Permit #2021051749

Permit Details

Status: COED

Parcel Id: 07-11-31-7024-00250-0120
CONDITIONED SPACE: 1691 sqft
GARAGE: 683 sqft
OPENED PORCH (WITH ROOF) : 22 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
Total Square Footage: 2508 sqft
Block: 00250
Subdivision: 2167 - SECTION 24-PINE GROVE
Job Phone: 863-845-6967
Location Address: 33 PRINCETON LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/10/2022
NOC: RECORDED
Applicant name: LARRY SHERWIN THOMPSON
Owner: CARPENTER COMPANIES FLORIDA LLC

Address

SUITE 116

TAMPA, FL 33606

Address

142 WEST PLATT STREET

TAMPA, FL 33606

Lot: 0120
Contracted Stated Job Value: ¤140,000.00
Job Description: Single Family Residence
Type: CN

Contractor

THOMCO OF FLORIDA LLC
Status Location Address State License Number Phone
INACTIVE

6381 ROBERTS RD

KATHLEEN, FL 33849

CGC1513647 (Exp: 08/31/2024) 863-845-6967

Sub Contractors

JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/18/2023 FINAL APPROVED KSANDOE
ROW - FINAL APRON (AFTER POUR) 07/13/2023 APPROVED FSLADISH
Note: 07/13/23 LOOKED GOOD AT THE TIME OF THIS INSPECTION.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/13/2023 APPROVED FSLADISH
Note: 07/13/23 THIS IS A DUPLICATE INSPECTION. THE FINAL SURVEY HAS BEED RESUBMITTED WITH FRONT PROPERTY LINE ELEVATION.
ROW - STORMWATER FINAL 07/13/2023 FINAL APPROVED FSLADISH
Note: 07/13/23 LOOKED GOOD AT HE TIME OF THIS INSPECTION.
U -UTILITY RESIDENTIAL FINAL 07/13/2023 APPROVED - AS NOTED LFITZGERALD
Note: in future when sewer C/O is next to edge of driveway, place concrete around it-1ft square collar
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/12/2023 APPROVED - AS NOTED FSLADISH
Note: 07/12/23 NEED ELEVATION SHOT ACROSS FRONT PROPERTY LINES.. APPOVING AS NOTED PLEASE UPLOAD ELEVATION SHOTS. 6/28/2023 - PREVIOUS INSPECTION NOTES 06/28/23 THERE ARE NO ELEVATION SHOTS ON THE REAR ADJOINING PROPERTIES. THERE MUST BE SHOTS LISTED AT THE 10' OFFSET AT 20' INTERVALS ON THE REAR PROPERTY LINE. AT THE PROPERTY ALONG REAR ON A 20" GRID AND INSIDE THE REAR PROPERTY LINE ALSO. Elevations every 20 ft off the property lines Sec 300.01D2 Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern Elevations every 20 ft. on the property line Sec 300.01D1 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals.. 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= NEED A NEW FINAL SURVEY. IN THE REAR YARD IT SHOULD YOU ARE MOVING THE WATER TO THE BACK NEIGHBORING LOT .Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)?The subject lots drainage must not negatively impact any adjacent property. (B)B. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) MITER END ON THE LEFT SIDE IS OUT OF TOLERANCE
ROW FIELD SURVEY /GRADING CERTIFICATION 07/12/2023 APPROVED FSLADISH
Note: Inspector Notes from Inspection 9463 07/12/23 NEED ELEVATION SHOT ACROSS FRONT PROPERTY LINES.. APPOVING AS NOTED PLEASE UPLOAD ELEVATION SHOTS. _____________________________________________________________________________________________________________________ 6/28/2023 - PREVIOUS INSPECTION NOTES 06/28/23 THERE ARE NO ELEVATION SHOTS ON THE REAR ADJOINING PROPERTIES. THERE MUST BE SHOTS LISTED AT THE 10' OFFSET AT 20' INTERVALS ON THE REAR PROPERTY LINE. AT THE PROPERTY ALONG REAR ON A 20" GRID AND INSIDE THE REAR PROPERTY LINE ALSO. Elevations every 20 ft off the property lines Sec 300.01D2 Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern Elevations every 20 ft. on the property line Sec 300.01D1 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals.. 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= NEED A NEW FINAL SURVEY. IN THE REAR YARD IT SHOULD YOU ARE MOVING THE WATER TO THE BACK NEIGHBORING LOT .Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)?The subject lots drainage must not negatively impact any adjacent property. (B)B. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) MITER END ON THE LEFT SIDE IS OUT OF TOLERANCE
U-CROSS CONNECTION 07/06/2023 APPROVED - AS NOTED LFITZGERALD
Note: has potable irrigation with PVB installed-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/28/2023 Disapproved -FEE REQUIRED FSLADISH
Note: 06/28/23 THERE ARE NO ELEVATION SHOTS ON THE REAR ADJOINING PROPERTIES. THERE MUST BE SHOTS LISTED AT THE 10' OFFSET AT 20' INTERVALS ON THE REAR PROPERTY LINE. AT THE PROPERTY ALONG REAR ON A 20" GRID AND INSIDE THE REAR PROPERTY LINE ALSO. Elevations every 20 ft off the property lines Sec 300.01D2 Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern Elevations every 20 ft. on the property line Sec 300.01D1 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals.. 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= NEED A NEW FINAL SURVEY. IN THE REAR YARD IT SHOULD YOU ARE MOVING THE WATER TO THE BACK NEIGHBORING LOT .Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)?The subject lots drainage must not negatively impact any adjacent property. (B)B. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) MITER END ON THE LEFT SIDE IS OUT OF TOLERANCE
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/28/2023 CANCELLED BY INSPECTOR GBERTOLA
Note: duplicate inspection
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/21/2023 Disapproved - NO FEE GBERTOLA
Note: 06/21/23= NEED A NEW FINAL SURVEY. IN THE REAR YARD IT SHOULD YOU ARE MOVING THE WATER TO THE BACK NEIGHBORING LOT .Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)?The subject lots drainage must not negatively impact any adjacent property. (B)B. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) MITER END ON THE LEFT SIDE IS OUT OF TOLERANCE The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) I NEED ELEVATION ON THE FRONT PROPERTY LINE
ROW- PROJECT STATUS 04/26/2023 APPROVED GBERTOLA
Note: NOW LOOK GOOD NEED TO WAIT FOR THE FINAL SURVEY
ROW- PROJECT STATUS 04/25/2023 APPROVED GBERTOLA
Note: still low on the right side corner on the right side facing the house half of way down i lefted a wood steake. from the wood steake down to the end of the property need to bring the up. to push water to the front
ELECTRIC - EARLY POWER 04/19/2023 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 1445. Release Power 4/18/2023 - PREVIOUS INSPECTION NOTES Door is locked. Need access for inspection
ELECTRIC - EARLY POWER 04/18/2023 Disapproved - NO FEE KSANDOE
Note: Door is locked. Need access for inspection
ROW- PROJECT STATUS 04/18/2023 APPROVED - AS NOTED GBERTOLA
Note: on the right side facing the house half of way down i lefted a wood steake. from the wood steake down to the end of the property need to bring the up. to push water to the front
ROW FIELD SURVEY /GRADING CERTIFICATION 04/18/2023 Disapproved - NO FEE FSLADISH
Note: 04/18/23 NOT READY FOR FIELD SURVEY INSPECTION. PLEASE SEE ATTACHED PHOTO FOR REFERENCE.
U - SEWER TIE IN 04/04/2023 APPROVED - AS NOTED MGIBSON
Note: C/O BY TAP NEEDS TO BE OFF-SET FROM DRIVEWAY
GRAVITY SEWER TEST 04/04/2023 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 03/21/2023 APPROVED GBERTOLA
Note: 3/21/23= AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/17/2023 - PREVIOUS INSPECTION NOTES ** 03/17/23 CULVERT ELEVATION IS GOOD ** CM ON SITE CANCELLED INSPECTION APRON NEEDS TO BE DUG OUT TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN APRON, WILL RECHEDULE __________________________________________________________________________________________________________________________ 3/10/2023 - PREVIOUS INSPECTION NOTES Not ready for Inspection. NO forms yet.
ROW- PRE-APRON (PRE-POUR) 03/20/2023 CANCELLED BY APPLICANT WEB
Note: 3/17/2023 - PREVIOUS INSPECTION NOTES ** 03/17/23 CULVERT ELEVATION IS GOOD ** CM ON SITE CANCELLED INSPECTION APRON NEEDS TO BE DUG OUT TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN APRON, WILL RECHEDULE __________________________________________________________________________________________________________________________ 3/10/2023 - PREVIOUS INSPECTION NOTES Not ready for Inspection. NO forms yet.
ROW- PRE-APRON (PRE-POUR) 03/17/2023 CANCELLED BY APPLICANT EMADISON
Note: ** 03/17/23 CULVERT ELEVATION GOOD ** CM ON SITE CANCELLED INSPECTION APRON NEEDS TO BE DUG OUT TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN APRON, WILL RECHEDULE __________________________________________________________________________________________________________________________ 3/10/2023 - PREVIOUS INSPECTION NOTES Not ready for Inspection. NO forms yet.
ROW- PRE-APRON (PRE-POUR) 03/10/2023 Disapproved -FEE REQUIRED RGROSS
Note: Not ready for Inspection. NO forms yet.
PEP TANK INSTALLATION REQUEST 03/02/2023 APPROVED - AS NOTED TSCHWEERS
Note: 3/2/2023 Gravity Sewer no need for pep tanks.
LATH/BRICK/ WATER BARRIER 01/17/2023 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2490 Insulation numbers need to be on site
INSULATION 01/13/2023 APPROVED - AS NOTED KSANDOE
Note: Insulation numbers need to be on site
WINDOW NAILING 01/06/2023 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2420 Window nailing inspection added. 5ft head test failed Garage door bucking anchors missing 2x2 washers
ALL ROUGH 12/08/2022 APPROVED - AS NOTED KSANDOE
Note: Window nailing inspection added. 5ft head test failed Garage door bucking anchors missing 2x2 washers
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/01/2022 APPROVED KSANDOE
ROOF VALLEY & METAL 10/21/2022 APPROVED KSANDOE
WALL SHEATHING 10/20/2022 APPROVED KSANDOE
Note: 9/27/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 9/19/22 Trusses on site have been stored improperly for an extended period of time. Prior to use, provide a sealed engineer certification to the building department verifying the integrity of the trusses for approval. 9/27/22 Above notes have not been adhered to. Trusses have been installed. No further inspections are to be scheduled until truss integrity is verified. 110.6 Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or con cealed until authorized by the building official.
ROOF SHEATHING 10/20/2022 APPROVED - AS NOTED KSANDOE
Note: 9/27/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 9/19/22 Trusses on site have been stored improperly for an extended period of time. Prior to use, provide a sealed engineer certification to the building department verifying the integrity of the trusses for approval. 9/27/22 Above notes have not been adhered to. Trusses have been installed. No further inspections are to be scheduled until truss integrity is verified. 110.6 Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or con cealed until authorized by the building official. 10/20/22 Trusses need to be cleared of collected dirt in accordance with evaluation.
ROOF SHEATHING 09/27/2022 Disapproved -FEE REQUIRED KSANDOE
Note: Inspector Notes from Inspection 2340 9/19/22 Trusses on site have been stored improperly for an extended period of time. Prior to use, provide a sealed engineer certification to the building department verifying the integrity of the trusses for approval. 9/27/22 Above notes have not been adhered to. Trusses have been installed. No further inspections are to be scheduled until truss integrity is verified. 110.6 Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or con cealed until authorized by the building official.
WALL SHEATHING 09/27/2022 Disapproved -FEE REQUIRED KSANDOE
Note: Inspector Notes from Inspection 2340 9/19/22 Trusses on site have been stored improperly for an extended period of time. Prior to use, provide a sealed engineer certification to the building department verifying the integrity of the trusses for approval. 9/27/22 Above notes have not been adhered to. Trusses have been installed. No further inspections are to be scheduled until truss integrity is verified. 110.6 Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or con cealed until authorized by the building official.
TIE BEAM / LINTEL 09/19/2022 APPROVED - AS NOTED KSANDOE
Note: 9/19/22 Trusses on site have been stored improperly for an extended period of time. Prior to use, provide a sealed engineer certification to the building department verifying the integrity of the trusses for approval.
FOUND SURVEY APPROVED (OFFICE) 09/19/2022 APPROVED AMOBLEY
MONOLITHIC SLAB 07/22/2022 Disapproved - NO FEE BTAYLOR
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Slab is washed out due to rain. Please walk your jobs prior to scheduling. 7/22/22 No termite paperwork onsite Stopped inspection
MONOLITHIC SLAB 07/22/2022 APPROVED MKRASKI
MONOLITHIC SLAB 07/21/2022 CANCELLED BY APPLICANT KSANDOE
Note: THIS IS A REINSPECTION Slab is washed out due to rain. Please walk your jobs prior to scheduling.
MONOLITHIC SLAB 07/20/2022 Disapproved -FEE REQUIRED KSANDOE
Note: Slab is washed out due to rain. Please walk your jobs prior to scheduling.
PLUMBING 1ST ROUGH UNDERGROUND 07/14/2022 APPROVED KSANDOE
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION WATER DISTRIBUTION LINES ARE APPROVED, 5' HEAD TEST NOT HOLDING 7/11/22 5FT head still not holding
PLUMBING 1ST ROUGH UNDERGROUND 07/11/2022 Disapproved -FEE REQUIRED KSANDOE
Note: THIS IS A REINSPECTION WATER DISTRIBUTION LINES ARE APPROVED, 5' HEAD TEST NOT HOLDING 7/11/22 5FT head still not holding
PLUMBING 1ST ROUGH UNDERGROUND 07/08/2022 Disapproved -FEE REQUIRED MGIBSON
Note: WATER DISTRIBUTION LINES ARE APPROVED, 5' HEAD TEST NOT HOLDING
WATER METER INSTALLATION REQUEST 04/08/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 06/27/2023 06/27/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your file to 'final survey'
MECH COMPLETE 04/04/2023 04/04/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 11/07/2022 11/07/2022
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Update mechanical subcontractor. Current says deceased
BLD COMPLETE 10/20/2022 10/20/2022
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 09/19/2022 09/19/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 09/19/2022 09/19/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN INFORMATION 09/16/2022 09/16/2022
Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM THIS IS NOT A FOUNDATION SURVEY YOU WILL NEED TO SUBMIT A FOUNDATION SURVEY
ZON COMPLETE 10/07/2021 10/07/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/07/2021 10/08/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 09/22/2021 09/23/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Noticed in notes on site plan that driveway may be asphalt millings or crushed concrete fines. Driveways must be solid concrete or pavers per the ldc. Please correct site plan/survey to specify the correct approved material
ENGIN1 COMPLETE 09/22/2021 09/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/22/2021 09/29/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 09/08/2021 09/08/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway
ENGIN1 COMPLETE 09/08/2021 09/08/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/08/2021 09/15/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 08/12/2021 08/12/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway and driveway House layout on landscape plan doesn't match plans and site plan Must have a total of four trees for this lot size Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home AC pad must be screened with 7 gallon shrubs
BLD COMPLETE 08/12/2021 08/16/2021
Note: Released By: JPI
BLD HOLD 06/24/2021 06/24/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM PLAN REVIEW COMMENT NO. 1 FROM PREVIOUS REVIEW HOLD HAS BEEN REMOVED. PLEASE RESPOND TO REMAINING COMMENT BELOW. 2. Product Approval Spec Sheet provided, and Product Approval #’s provided for on drawings, page PA. Numbers do not match for multiple products. Please review and either provide matching numbers or eliminate one.
BLD HOLD 05/27/2021 05/31/2021
Note: Held By: JPI 1. Correct sheet numbering and/or append missing sheets. 2. Product Approval Spec Sheet provided, and Product Approval #’s provided for on drawings, page PA. Numbers do not match for multiple products. Please review and either provide matching numbers or eliminate one.
CUSVC COMPLETE 05/27/2021 06/04/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 05/27/2021 06/01/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/27/2021 05/27/2021
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
LOCATE COMPLETE 05/27/2021 06/02/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 05/27/2021 05/28/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/27/2021 06/04/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 05/27/2021 06/07/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway and driveway House layout on landscape plan doesn't match plans and site plan Must have a total of four trees for this lot size Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home Please always state on color sheet that stucco and siding will all be same color
SWALE COMPLETE 05/27/2021 08/09/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 07/20/2023
SW ENG REINSPECTION 20 ¤20.00 07/20/2023
SW ENG REINSPECTION 20 ¤20.00 07/20/2023
SW ENG REINSPECTION 20 ¤20.00 07/20/2023
SW ENG REINSPECTION 30 ¤30.00 07/20/2023
PLAN REVIEW - REVISION ¤32.50 07/20/2023
REINSPECTION RESIDENTIAL ¤40.00 07/20/2023
REINSPECTION RESIDENTIAL ¤40.00 07/20/2023
REINSPECTION RESIDENTIAL ¤40.00 07/20/2023
REINSPECTION RESIDENTIAL ¤40.00 07/20/2023
REINSPECTION RESIDENTIAL ¤40.00 07/20/2023
CONTRACTOR CHANGE ¤20.00 07/20/2023
CONTRACTOR CHANGE ¤40.00 01/10/2022
CONNECTION FEES ¤1,077.88 01/10/2022
STORM WATER PERMIT FEES ¤80.00 01/10/2022
3% TRANS IMPACT FEE CREDIT (¤51.54) 01/10/2022
SEWER CREDIT (¤1,147.00) 01/10/2022
SEWER INSPECTION ¤25.00 01/10/2022
SEWER CAPITAL FACILITY ¤4,939.76 01/10/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 01/10/2022
BUILDING DISCOUNT 100% (¤1,128.20) 01/10/2022
3% FIRE IMPACT FEE CREDIT (¤11.01) 01/10/2022
IMPACT FEE FIRE ¤367.00 01/10/2022
IMPACT FEE PARKS ¤1,199.12 01/10/2022
IMPACT FEE SCHOOL ¤3,600.00 01/10/2022
IMPACT FEE TRANSPORTATION ¤1,718.00 01/10/2022
WATER -IRRIGATION INSPECTION ¤25.00 01/10/2022
WATER -IRRIGATION INSPECTION ¤25.00 01/10/2022
3% PARKS IMPACT FEE CREDIT (¤35.97) 01/10/2022
NEW RESIDENTIAL INSPECTIONS ¤442.00 01/10/2022
SITE PLAN 20 ¤20.00 01/10/2022
SURCHARGE FS 533.721 ¤2.00 01/10/2022
SURCHARGE - FS 468.631 ¤2.00 01/10/2022
METER - DEPOSIT ¤60.00 01/10/2022
METER - DEPOSIT ¤60.00 01/10/2022
WATER-METER ¤467.09 01/10/2022
WATER- TURN ON ¤25.00 01/10/2022
WATER- TURN ON ¤25.00 01/10/2022
ADMINISTRATIVE RESIDENTIAL ¤20.00 01/10/2022
INSPECTION- ELECTRICAL ¤192.60 01/10/2022
INSPECTION - MECHANICAL ¤192.60 01/10/2022
INSPECTION - PLUMBING ¤192.60 01/10/2022
PLAN REVIEW - RESIDENTIAL ¤88.40 01/10/2022
Fees Total Due: ¤0.00 Total Paid: ¤16,501.33