NEC | |||
| ENGIN1 | COMPLETE | 05/27/2021 | 05/27/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/27/2021 | 06/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/27/2021 | 05/28/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Reference 2020 Florida building code 7Th edition on condenser unit anchors. Not 2017 2. Duct layout is signed by two contractors. | |||
| SW1 | HOLD | 05/27/2021 | 06/02/2021 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See checklist in attachments highlighted line under Drainage section. Drainage must flow from rear to the front. Proposed indicates rear to the rear. | |||
| ZON | HOLD | 05/27/2021 | 06/03/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM House does not meet the minimum 7.5ft side setback Site plan/survey must show the material and width of the front entry walkway AC and door pad location must be shown on site plan/survey. It can not be located in the 5' utility easement If screening ac with a fence landscape plan must show the height, color and material of fence Landscape plan show two sod types being used. Please show the specific sod type you are using. Note: if using St.Augustine sod landscape plan must show that irrigation will be installed. Must have a total of 16 foundation plantings. 8 must be in the front and 4 along each side wrapping corners | |||
| SWALE | COMPLETE | 05/27/2021 | 08/07/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 06/23/2021 |
| BUILDING DISCOUNT 100% | (¤1,581.80) | 06/23/2021 |
| ELECTRIC FEE | ¤257.40 | 06/23/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/23/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/23/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/23/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/23/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/23/2021 |
| MECHANICAL FEE | ¤257.40 | 06/23/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/23/2021 |
| PLAN CHECK FEE | ¤131.60 | 06/23/2021 |
| PLUMBING FEE | ¤257.40 | 06/23/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤658.00 | 06/23/2021 |
| SITE PLAN 20 | ¤20.00 | 06/23/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/23/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/23/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/23/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/23/2021 |
| SEWER CREDIT | (¤850.00) | 06/15/2021 |
| SEWER INSPECTION | ¤25.00 | 06/15/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/15/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/15/2021 |
| METER - DEPOSIT | ¤60.00 | 06/15/2021 |
| WATER- TURN ON | ¤25.00 | 06/15/2021 |
| CONNECTION FEES | ¤1,017.83 | 06/15/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/15/2021 |
| PLAN REVIEW - REVISION | ¤32.50 | |
| PLAN REVIEW - REVISION | ¤32.50 | |
| PLAN REVIEW - REVISION | ¤32.50 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| SW ENG REINSPECTION 20 | ¤20.00 | |
| SW ENG REINSPECTION 30 | ¤30.00 | |
| Fees | Total Due: ¤387.50 | Total Paid: ¤15,281.43 |