Permit #2021051699

Permit Details

Status: COED

Parcel Id: 07-11-31-7031-00390-0040
CONDITIONED SPACE: 1691 sqft
GARAGE: 683 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
OPENED PORCH (WITH ROOF) : 22 sqft
Total Square Footage: 2508 sqft
Block: 00390
Subdivision: 2166 - SECTION 31-ROYAL PALMS
Job Phone: 863-845-6967
Location Address: 7 RICHLAND LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/01/2022
NOC: RECORDED
Applicant name: LARRY SHERWIN THOMPSON
Owner: CARPENTER COMPANIES FLORIDA

Address

142 WEST PLATT STREET STE 116

TAMPA, FL 33606

Lot: 0040
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

THOMCO OF FLORIDA LLC
Status Location Address State License Number Phone
INACTIVE

6381 ROBERTS RD

KATHLEEN, FL 33849

CGC1513647 (Exp: 08/31/2024) 863-845-6967

Sub Contractors

ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/04/2023 FINAL APPROVED JWALKER
Note: 8/2/2023 - PREVIOUS INSPECTION NOTES 8/2/23 1. Garage door bucks missing anchors 2. Garage ceiling penitrations need to be sealed 3. 2'' conduit going into soffit needs to be sealed holes to large 4. ODU missing 4 tie downs on each corner 5. T stat wire in AHU closet needs to be sealed at drywall 6. Light require on lani 7/20/2023 - PREVIOUS INSPECTION NOTES 1. Heat pump anchor not intstalled at the 4 sides. 2. Exterior outlet near the heat pump is missing weather proof cover. 3. Holes in garage wall near the water heater need to be fixed. 4. Energy calculations do not match the units installed. Inspection was stopped a full reinspection will need to be done. Contractor please do a walk through and check all needed final inspection items before calling for a reinspection to avoid further fees.
BLD - BUILDING FINAL 08/02/2023 Disapproved - NO FEE MKRASKI
Note: 8/2/23 1. Garage door bucks missing anchors 2. Garage ceiling penitrations need to be sealed 3. 2'' conduit going into soffit needs to be sealed holes to large 4. ODU missing 4 tie downs on each corner 5. T stat wire in AHU closet needs to be sealed at drywall 6. Light require on lani 7/20/2023 - PREVIOUS INSPECTION NOTES 1. Heat pump anchor not intstalled at the 4 sides. 2. Exterior outlet near the heat pump is missing weather proof cover. 3. Holes in garage wall near the water heater need to be fixed. 4. Energy calculations do not match the units installed. Inspection was stopped a full reinspection will need to be done. Contractor please do a walk through and check all needed final inspection items before calling for a reinspection to avoid further fees.
ROW - STORMWATER FINAL 08/02/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. -------------------------------------------------------------------------------------- 7/19/2023 - PREVIOUS INSPECTION NOTES 07/20/23 NEED TO CLEAN OUT BOTH CULVERT ENDS THEY ARE FULL OF DIRT AND SILT BEFORE ROW FINAL WILL BE PASSED. I WILL NOT FEE YOU TODAY AS I WAS HERE FOR TWO OTHER INSPECTIONS. PLEASE MAKE CORRECTION BEFORE RESUBMITTING.
U -UTILITY RESIDENTIAL FINAL 07/20/2023 FINAL APPROVED LFITZGERALD
Note: 7/19/2023 - PREVIOUS INSPECTION NOTES need access to garage foe pep circuit breaker inspect
BLD - BUILDING FINAL 07/20/2023 Disapproved -FEE REQUIRED JWALKER
Note: 1. Heat pump anchor not intstalled at the 4 sides. 2. Exterior outlet near the heat pump is missing weather proof cover. 3. Holes in garage wall near the water heater need to be fixed. 4. Energy calculations do not match the units installed. Inspection was stopped a full reinspection will need to be done. Contractor please do a walk through and check all needed final inspection items before calling for a reinspection to avoid further fees.
ROW - FINAL APRON (AFTER POUR) 07/19/2023 APPROVED - AS NOTED FSLADISH
Note: 07/20/23 SHOT PIPE IT IS SAME AS FINAL SURVEY 6.59 LEFT INV 6.55 RIGHT INVERT. CUTS ARE MADE. CULVERT ENDS NEEDS CLEANING OT BEFORE ROW FINAL PASSAGE LOOKED GOOD AT THE TIME OF THIS INSPECTION.
U -UTILITY RESIDENTIAL FINAL 07/19/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: need access to garage foe pep circuit breaker inspect
ROW FIELD SURVEY /GRADING CERTIFICATION 07/19/2023 APPROVED FSLADISH
Note: 07/20/23 UPON WALKING PROPERTY WITH GRASS MOWED IT APPEARS AS IF DRAINAGE WILL WORK. MEETS CITY OF PALM COAST MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION. ___________________________________________________________________________________________________________________________ 7/18/2023 - PREVIOUS INSPECTION NOTES 07/18/23 PROPERTY NEEDS TO BE MOWED SO THAT WE CAN DETERMINE IF DRAINAGE IS GOING WORK. SWALE AREA ALSO, NEED TO DETERMINE IF IT IS FLOWING CORRECTLY.
ROW - STORMWATER FINAL 07/19/2023 Disapproved - NO FEE FSLADISH
Note: 07/20/23 NEED TO CLEAN OUT BOTH CULVERT ENDS THEY ARE FULL OF DIRT AND SILT BEFORE ROW FINAL WILL BE PASSED. I WILL NOT FEE YOU TODAY AS I WAS HERE FOR TWO OTHER INSPECTIONS. PLEASE MAKE CORRECTION BEFORE RESUBMITTING.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/18/2023 APPROVED FSLADISH
Note: 07/18/23 CULVERT PIPE ELEVATION NOW WITHIN TOLERANCE AND SHOWING CORRECT FLOW ON SURVEY. __________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 MAYBE IT IS JUST A TYPO, I'M NOT SURE BUT NOW YOU HAVE THE CULVERT INVERT FLOWING THE WRONG WAY. THE FLOW IS SHOWN IN THE SWALE PLAN LEFT TO RIGHT. YOU ARE SHOWING 26.49-26.55. PREVIOUS SURVEY SHOT 26.59-26.38 WAS THE PREVIOUS LISTED SHOT. MAYBE IT IS 26.59-26.55? I DO NOT KNOW BUT IT IS STILL NOT CORRECT. I AM NOT GOING TO FEE YOU, PLEASE DETERMINE THE CORRECT ELEVATION SHOTS FOR THIS CULVERT. ________________________________________________________________________________________________________________________ 7/12/2023 - PREVIOUS INSPECTION NOTES 07/12/23 THE CULVERT PIPE INVERT IS OUT OF TOLERANCE BY MORE THAN A .10 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ______________________________________________________________________________________________________________________ 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) MISSING THOSE ELEVATION ON THE LEFT SIDE CORNER OF THE HOUSE IS RUNNING FLAT 28.7 AT THE CORNER OF THE HOUSE AND ON THE MIDDLE OF THE REAR YARD IS 28.7 ALSO Existing interior elevations on a 20’ grid. (E) FOR THE FIELD SERVICE NEED TO MOW THE LAWN
ROW FIELD SURVEY /GRADING CERTIFICATION 07/18/2023 Disapproved - NO FEE FSLADISH
Note: 07/18/23 PROPERTY NEEDS TO BE MOWED SO THAT WE CAN DETERMINE IF DRAINAGE IS GOING WORK. SWALE AREA ALSO, NEED TO DETERMINE IF IT IS FLOWING CORRECTLY.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/17/2023 Disapproved - NO FEE FSLADISH
Note: 07/17/23 MAYBE IT IS JUST A TYPO, I'M NOT SURE BUT NOW YOU HAVE THE CULVERT INVERT FLOWING THE WRONG WAY. THE FLOW IS SHOWN IN THE SWALE PLAN LEFT TO RIGHT. YOU ARE SHOWING 26.49-26.55. PREVIOUS SURVEY SHOT 26.59-26.38 WAS THE PREVIOUS LISTED SHOT. MAYBE IT IS 26.59-26.55? I DO NOT KNOW BUT IT IS STILL NOT CORRECT. I AM NOT GOING TO FEE YOU, PLEASE DETERMINE THE CORRECT ELEVATION SHOTS FOR THIS CULVERT. ________________________________________________________________________________________________________________________ 7/12/2023 - PREVIOUS INSPECTION NOTES 07/12/23 THE CULVERT PIPE INVERT IS OUT OF TOLERANCE BY MORE THAN A .10 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ______________________________________________________________________________________________________________________ 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) MISSING THOSE ELEVATION ON THE LEFT SIDE CORNER OF THE HOUSE IS RUNNING FLAT 28.7 AT THE CORNER OF THE HOUSE AND ON THE MIDDLE OF THE REAR YARD IS 28.7 ALSO Existing interior elevations on a 20’ grid. (E) FOR THE FIELD SERVICE NEED TO MOW THE LAWN
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/12/2023 Disapproved -FEE REQUIRED FSLADISH
Note: 07/12/23 THE CULVERT PIPE INVERT IS OUT OF TOLERANCE BY MORE THAN A .10 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ______________________________________________________________________________________________________________________ 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) MISSING THOSE ELEVATION ON THE LEFT SIDE CORNER OF THE HOUSE IS RUNNING FLAT 28.7 AT THE CORNER OF THE HOUSE AND ON THE MIDDLE OF THE REAR YARD IS 28.7 ALSO Existing interior elevations on a 20’ grid. (E) FOR THE FIELD SERVICE NEED TO MOW THE LAWN
U-CROSS CONNECTION 07/11/2023 APPROVED - AS NOTED LFITZGERALD
Note: has potable irrigation with PVB installed-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/21/2023 Disapproved - NO FEE GBERTOLA
Note: 06/21/23= Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) MISSING THOSE ELEVATION ON THE LEFT SIDE CORNER OF THE HOUSE IS RUNNING FLAT 28.7 AT THE CORNER OF THE HOUSE AND ON THE MIDDLE OF THE REAR YARD IS 28.7 ALSO Existing interior elevations on a 20’ grid. (E) FOR THE FIELD SERVICE NEED TO MOW THE LAWN
ELECTRIC - EARLY POWER 04/21/2023 APPROVED JWALKER
U - SEWER TIE IN 04/13/2023 APPROVED - AS NOTED MGIBSON
Note: 4/11/2023 - PREVIOUS INSPECTION NOTES Work has been covered up, but may have been seen by prior nspection. Call back in for 04/12/2023.TS this w2as a virtual inspection
U - SEWER TIE IN 04/11/2023 Disapproved - NO FEE TSTAUFFACHER
Note: Work has been covered up, but may have been seen by prior nspection. Call back in for 04/12/2023.TS
ROW- PRE-APRON (PRE-POUR) 04/06/2023 APPROVED FSLADISH
Note: 04/06/23 CORRECTIONS MADE. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 4/3/2023 - PREVIOUS INSPECTION NOTES 04/03/23 CULVERT PIPE NEEDS TO BE INSTALLED 8 FT FROM FORM BOARD ROAD EDGE. SEE ATTACHED PHOTO FOR REFERENCE.
ROW- PRE-APRON (PRE-POUR) 04/03/2023 Disapproved -FEE REQUIRED FSLADISH
Note: 04/03/23 CULVERT PIPE NEEDS TO BE INSTALLED 8 FT FROM FORM BOARD ROAD EDGE. SEE ATTACHED PHOTO FOR REFERENCE.
PEP TANK INSTALLATION REQUEST 03/13/2023 APPROVED TSCHWEERS
INSULATION 01/12/2023 APPROVED JWALKER
Note: 1/10/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 New inspection due to canceled inspection 12/13/2022 - PREVIOUS INSPECTION NOTES 4. Install nail plates at multiple areas where wiring is passing through 2 x framing. Minimum distance from edge of stud is 1 1/4". Less than requires a nail plate. 5. Please have appoved duct layout drawing onsite. 12/15/22 1.The above listed have not yet been corrected Please do not cover up the wire at the top of the garage wall with insulation as some of the missing nail plates need to be installed. Check all interior walls top plated for nail plates. 2. Have the approved duct layout onsite. Please have the two items completed before insulation inspection to avoid fees and delays. 1/10/23 Duct drawing not in the job box or in the building.
INSULATION 01/10/2023 Disapproved - NO FEE JWALKER
Note: Inspector Notes from Inspection 2420 New inspection due to canceled inspection 12/13/2022 - PREVIOUS INSPECTION NOTES 4. Install nail plates at multiple areas where wiring is passing through 2 x framing. Minimum distance from edge of stud is 1 1/4". Less than requires a nail plate. 5. Please have appoved duct layout drawing onsite. 12/15/22 1.The above listed have not yet been corrected Please do not cover up the wire at the top of the garage wall with insulation as some of the missing nail plates need to be installed. Check all interior walls top plated for nail plates. 2. Have the approved duct layout onsite. Please have the two items completed before insulation inspection to avoid fees and delays. 1/10/23 Duct drawing not in the job box or in the building.
ALL ROUGH 12/15/2022 CANCELLED BY APPLICANT WEB
Note: 12/13/2022 - PREVIOUS INSPECTION NOTES 1. 5' DWV head test not holding water. 2. Seal dryer duct fitting. 3. The service wire needs to be pulled down where it is contacting the roof decking and secured to prevent roof nails from penetrating the wire. 4. Install nail plates at multiple areas where wiring is passing through 2 x framing. Minimum distance from edge of stud is 1 1/4". Less than requires a nail plate. 5. Please have appoved duct layout drawing onsite.
ALL ROUGH 12/15/2022 APPROVED - AS NOTED JWALKER
Note: New inspection due to canceled inspection 12/13/2022 - PREVIOUS INSPECTION NOTES 4. Install nail plates at multiple areas where wiring is passing through 2 x framing. Minimum distance from edge of stud is 1 1/4". Less than requires a nail plate. 5. Please have appoved duct layout drawing onsite. 12/15/22 1.The above listed have not yet been corrected Please do not cover up the wire at the top of the garage wall with insulation as some of the missing nail plates need to be installed. Check all interior walls top plated for nail plates. 2. Have the approved duct layout onsite. Please have the two items completed before insulation inspection to avoid fees and delays.
ALL ROUGH 12/13/2022 Disapproved - NO FEE JWALKER
Note: 1. 5' DWV head test not holding water. 2. Seal dryer duct fitting. 3. The service wire needs to be pulled down where it is contacting the roof decking and secured to prevent roof nails from penetrating the wire. 4. Install nail plates at multiple areas where wiring is passing through 2 x framing. Minimum distance from edge of stud is 1 1/4". Less than requires a nail plate. 5. Please have appoved duct layout drawing onsite.
LATH/BRICK/ WATER BARRIER 12/13/2022 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/15/2022 APPROVED RMARTIN
ROOF VALLEY & METAL 11/09/2022 APPROVED JWALKER
Note: 10/27/2022 - PREVIOUS INSPECTION NOTES 10/26/2022 - PREVIOUS INSPECTION NOTES 10/26/22 No one onsite, No call. No text. Contractor please call the moring of the reinspection to set up a time to meet on site. 10/27/22 Upon demo inspection where shingles were removed to expose the synthetic underlayment. The contractor did not install the required 12" o.c. field nailing. 4 areas were checked. 2 at the right side roof, 1 at the rear roof, and 1 at the left side roof. All Shingles and under layment will need to be removed from entire roof New underlayment will need to be installed.
ROOF VALLEY & METAL 10/27/2022 Disapproved - NO FEE JWALKER
Note: 10/26/2022 - PREVIOUS INSPECTION NOTES 10/26/22 No one onsite, No call. No text. Contractor please call the moring of the reinspection to set up a time to meet on site. 10/27/22 Upon demo inspection where shingles were removed to expose the synthetic underlayment. The contractor did not install the required 12" o.c. field nailing. 4 areas were checked. 2 at the right side roof, 1 at the rear roof, and 1 at the left side roof. All Shingles and under layment will need to be removed from entire roof New underlayment will need to be installed.
ROOF VALLEY & METAL 10/26/2022 Disapproved - NO FEE JWALKER
Note: 10/26/22 No one onsite, No call. No text. Contractor please call the moring of the reinspection to set up a time to meet on site.
ROOF VALLEY & METAL 10/21/2022 Disapproved - NO FEE JWALKER
Note: Shingles have been installed. A demo inspection will need to be set up. Please contact inspection the day reispection is set up for time to meet on job site.
ROOF SHEATHING 10/04/2022 APPROVED KSANDOE
WALL SHEATHING 10/04/2022 APPROVED KSANDOE
TIE BEAM / LINTEL 09/20/2022 APPROVED JWALKER
Note: 9/19/2022 - PREVIOUS INSPECTION NOTES Please have a full set of approved drawings onsite for inspections. Lintels were checked for rebar. Check prints for any doubled areas.
TIE BEAM / LINTEL 09/19/2022 Disapproved -FEE REQUIRED JWALKER
Note: Please have a full set of approved drawings onsite for inspections. Lintels were checked for rebar. Check prints for any doubled areas.
FOUND SURVEY APPROVED (OFFICE) 07/26/2022 APPROVED TBAKER
MONOLITHIC SLAB 06/24/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION Compaction test results are not posted. 4 of the footing pads detail F 2.5 on the foundation drawings have not been install / missing rebar. Marked the drawing to assist the contractor.
MONOLITHIC SLAB 06/22/2022 Disapproved - NO FEE JWALKER
Note: Compaction test results are not posted. 4 of the footing pads detail F 2.5 on the foundation drawings have not been install / missing rebar. Marked the drawing to assist the contractor.
MONOLITHIC SLAB 06/17/2022 CANCELLED BY APPLICANT JWALKER
PLUMBING 1ST ROUGH UNDERGROUND 06/15/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 06/15/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 04/08/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 07/17/2023 07/17/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FINAL SURVEY.PDF
BADMIN INFORMATION 07/17/2023 07/17/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FINAL SURVEY.PDF
MECH COMPLETE 03/29/2023 03/29/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 11/07/2022 11/07/2022
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Update mechanical subcontractor. Current says deceased
BLD COMPLETE 10/31/2022 10/31/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/25/2022 07/26/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/25/2022 07/25/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 10/18/2021 10/18/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/18/2021 10/20/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 09/08/2021 09/08/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway This lot has two firm map numbers both must be listed on the site plan/survey
ENGIN1 HOLD 09/08/2021 09/09/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM The benchmarks indicated on the survey (nails in asphalt) do not exist in real life. Surveyor must visit site and establish physical benchmarks then resubmit survey.
SW1 COMPLETE 09/08/2021 09/15/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ENGIN1 HOLD 08/13/2021 08/13/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Regardless of what is shown on the survey - there are no nails in the asphalt to indicate the location of the site benchmarks. The road was repaved recently and could be the cause of the problem.
ZON HOLD 08/12/2021 08/12/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Repeat comment: Site plan must show the width and material of front entry walkway House layout on landscape plan doesn't match plans and site plan Must have a total of four trees for this lot size Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. AC pad must be screened with 7 gallon shrubs This lot has two firm map numbers both shall be listed on the site plan/survey
BLD COMPLETE 08/12/2021 08/16/2021
Note: Released By: JPI
ENGIN1 COMPLETE 08/12/2021 08/12/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN HOLD 08/12/2021 08/12/2021
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM INCORRECT DOCS
BADMIN COMPLETE 08/12/2021 08/12/2021
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
ENGIN1 HOLD 06/25/2021 06/28/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Due to recent repaving of street the nails used for site benchmarks at the edge of pavement are no longer visiblt. Please reestablish useable site benchmark and resubmit survey.
BLD HOLD 05/27/2021 06/24/2021
Note: Held By: JPI 1.. Many of the revision numbers in the product approval listing do no reflect the current revision shown on the DBPR website. Please append and resubmit. For example, the first product. 2. The product approval sheet varies from PA (3).pdf. Which is current for the project? Please remove the obsolete file.
CUSVC COMPLETE 05/27/2021 06/04/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 05/27/2021 06/01/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/27/2021 05/27/2021
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
LOCATE COMPLETE 05/27/2021 06/02/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 05/27/2021 05/28/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/27/2021 06/02/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 05/27/2021 06/03/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway and driveway House layout on landscape plan doesn't match plans and site plan Must have a total of four trees for this lot size Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. This lot has two firm map numbers both shall be listed on the site plan/survey
SWALE COMPLETE 05/27/2021 10/21/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤26.02 08/24/2023
CONTRACTOR CHANGE ¤20.00 08/24/2023
CONTRACTOR CHANGE ¤20.00 08/24/2023
PLAN REVIEW - REVISION ¤32.50 08/24/2023
PLAN REVIEW - REVISION ¤32.50 08/24/2023
REINSPECTION RESIDENTIAL ¤40.00 08/24/2023
REINSPECTION RESIDENTIAL ¤40.00 08/24/2023
REINSPECTION FEE ¤40.00 08/24/2023
SW ENG REINSPECTION 30 ¤30.00 08/24/2023
STORM WATER PERMIT FEES ¤80.00 02/01/2022
3% TRANS IMPACT FEE CREDIT (¤51.54) 02/01/2022
SEWER CREDIT (¤2,291.75) 02/01/2022
SEWER INSPECTION ¤25.00 02/01/2022
SEWER CAPITAL FACILITY ¤4,939.76 02/01/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 02/01/2022
METER - DEPOSIT ¤60.00 02/01/2022
METER - DEPOSIT ¤60.00 02/01/2022
WATER-METER ¤441.07 02/01/2022
NEW RESIDENTIAL INSPECTIONS ¤442.00 02/01/2022
SITE PLAN 20 ¤20.00 02/01/2022
SURCHARGE FS 533.721 ¤2.00 02/01/2022
SURCHARGE - FS 468.631 ¤2.00 02/01/2022
CONNECTION FEES ¤1,077.88 02/01/2022
CONTRACTOR CHANGE ¤40.00 02/01/2022
BUILDING DISCOUNT 100% (¤1,128.20) 02/01/2022
3% FIRE IMPACT FEE CREDIT (¤11.01) 02/01/2022
IMPACT FEE FIRE ¤367.00 02/01/2022
IMPACT FEE PARKS ¤1,199.12 02/01/2022
IMPACT FEE SCHOOL ¤3,600.00 02/01/2022
IMPACT FEE TRANSPORTATION ¤1,718.00 02/01/2022
WATER -IRRIGATION INSPECTION ¤25.00 02/01/2022
WATER -IRRIGATION INSPECTION ¤25.00 02/01/2022
3% PARKS IMPACT FEE CREDIT (¤35.97) 02/01/2022
WATER- TURN ON ¤25.00 02/01/2022
WATER- TURN ON ¤25.00 02/01/2022
ADMINISTRATIVE RESIDENTIAL ¤20.00 02/01/2022
INSPECTION- ELECTRICAL ¤192.60 02/01/2022
INSPECTION - MECHANICAL ¤192.60 02/01/2022
INSPECTION - PLUMBING ¤192.60 02/01/2022
PLAN REVIEW - RESIDENTIAL ¤88.40 02/01/2022
Fees Total Due: ¤0.00 Total Paid: ¤15,249.08