Permit #2021051738
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00040-0300 |
| CONDITIONED SPACE: 1691 sqft |
| GARAGE: 683 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| OPENED PORCH (WITH ROOF) : 22 sqft |
| Total Square Footage: 2508 sqft |
| Block: 00040 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 863-845-6967 |
| Location Address: 62 PHEASANT DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/10/2022 |
| NOC: RECORDED |
| Applicant name: LARRY SHERWIN THOMPSON |
| Owner: CARPENTER COMPANIES FLORIDA |
|
Address 142 WEST PLATT STREET STE 116 TAMPA, FL 33606 |
| Lot: 0300 |
| Contracted Stated Job Value: ¤140,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
THOMCO OF FLORIDA LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
6381 ROBERTS RD KATHLEEN, FL 33849 |
CGC1513647 (Exp: 08/31/2024) | 863-845-6967 |
Sub Contractors
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/15/2023 | FINAL APPROVED | KSANDOE |
| Note: 5/30/2023 - PREVIOUS INSPECTION NOTES Missing weather stripping on front door. Outlets in kitchen missing covers. Light in hallway hanging by wires - not mounted properly Seal wall behind water heater for electrical penetration Seal wall in ac closet for electrical penetration. Patch and seal all holes in interior drywall finishes | |||
| ROW - FINAL APRON (AFTER POUR) | 06/15/2023 | APPROVED | FSLADISH |
| Note: 06/15/23 PIPE ELEVATION GOOD. LOOKED GOOD AT TIME OF INSPECTION. | |||
| ROW - STORMWATER FINAL | 06/15/2023 | FINAL APPROVED | FSLADISH |
| Note: 06/15/23 CORRECTIONS MADE. LOOKED GOOD AT TIME OF INSPECTION. ______________________________________________________________________________________________________________________ 6/1/2023 - PREVIOUS INSPECTION NOTES 6/1/23= NEED TO READ THE INPECTOR NOTE LEFT BACK CORNER AREA MARKED WITH WHITE PAINT)NEED TO PREVENT WATER GOING INTO THE NEIGHBOR LOT The subject lots drainage must not negatively impact any adjacent property. (B)B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 05/31/23 MET WITH CM SHOWED HIM WHAT NEED TO BE COMPLETED. I WHITE LINED THE AREA. WILL APPROVE AS NOTED. HE WILL ADDRESS THE ISSUE AND RESUBMIT FOR AFTER POUR AND ROW FINAL | |||
| ROW - FINAL APRON (AFTER POUR) | 06/01/2023 | APPROVED | GBERTOLA |
| Note: 6/1/23=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 05/31/23 MET WITH CM SHOWED HIM WHAT NEED TO BE COMPLETED. I WHITE LINED THE AREA. WILL APPROVE AS NOTED. HE WILL ADDRESS THE ISSUE AND RESUBMIT FOR AFTER POUR AND ROW FINAL | |||
| ROW - STORMWATER FINAL | 06/01/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 6/1/23= NEED TO READ THE INPECTOR NOTE LEFT BACK CORNER AREA MARKED WITH WHITE PAINT)NEED TO PREVENT WATER GOING INTO THE NEIGHBOR LOT The subject lots drainage must not negatively impact any adjacent property. (B)B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 05/31/23 MET WITH CM SHOWED HIM WHAT NEED TO BE COMPLETED. I WHITE LINED THE AREA. WILL APPROVE AS NOTED. HE WILL ADDRESS THE ISSUE AND RESUBMIT FOR AFTER POUR AND ROW FINAL | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/31/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 05/31/23 MET WITH CM SHOWED HIM WHAT NEED TO BE COMPLETED. I WHITE LINED THE AREA. WILL APPROVE AS NOTED. HE WILL ADDRESS THE ISSUE AND RESUBMIT FOR AFTER POUR AND ROW FINAL | |||
| ROW - STORMWATER FINAL | 05/30/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 05/30/23 YOU MUST FIRST SCHEDULE A FIELD SURVEY BEFORE YOU CAN SCHEDULE AN AFTER POUR OR ROW FINAL | |||
| U -UTILITY RESIDENTIAL FINAL | 05/30/2023 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 05/30/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 05/30/23 YOU MUST FIRST SCHEDULE A FIELD SURVEY BEFORE YOU CAN SCHEDULE AN AFTER POUR OR ROW FINAL. | |||
| U-CROSS CONNECTION | 05/30/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has irrigation meter with PVB installed-nocross connection | |||
| BLD - BUILDING FINAL | 05/30/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Missing weather stripping on front door. Outlets in kitchen missing covers. Light in hallway hanging by wires - not mounted properly Seal wall behind water heater for electrical penetration Seal wall in ac closet for electrical penetration. Patch and seal all holes in interior drywall finishes | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/26/2023 | APPROVED | FSLADISH |
| Note: 05/26/23 correction made conferred with Parren. 5/23/2023 - PREVIOUS INSPECTION NOTES 05/23/23 NEED TO CLEAN UP ELEVATION SHOTS IN THE FRONT SWALE CAN'T DETERMINE WHATS WHAT, TO MANY NUMBERS ON TOP OF EACH OTHER. NEED ELEVATION SHOTS ACROSS REAR PROPERTY LINE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/23/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 05/23/23 NEED TO CLEAN UP ELEVATION SHOTS IN THE FRONT SWALE CAN'T DETERMINE WHATS WHAT, TO MANY NUMBERS ON TOP OF EACH OTHER. NEED ELEVATION SHOTS ACROSS REAR PROPERTY LINE. | |||
| ELECTRIC - EARLY POWER | 04/06/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1413. Release Power | |||
| ROW- PROJECT STATUS | 03/31/2023 | APPROVED | GBERTOLA |
| Note: meeting with cm | |||
| GRAVITY SEWER TEST | 03/20/2023 | APPROVED | MGIBSON |
| Note: 3/17/2023 - PREVIOUS INSPECTION NOTES | |||
| U - SEWER TIE IN | 03/20/2023 | APPROVED | MGIBSON |
| Note: 3/17/2023 - PREVIOUS INSPECTION NOTES | |||
| GRAVITY SEWER TEST | 03/17/2023 | CANCELLED BY APPLICANT | KSANDOE |
| U - SEWER TIE IN | 03/17/2023 | CANCELLED BY APPLICANT | KSANDOE |
| ROW- PRE-APRON (PRE-POUR) | 03/15/2023 | APPROVED | GBERTOLA |
| Note: 3/15/23=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/13/2023 - PREVIOUS INSPECTION NOTES TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION. DIDN'T CHECK THE CULVERT PIPE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/10/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 03/13/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. BUILDER MAY WANT TO PUT ROCK AND/OR ROADBASE TO STABILIZE GROUND FOR BETTER COMPACTION. DIDN'T CHECK THE CULVERT PIPE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/10/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 03/10/2023 | CANCELLED BY APPLICANT | RGROSS |
| PEP TANK INSTALLATION REQUEST | 02/06/2023 | APPROVED | TSCHWEERS |
| LATH/BRICK/ WATER BARRIER | 11/22/2022 | APPROVED | KSANDOE |
| Note: 11/18/2022 - PREVIOUS INSPECTION NOTES gable ends covered with siding prior to Lath/Brick need to remove the siding repair the house wrap if damaged from nail holes | |||
| LATH/BRICK/ WATER BARRIER | 11/18/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: gable ends covered with siding prior to Lath/Brick need to remove the siding repair the house wrap if damaged from nail holes | |||
| INSULATION | 11/15/2022 | APPROVED | KSANDOE |
| Note: 11/9/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 Insulation on AC lineset was damaged on installation and needs repaired/taped and supported. Transfer duct on AC return; Tape cannot be used as ducting. Metal must make contact. Front window has not been installed. Check at insulation 11/9/22 Item 2 from above notes has not been addressed | |||
| INSULATION | 11/09/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Inspector Notes from Inspection 2420 Insulation on AC lineset was damaged on installation and needs repaired/taped and supported. Transfer duct on AC return; Tape cannot be used as ducting. Metal must make contact. Front window has not been installed. Check at insulation 11/9/22 Item 2 from above notes has not been addressed | |||
| ALL ROUGH | 10/31/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: Insulation on AC lineset was damaged on installation and needs repaired/taped and supported. Transfer duct on AC return; Tape cannot be used as ducting. Metal must make contact. Front window has not been installed. Check at insulation | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2022 | APPROVED | KSANDOE |
| Note: 10/26/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2340 Please provide engineering report verifying integrity of trusses that have been stored improperly for extended period of time 8/29/22 Notes from previous inspection have not been addressed. Trusses were stored in contact with the ground, on an uneven surface, unprotected from the weather for a period greatly exceeding manufacturers recommendations. Please provide certified letter to the building department verifying the integrity of the trusses now installed. 10/26/22 Above notes have not been addressed | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/26/2022 | Disapproved - NO FEE | KSANDOE |
| Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2340 Please provide engineering report verifying integrity of trusses that have been stored improperly for extended period of time 8/29/22 Notes from previous inspection have not been addressed. Trusses were stored in contact with the ground, on an uneven surface, unprotected from the weather for a period greatly exceeding manufacturers recommendations. Please provide certified letter to the building department verifying the integrity of the trusses now installed. 10/26/22 Above notes have not been addressed | |||
| ROOF VALLEY & METAL | 09/02/2022 | APPROVED | KSANDOE |
| ROOF SHEATHING | 08/30/2022 | APPROVED | KSANDOE |
| WALL SHEATHING | 08/30/2022 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/29/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Inspector Notes from Inspection 2340 Please provide engineering report verifying integrity of trusses that have been stored improperly for extended period of time 8/29/22 Notes from previous inspection have not been addressed. Trusses were stored in contact with the ground, on an uneven surface, unprotected from the weather for a period greatly exceeding manufacturers recommendations. Please provide certified letter to the building department verifying the integrity of the trusses now installed. | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/26/2022 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 06/28/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: Please provide engineering report verifying integrity of trusses that have been stored improperly for extended period of time | |||
| MONOLITHIC SLAB | 06/01/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Trusses WILL NOT be stored, uncovered, in contact with the ground, for more than 1 week. Please walk your job sites prior to calling in inspections. Minimum clearances for reinforcement to ground not met. Clean out cave-ins and reschedule. Missing compaction report. 5/27/22 - CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.3.3.7.4 | |||
| MONOLITHIC SLAB | 05/31/2022 | CANCELLED BY APPLICANT | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Trusses WILL NOT be stored, uncovered, in contact with the ground, for more than 1 week. Please walk your job sites prior to calling in inspections. Minimum clearances for reinforcement to ground not met. Clean out cave-ins and reschedule. Missing compaction report. 5/27/22 - CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.3.3.7.4 | |||
| MONOLITHIC SLAB | 05/27/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: THIS IS A REINSPECTION Trusses WILL NOT be stored, uncovered, in contact with the ground, for more than 1 week. Please walk your job sites prior to calling in inspections. Minimum clearances for reinforcement to ground not met. Clean out cave-ins and reschedule. Missing compaction report. 5/27/22 - CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.3.3.7.4 | |||
| MONOLITHIC SLAB | 05/23/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Trusses WILL NOT be stored, uncovered, in contact with the ground, for more than 1 week. Please walk your job sites prior to calling in inspections. Minimum clearances for reinforcement to ground not met. Clean out cave-ins and reschedule. Missing compaction report. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/13/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 04/08/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 2/23/2022 8:03:49 AM trees on property | |||
| WATER METER INSTALLATION REQUEST | 02/18/2022 | Disapproved - NO FEE | CSTONE |
| Note: trees on property |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/04/2023 | 04/04/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/31/2022 | 10/31/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/27/2022 | 10/27/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/26/2022 | 08/26/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/26/2022 | 08/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/25/2022 | 08/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/25/2022 | 08/26/2022 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Permit correction sheet shows submittal of a foundation survey, however there is only an engineering report attached. | |||
| ENGIN1 | HOLD | 05/27/2022 | 05/27/2022 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey not acceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevations of finished slab/foundation. | |||
| ZON | COMPLETE | 05/27/2022 | 05/27/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/27/2022 | 05/27/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 01/10/2022 | 01/10/2022 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM DESCRIPTION OF IMPROVEMENT MISSING FROM NOC. PLEASE RE-FILE WITH CLERK OF COURTS TO SHOW ON OFFICIAL RECORDS | |||
| BADMIN | COMPLETE | 01/10/2022 | 01/10/2022 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/17/2021 | 11/17/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/17/2021 | 11/19/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/17/2021 | 11/17/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/04/2021 | 10/04/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Noticed in notes on site plan that driveway may be asphalt millings or crushed concrete fines. Driveways must be solid concrete or pavers per the ldc. Please correct site plan/survey to specify the correct approved material | |||
| ENGIN1 | COMPLETE | 10/04/2021 | 10/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 10/04/2021 | 10/11/2021 |
| Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. Elevations on all adjacent properties at a minimum of 20-foot intervals, on a 10 foot offset, outside the property lines. (A) | |||
| ZON | HOLD | 09/22/2021 | 09/23/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Need the width and material of the front entry walkway on site plan/survey Incorrect address on landscape plan right side of page Noticed in notes on site plan that driveway may be asphalt millings or crushed concrete fines. Driveways must be solid concrete or pavers per the ldc. Please correct site plan/survey to specify the correct approved material | |||
| SW1 | COMPLETE | 09/22/2021 | 09/29/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/22/2021 | 09/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/13/2021 | 08/13/2021 |
| Note: Held By: ESTELLE LENS - (386)986-3751 - Repeat Comments: Site plan: Need the width of the walkway. Landscape Plan: - Need to upload the correct landscape plan. (The layout must match the site plan and the floor plan) - This site requires four credit trees including at least one shade tree. Please indicate types and locations of trees. (Pine trees are non-credit trees. Please indicate the types and locations of trees being proposed.) - 16 foundation plantings are required. 8 across the front and 4 on each side. | |||
| BLD | COMPLETE | 08/12/2021 | 08/16/2021 |
| Note: Released By: JPI | |||
| ENGIN1 | HOLD | 08/12/2021 | 08/12/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please carry street elevations out to nearest hundredth of a foot. | |||
| ENGIN1 | HOLD | 06/11/2021 | 06/11/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey elevations differ from ITT as-builts by 2' +/- | |||
| BLD | HOLD | 05/27/2021 | 05/31/2021 |
| Note: Held By: JPI 1. Continuing comment. Correct sheet numbering and/or append missing sheets. 2. Product Approval Spec Sheet provided, and Product Approval #’s provided for on drawings, page PA. Numbers do not match for multiple products. Please review and either provide matching numbers or eliminate one. | |||
| CUSVC | COMPLETE | 05/27/2021 | 06/04/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/27/2021 | 06/01/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/27/2021 | 05/27/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/27/2021 | 06/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/27/2021 | 05/28/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/27/2021 | 06/04/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/27/2021 | 06/04/2021 |
| Note: Held By: ESTELLE LENS - (386)986-3751 - Site plan: - Need material of the driveway. - Need the material and width of the walkway. Landscape Plan: - Need to upload the correct landscape plan. - This site requires four credit trees including at least one shade tree. Please indicate types and locations of trees. - 16 foundation plantings are required. 8 across the front and 4 on each side. Color Sheet: - Please provide the exterior material where requested on the color sheet. - Please add a note that the siding and stucco will be the same color. | |||
| SWALE | COMPLETE | 05/27/2021 | 09/24/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 06/28/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 06/28/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/28/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/28/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/28/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/28/2023 |
| CONNECTION FEES | ¤1,077.88 | 01/10/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 01/10/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/10/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 01/10/2022 |
| SEWER CREDIT | (¤650.00) | 01/10/2022 |
| SEWER INSPECTION | ¤25.00 | 01/10/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 01/10/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 01/10/2022 |
| BUILDING DISCOUNT 100% | (¤1,128.20) | 01/10/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 01/10/2022 |
| IMPACT FEE FIRE | ¤367.00 | 01/10/2022 |
| IMPACT FEE PARKS | ¤1,199.12 | 01/10/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/10/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 01/10/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/10/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/10/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 01/10/2022 |
| NEW RESIDENTIAL INSPECTIONS | ¤442.00 | 01/10/2022 |
| SITE PLAN 20 | ¤20.00 | 01/10/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/10/2022 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/10/2022 |
| METER - DEPOSIT | ¤60.00 | 01/10/2022 |
| METER - DEPOSIT | ¤60.00 | 01/10/2022 |
| WATER-METER | ¤467.09 | 01/10/2022 |
| WATER- TURN ON | ¤25.00 | 01/10/2022 |
| WATER- TURN ON | ¤25.00 | 01/10/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 01/10/2022 |
| INSPECTION- ELECTRICAL | ¤192.60 | 01/10/2022 |
| INSPECTION - MECHANICAL | ¤192.60 | 01/10/2022 |
| INSPECTION - PLUMBING | ¤192.60 | 01/10/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤88.40 | 01/10/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,900.83 |