Permit #2021051699
Permit Details
Status: COED
| Parcel Id: 07-11-31-7031-00390-0040 |
| CONDITIONED SPACE: 1691 sqft |
| GARAGE: 683 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| OPENED PORCH (WITH ROOF) : 22 sqft |
| Total Square Footage: 2508 sqft |
| Block: 00390 |
| Subdivision: 2166 - SECTION 31-ROYAL PALMS |
| Job Phone: 863-845-6967 |
| Location Address: 7 RICHLAND LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/01/2022 |
| NOC: RECORDED |
| Applicant name: LARRY SHERWIN THOMPSON |
| Owner: CARPENTER COMPANIES FLORIDA |
|
Address 142 WEST PLATT STREET STE 116 TAMPA, FL 33606 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
THOMCO OF FLORIDA LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
6381 ROBERTS RD KATHLEEN, FL 33849 |
CGC1513647 (Exp: 08/31/2024) | 863-845-6967 |
Sub Contractors
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/04/2023 | FINAL APPROVED | JWALKER |
| Note: 8/2/2023 - PREVIOUS INSPECTION NOTES 8/2/23 1. Garage door bucks missing anchors 2. Garage ceiling penitrations need to be sealed 3. 2'' conduit going into soffit needs to be sealed holes to large 4. ODU missing 4 tie downs on each corner 5. T stat wire in AHU closet needs to be sealed at drywall 6. Light require on lani 7/20/2023 - PREVIOUS INSPECTION NOTES 1. Heat pump anchor not intstalled at the 4 sides. 2. Exterior outlet near the heat pump is missing weather proof cover. 3. Holes in garage wall near the water heater need to be fixed. 4. Energy calculations do not match the units installed. Inspection was stopped a full reinspection will need to be done. Contractor please do a walk through and check all needed final inspection items before calling for a reinspection to avoid further fees. | |||
| BLD - BUILDING FINAL | 08/02/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 8/2/23 1. Garage door bucks missing anchors 2. Garage ceiling penitrations need to be sealed 3. 2'' conduit going into soffit needs to be sealed holes to large 4. ODU missing 4 tie downs on each corner 5. T stat wire in AHU closet needs to be sealed at drywall 6. Light require on lani 7/20/2023 - PREVIOUS INSPECTION NOTES 1. Heat pump anchor not intstalled at the 4 sides. 2. Exterior outlet near the heat pump is missing weather proof cover. 3. Holes in garage wall near the water heater need to be fixed. 4. Energy calculations do not match the units installed. Inspection was stopped a full reinspection will need to be done. Contractor please do a walk through and check all needed final inspection items before calling for a reinspection to avoid further fees. | |||
| ROW - STORMWATER FINAL | 08/02/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. -------------------------------------------------------------------------------------- 7/19/2023 - PREVIOUS INSPECTION NOTES 07/20/23 NEED TO CLEAN OUT BOTH CULVERT ENDS THEY ARE FULL OF DIRT AND SILT BEFORE ROW FINAL WILL BE PASSED. I WILL NOT FEE YOU TODAY AS I WAS HERE FOR TWO OTHER INSPECTIONS. PLEASE MAKE CORRECTION BEFORE RESUBMITTING. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/20/2023 | FINAL APPROVED | LFITZGERALD |
| Note: 7/19/2023 - PREVIOUS INSPECTION NOTES need access to garage foe pep circuit breaker inspect | |||
| BLD - BUILDING FINAL | 07/20/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. Heat pump anchor not intstalled at the 4 sides. 2. Exterior outlet near the heat pump is missing weather proof cover. 3. Holes in garage wall near the water heater need to be fixed. 4. Energy calculations do not match the units installed. Inspection was stopped a full reinspection will need to be done. Contractor please do a walk through and check all needed final inspection items before calling for a reinspection to avoid further fees. | |||
| ROW - FINAL APRON (AFTER POUR) | 07/19/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 07/20/23 SHOT PIPE IT IS SAME AS FINAL SURVEY 6.59 LEFT INV 6.55 RIGHT INVERT. CUTS ARE MADE. CULVERT ENDS NEEDS CLEANING OT BEFORE ROW FINAL PASSAGE LOOKED GOOD AT THE TIME OF THIS INSPECTION. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/19/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: need access to garage foe pep circuit breaker inspect | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/19/2023 | APPROVED | FSLADISH |
| Note: 07/20/23 UPON WALKING PROPERTY WITH GRASS MOWED IT APPEARS AS IF DRAINAGE WILL WORK. MEETS CITY OF PALM COAST MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION. ___________________________________________________________________________________________________________________________ 7/18/2023 - PREVIOUS INSPECTION NOTES 07/18/23 PROPERTY NEEDS TO BE MOWED SO THAT WE CAN DETERMINE IF DRAINAGE IS GOING WORK. SWALE AREA ALSO, NEED TO DETERMINE IF IT IS FLOWING CORRECTLY. | |||
| ROW - STORMWATER FINAL | 07/19/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 07/20/23 NEED TO CLEAN OUT BOTH CULVERT ENDS THEY ARE FULL OF DIRT AND SILT BEFORE ROW FINAL WILL BE PASSED. I WILL NOT FEE YOU TODAY AS I WAS HERE FOR TWO OTHER INSPECTIONS. PLEASE MAKE CORRECTION BEFORE RESUBMITTING. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/18/2023 | APPROVED | FSLADISH |
| Note: 07/18/23 CULVERT PIPE ELEVATION NOW WITHIN TOLERANCE AND SHOWING CORRECT FLOW ON SURVEY. __________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 MAYBE IT IS JUST A TYPO, I'M NOT SURE BUT NOW YOU HAVE THE CULVERT INVERT FLOWING THE WRONG WAY. THE FLOW IS SHOWN IN THE SWALE PLAN LEFT TO RIGHT. YOU ARE SHOWING 26.49-26.55. PREVIOUS SURVEY SHOT 26.59-26.38 WAS THE PREVIOUS LISTED SHOT. MAYBE IT IS 26.59-26.55? I DO NOT KNOW BUT IT IS STILL NOT CORRECT. I AM NOT GOING TO FEE YOU, PLEASE DETERMINE THE CORRECT ELEVATION SHOTS FOR THIS CULVERT. ________________________________________________________________________________________________________________________ 7/12/2023 - PREVIOUS INSPECTION NOTES 07/12/23 THE CULVERT PIPE INVERT IS OUT OF TOLERANCE BY MORE THAN A .10 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ______________________________________________________________________________________________________________________ 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) MISSING THOSE ELEVATION ON THE LEFT SIDE CORNER OF THE HOUSE IS RUNNING FLAT 28.7 AT THE CORNER OF THE HOUSE AND ON THE MIDDLE OF THE REAR YARD IS 28.7 ALSO Existing interior elevations on a 20’ grid. (E) FOR THE FIELD SERVICE NEED TO MOW THE LAWN | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/18/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 07/18/23 PROPERTY NEEDS TO BE MOWED SO THAT WE CAN DETERMINE IF DRAINAGE IS GOING WORK. SWALE AREA ALSO, NEED TO DETERMINE IF IT IS FLOWING CORRECTLY. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/17/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 07/17/23 MAYBE IT IS JUST A TYPO, I'M NOT SURE BUT NOW YOU HAVE THE CULVERT INVERT FLOWING THE WRONG WAY. THE FLOW IS SHOWN IN THE SWALE PLAN LEFT TO RIGHT. YOU ARE SHOWING 26.49-26.55. PREVIOUS SURVEY SHOT 26.59-26.38 WAS THE PREVIOUS LISTED SHOT. MAYBE IT IS 26.59-26.55? I DO NOT KNOW BUT IT IS STILL NOT CORRECT. I AM NOT GOING TO FEE YOU, PLEASE DETERMINE THE CORRECT ELEVATION SHOTS FOR THIS CULVERT. ________________________________________________________________________________________________________________________ 7/12/2023 - PREVIOUS INSPECTION NOTES 07/12/23 THE CULVERT PIPE INVERT IS OUT OF TOLERANCE BY MORE THAN A .10 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ______________________________________________________________________________________________________________________ 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) MISSING THOSE ELEVATION ON THE LEFT SIDE CORNER OF THE HOUSE IS RUNNING FLAT 28.7 AT THE CORNER OF THE HOUSE AND ON THE MIDDLE OF THE REAR YARD IS 28.7 ALSO Existing interior elevations on a 20’ grid. (E) FOR THE FIELD SERVICE NEED TO MOW THE LAWN | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/12/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 07/12/23 THE CULVERT PIPE INVERT IS OUT OF TOLERANCE BY MORE THAN A .10 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ______________________________________________________________________________________________________________________ 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) MISSING THOSE ELEVATION ON THE LEFT SIDE CORNER OF THE HOUSE IS RUNNING FLAT 28.7 AT THE CORNER OF THE HOUSE AND ON THE MIDDLE OF THE REAR YARD IS 28.7 ALSO Existing interior elevations on a 20’ grid. (E) FOR THE FIELD SERVICE NEED TO MOW THE LAWN | |||
| U-CROSS CONNECTION | 07/11/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB installed-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/21/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 06/21/23= Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) MISSING THOSE ELEVATION ON THE LEFT SIDE CORNER OF THE HOUSE IS RUNNING FLAT 28.7 AT THE CORNER OF THE HOUSE AND ON THE MIDDLE OF THE REAR YARD IS 28.7 ALSO Existing interior elevations on a 20’ grid. (E) FOR THE FIELD SERVICE NEED TO MOW THE LAWN | |||
| ELECTRIC - EARLY POWER | 04/21/2023 | APPROVED | JWALKER |
| U - SEWER TIE IN | 04/13/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 4/11/2023 - PREVIOUS INSPECTION NOTES Work has been covered up, but may have been seen by prior nspection. Call back in for 04/12/2023.TS this w2as a virtual inspection | |||
| U - SEWER TIE IN | 04/11/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Work has been covered up, but may have been seen by prior nspection. Call back in for 04/12/2023.TS | |||
| ROW- PRE-APRON (PRE-POUR) | 04/06/2023 | APPROVED | FSLADISH |
| Note: 04/06/23 CORRECTIONS MADE. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 4/3/2023 - PREVIOUS INSPECTION NOTES 04/03/23 CULVERT PIPE NEEDS TO BE INSTALLED 8 FT FROM FORM BOARD ROAD EDGE. SEE ATTACHED PHOTO FOR REFERENCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/03/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 04/03/23 CULVERT PIPE NEEDS TO BE INSTALLED 8 FT FROM FORM BOARD ROAD EDGE. SEE ATTACHED PHOTO FOR REFERENCE. | |||
| PEP TANK INSTALLATION REQUEST | 03/13/2023 | APPROVED | TSCHWEERS |
| INSULATION | 01/12/2023 | APPROVED | JWALKER |
| Note: 1/10/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 New inspection due to canceled inspection 12/13/2022 - PREVIOUS INSPECTION NOTES 4. Install nail plates at multiple areas where wiring is passing through 2 x framing. Minimum distance from edge of stud is 1 1/4". Less than requires a nail plate. 5. Please have appoved duct layout drawing onsite. 12/15/22 1.The above listed have not yet been corrected Please do not cover up the wire at the top of the garage wall with insulation as some of the missing nail plates need to be installed. Check all interior walls top plated for nail plates. 2. Have the approved duct layout onsite. Please have the two items completed before insulation inspection to avoid fees and delays. 1/10/23 Duct drawing not in the job box or in the building. | |||
| INSULATION | 01/10/2023 | Disapproved - NO FEE | JWALKER |
| Note: Inspector Notes from Inspection 2420 New inspection due to canceled inspection 12/13/2022 - PREVIOUS INSPECTION NOTES 4. Install nail plates at multiple areas where wiring is passing through 2 x framing. Minimum distance from edge of stud is 1 1/4". Less than requires a nail plate. 5. Please have appoved duct layout drawing onsite. 12/15/22 1.The above listed have not yet been corrected Please do not cover up the wire at the top of the garage wall with insulation as some of the missing nail plates need to be installed. Check all interior walls top plated for nail plates. 2. Have the approved duct layout onsite. Please have the two items completed before insulation inspection to avoid fees and delays. 1/10/23 Duct drawing not in the job box or in the building. | |||
| ALL ROUGH | 12/15/2022 | CANCELLED BY APPLICANT | WEB |
| Note: 12/13/2022 - PREVIOUS INSPECTION NOTES 1. 5' DWV head test not holding water. 2. Seal dryer duct fitting. 3. The service wire needs to be pulled down where it is contacting the roof decking and secured to prevent roof nails from penetrating the wire. 4. Install nail plates at multiple areas where wiring is passing through 2 x framing. Minimum distance from edge of stud is 1 1/4". Less than requires a nail plate. 5. Please have appoved duct layout drawing onsite. | |||
| ALL ROUGH | 12/15/2022 | APPROVED - AS NOTED | JWALKER |
| Note: New inspection due to canceled inspection 12/13/2022 - PREVIOUS INSPECTION NOTES 4. Install nail plates at multiple areas where wiring is passing through 2 x framing. Minimum distance from edge of stud is 1 1/4". Less than requires a nail plate. 5. Please have appoved duct layout drawing onsite. 12/15/22 1.The above listed have not yet been corrected Please do not cover up the wire at the top of the garage wall with insulation as some of the missing nail plates need to be installed. Check all interior walls top plated for nail plates. 2. Have the approved duct layout onsite. Please have the two items completed before insulation inspection to avoid fees and delays. | |||
| ALL ROUGH | 12/13/2022 | Disapproved - NO FEE | JWALKER |
| Note: 1. 5' DWV head test not holding water. 2. Seal dryer duct fitting. 3. The service wire needs to be pulled down where it is contacting the roof decking and secured to prevent roof nails from penetrating the wire. 4. Install nail plates at multiple areas where wiring is passing through 2 x framing. Minimum distance from edge of stud is 1 1/4". Less than requires a nail plate. 5. Please have appoved duct layout drawing onsite. | |||
| LATH/BRICK/ WATER BARRIER | 12/13/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/15/2022 | APPROVED | RMARTIN |
| ROOF VALLEY & METAL | 11/09/2022 | APPROVED | JWALKER |
| Note: 10/27/2022 - PREVIOUS INSPECTION NOTES 10/26/2022 - PREVIOUS INSPECTION NOTES 10/26/22 No one onsite, No call. No text. Contractor please call the moring of the reinspection to set up a time to meet on site. 10/27/22 Upon demo inspection where shingles were removed to expose the synthetic underlayment. The contractor did not install the required 12" o.c. field nailing. 4 areas were checked. 2 at the right side roof, 1 at the rear roof, and 1 at the left side roof. All Shingles and under layment will need to be removed from entire roof New underlayment will need to be installed. | |||
| ROOF VALLEY & METAL | 10/27/2022 | Disapproved - NO FEE | JWALKER |
| Note: 10/26/2022 - PREVIOUS INSPECTION NOTES 10/26/22 No one onsite, No call. No text. Contractor please call the moring of the reinspection to set up a time to meet on site. 10/27/22 Upon demo inspection where shingles were removed to expose the synthetic underlayment. The contractor did not install the required 12" o.c. field nailing. 4 areas were checked. 2 at the right side roof, 1 at the rear roof, and 1 at the left side roof. All Shingles and under layment will need to be removed from entire roof New underlayment will need to be installed. | |||
| ROOF VALLEY & METAL | 10/26/2022 | Disapproved - NO FEE | JWALKER |
| Note: 10/26/22 No one onsite, No call. No text. Contractor please call the moring of the reinspection to set up a time to meet on site. | |||
| ROOF VALLEY & METAL | 10/21/2022 | Disapproved - NO FEE | JWALKER |
| Note: Shingles have been installed. A demo inspection will need to be set up. Please contact inspection the day reispection is set up for time to meet on job site. | |||
| ROOF SHEATHING | 10/04/2022 | APPROVED | KSANDOE |
| WALL SHEATHING | 10/04/2022 | APPROVED | KSANDOE |
| TIE BEAM / LINTEL | 09/20/2022 | APPROVED | JWALKER |
| Note: 9/19/2022 - PREVIOUS INSPECTION NOTES Please have a full set of approved drawings onsite for inspections. Lintels were checked for rebar. Check prints for any doubled areas. | |||
| TIE BEAM / LINTEL | 09/19/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: Please have a full set of approved drawings onsite for inspections. Lintels were checked for rebar. Check prints for any doubled areas. | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/26/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/24/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Compaction test results are not posted. 4 of the footing pads detail F 2.5 on the foundation drawings have not been install / missing rebar. Marked the drawing to assist the contractor. | |||
| MONOLITHIC SLAB | 06/22/2022 | Disapproved - NO FEE | JWALKER |
| Note: Compaction test results are not posted. 4 of the footing pads detail F 2.5 on the foundation drawings have not been install / missing rebar. Marked the drawing to assist the contractor. | |||
| MONOLITHIC SLAB | 06/17/2022 | CANCELLED BY APPLICANT | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/15/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 06/15/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 04/08/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 07/17/2023 | 07/17/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FINAL SURVEY.PDF | |||
| BADMIN | INFORMATION | 07/17/2023 | 07/17/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FINAL SURVEY.PDF | |||
| MECH | COMPLETE | 03/29/2023 | 03/29/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/07/2022 | 11/07/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Update mechanical subcontractor. Current says deceased | |||
| BLD | COMPLETE | 10/31/2022 | 10/31/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/25/2022 | 07/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/25/2022 | 07/25/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/18/2021 | 10/18/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/18/2021 | 10/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/08/2021 | 09/08/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway This lot has two firm map numbers both must be listed on the site plan/survey | |||
| ENGIN1 | HOLD | 09/08/2021 | 09/09/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM The benchmarks indicated on the survey (nails in asphalt) do not exist in real life. Surveyor must visit site and establish physical benchmarks then resubmit survey. | |||
| SW1 | COMPLETE | 09/08/2021 | 09/15/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 08/13/2021 | 08/13/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Regardless of what is shown on the survey - there are no nails in the asphalt to indicate the location of the site benchmarks. The road was repaved recently and could be the cause of the problem. | |||
| ZON | HOLD | 08/12/2021 | 08/12/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Repeat comment: Site plan must show the width and material of front entry walkway House layout on landscape plan doesn't match plans and site plan Must have a total of four trees for this lot size Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. AC pad must be screened with 7 gallon shrubs This lot has two firm map numbers both shall be listed on the site plan/survey | |||
| BLD | COMPLETE | 08/12/2021 | 08/16/2021 |
| Note: Released By: JPI | |||
| ENGIN1 | COMPLETE | 08/12/2021 | 08/12/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 08/12/2021 | 08/12/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM INCORRECT DOCS | |||
| BADMIN | COMPLETE | 08/12/2021 | 08/12/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 06/25/2021 | 06/28/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Due to recent repaving of street the nails used for site benchmarks at the edge of pavement are no longer visiblt. Please reestablish useable site benchmark and resubmit survey. | |||
| BLD | HOLD | 05/27/2021 | 06/24/2021 |
| Note: Held By: JPI 1.. Many of the revision numbers in the product approval listing do no reflect the current revision shown on the DBPR website. Please append and resubmit. For example, the first product. 2. The product approval sheet varies from PA (3).pdf. Which is current for the project? Please remove the obsolete file. | |||
| CUSVC | COMPLETE | 05/27/2021 | 06/04/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/27/2021 | 06/01/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/27/2021 | 05/27/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/27/2021 | 06/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/27/2021 | 05/28/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/27/2021 | 06/02/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/27/2021 | 06/03/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway and driveway House layout on landscape plan doesn't match plans and site plan Must have a total of four trees for this lot size Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. This lot has two firm map numbers both shall be listed on the site plan/survey | |||
| SWALE | COMPLETE | 05/27/2021 | 10/21/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤26.02 | 08/24/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 08/24/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 08/24/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/24/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/24/2023 |
| REINSPECTION FEE | ¤40.00 | 08/24/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/24/2023 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/01/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 02/01/2022 |
| SEWER CREDIT | (¤2,291.75) | 02/01/2022 |
| SEWER INSPECTION | ¤25.00 | 02/01/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 02/01/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 02/01/2022 |
| METER - DEPOSIT | ¤60.00 | 02/01/2022 |
| METER - DEPOSIT | ¤60.00 | 02/01/2022 |
| WATER-METER | ¤441.07 | 02/01/2022 |
| NEW RESIDENTIAL INSPECTIONS | ¤442.00 | 02/01/2022 |
| SITE PLAN 20 | ¤20.00 | 02/01/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/01/2022 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/01/2022 |
| CONNECTION FEES | ¤1,077.88 | 02/01/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 02/01/2022 |
| BUILDING DISCOUNT 100% | (¤1,128.20) | 02/01/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 02/01/2022 |
| IMPACT FEE FIRE | ¤367.00 | 02/01/2022 |
| IMPACT FEE PARKS | ¤1,199.12 | 02/01/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/01/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 02/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/01/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 02/01/2022 |
| WATER- TURN ON | ¤25.00 | 02/01/2022 |
| WATER- TURN ON | ¤25.00 | 02/01/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 02/01/2022 |
| INSPECTION- ELECTRICAL | ¤192.60 | 02/01/2022 |
| INSPECTION - MECHANICAL | ¤192.60 | 02/01/2022 |
| INSPECTION - PLUMBING | ¤192.60 | 02/01/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤88.40 | 02/01/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,249.08 |