Permit #2021051749
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00250-0120 |
| CONDITIONED SPACE: 1691 sqft |
| GARAGE: 683 sqft |
| OPENED PORCH (WITH ROOF) : 22 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2508 sqft |
| Block: 00250 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 863-845-6967 |
| Location Address: 33 PRINCETON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/10/2022 |
| NOC: RECORDED |
| Applicant name: LARRY SHERWIN THOMPSON |
| Owner: CARPENTER COMPANIES FLORIDA LLC |
|
Address SUITE 116 TAMPA, FL 33606 |
|
Address 142 WEST PLATT STREET TAMPA, FL 33606 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤140,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
THOMCO OF FLORIDA LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
6381 ROBERTS RD KATHLEEN, FL 33849 |
CGC1513647 (Exp: 08/31/2024) | 863-845-6967 |
Sub Contractors
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/18/2023 | FINAL APPROVED | KSANDOE |
| ROW - FINAL APRON (AFTER POUR) | 07/13/2023 | APPROVED | FSLADISH |
| Note: 07/13/23 LOOKED GOOD AT THE TIME OF THIS INSPECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/13/2023 | APPROVED | FSLADISH |
| Note: 07/13/23 THIS IS A DUPLICATE INSPECTION. THE FINAL SURVEY HAS BEED RESUBMITTED WITH FRONT PROPERTY LINE ELEVATION. | |||
| ROW - STORMWATER FINAL | 07/13/2023 | FINAL APPROVED | FSLADISH |
| Note: 07/13/23 LOOKED GOOD AT HE TIME OF THIS INSPECTION. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/13/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: in future when sewer C/O is next to edge of driveway, place concrete around it-1ft square collar | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/12/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 07/12/23 NEED ELEVATION SHOT ACROSS FRONT PROPERTY LINES.. APPOVING AS NOTED PLEASE UPLOAD ELEVATION SHOTS. 6/28/2023 - PREVIOUS INSPECTION NOTES 06/28/23 THERE ARE NO ELEVATION SHOTS ON THE REAR ADJOINING PROPERTIES. THERE MUST BE SHOTS LISTED AT THE 10' OFFSET AT 20' INTERVALS ON THE REAR PROPERTY LINE. AT THE PROPERTY ALONG REAR ON A 20" GRID AND INSIDE THE REAR PROPERTY LINE ALSO. Elevations every 20 ft off the property lines Sec 300.01D2 Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern Elevations every 20 ft. on the property line Sec 300.01D1 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals.. 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= NEED A NEW FINAL SURVEY. IN THE REAR YARD IT SHOULD YOU ARE MOVING THE WATER TO THE BACK NEIGHBORING LOT .Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)?The subject lots drainage must not negatively impact any adjacent property. (B)B. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) MITER END ON THE LEFT SIDE IS OUT OF TOLERANCE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/12/2023 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9463 07/12/23 NEED ELEVATION SHOT ACROSS FRONT PROPERTY LINES.. APPOVING AS NOTED PLEASE UPLOAD ELEVATION SHOTS. _____________________________________________________________________________________________________________________ 6/28/2023 - PREVIOUS INSPECTION NOTES 06/28/23 THERE ARE NO ELEVATION SHOTS ON THE REAR ADJOINING PROPERTIES. THERE MUST BE SHOTS LISTED AT THE 10' OFFSET AT 20' INTERVALS ON THE REAR PROPERTY LINE. AT THE PROPERTY ALONG REAR ON A 20" GRID AND INSIDE THE REAR PROPERTY LINE ALSO. Elevations every 20 ft off the property lines Sec 300.01D2 Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern Elevations every 20 ft. on the property line Sec 300.01D1 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals.. 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= NEED A NEW FINAL SURVEY. IN THE REAR YARD IT SHOULD YOU ARE MOVING THE WATER TO THE BACK NEIGHBORING LOT .Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)?The subject lots drainage must not negatively impact any adjacent property. (B)B. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) MITER END ON THE LEFT SIDE IS OUT OF TOLERANCE | |||
| U-CROSS CONNECTION | 07/06/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB installed-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/28/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 06/28/23 THERE ARE NO ELEVATION SHOTS ON THE REAR ADJOINING PROPERTIES. THERE MUST BE SHOTS LISTED AT THE 10' OFFSET AT 20' INTERVALS ON THE REAR PROPERTY LINE. AT THE PROPERTY ALONG REAR ON A 20" GRID AND INSIDE THE REAR PROPERTY LINE ALSO. Elevations every 20 ft off the property lines Sec 300.01D2 Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern Elevations every 20 ft. on the property line Sec 300.01D1 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals.. 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/23= NEED A NEW FINAL SURVEY. IN THE REAR YARD IT SHOULD YOU ARE MOVING THE WATER TO THE BACK NEIGHBORING LOT .Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)?The subject lots drainage must not negatively impact any adjacent property. (B)B. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) MITER END ON THE LEFT SIDE IS OUT OF TOLERANCE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/28/2023 | CANCELLED BY INSPECTOR | GBERTOLA |
| Note: duplicate inspection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/21/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 06/21/23= NEED A NEW FINAL SURVEY. IN THE REAR YARD IT SHOULD YOU ARE MOVING THE WATER TO THE BACK NEIGHBORING LOT .Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)?The subject lots drainage must not negatively impact any adjacent property. (B)B. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) MITER END ON THE LEFT SIDE IS OUT OF TOLERANCE The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) I NEED ELEVATION ON THE FRONT PROPERTY LINE | |||
| ROW- PROJECT STATUS | 04/26/2023 | APPROVED | GBERTOLA |
| Note: NOW LOOK GOOD NEED TO WAIT FOR THE FINAL SURVEY | |||
| ROW- PROJECT STATUS | 04/25/2023 | APPROVED | GBERTOLA |
| Note: still low on the right side corner on the right side facing the house half of way down i lefted a wood steake. from the wood steake down to the end of the property need to bring the up. to push water to the front | |||
| ELECTRIC - EARLY POWER | 04/19/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1445. Release Power 4/18/2023 - PREVIOUS INSPECTION NOTES Door is locked. Need access for inspection | |||
| ELECTRIC - EARLY POWER | 04/18/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Door is locked. Need access for inspection | |||
| ROW- PROJECT STATUS | 04/18/2023 | APPROVED - AS NOTED | GBERTOLA |
| Note: on the right side facing the house half of way down i lefted a wood steake. from the wood steake down to the end of the property need to bring the up. to push water to the front | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/18/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 04/18/23 NOT READY FOR FIELD SURVEY INSPECTION. PLEASE SEE ATTACHED PHOTO FOR REFERENCE. | |||
| U - SEWER TIE IN | 04/04/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: C/O BY TAP NEEDS TO BE OFF-SET FROM DRIVEWAY | |||
| GRAVITY SEWER TEST | 04/04/2023 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 03/21/2023 | APPROVED | GBERTOLA |
| Note: 3/21/23= AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/17/2023 - PREVIOUS INSPECTION NOTES ** 03/17/23 CULVERT ELEVATION IS GOOD ** CM ON SITE CANCELLED INSPECTION APRON NEEDS TO BE DUG OUT TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN APRON, WILL RECHEDULE __________________________________________________________________________________________________________________________ 3/10/2023 - PREVIOUS INSPECTION NOTES Not ready for Inspection. NO forms yet. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/20/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 3/17/2023 - PREVIOUS INSPECTION NOTES ** 03/17/23 CULVERT ELEVATION IS GOOD ** CM ON SITE CANCELLED INSPECTION APRON NEEDS TO BE DUG OUT TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN APRON, WILL RECHEDULE __________________________________________________________________________________________________________________________ 3/10/2023 - PREVIOUS INSPECTION NOTES Not ready for Inspection. NO forms yet. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/17/2023 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 03/17/23 CULVERT ELEVATION GOOD ** CM ON SITE CANCELLED INSPECTION APRON NEEDS TO BE DUG OUT TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN APRON, WILL RECHEDULE __________________________________________________________________________________________________________________________ 3/10/2023 - PREVIOUS INSPECTION NOTES Not ready for Inspection. NO forms yet. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/10/2023 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Not ready for Inspection. NO forms yet. | |||
| PEP TANK INSTALLATION REQUEST | 03/02/2023 | APPROVED - AS NOTED | TSCHWEERS |
| Note: 3/2/2023 Gravity Sewer no need for pep tanks. | |||
| LATH/BRICK/ WATER BARRIER | 01/17/2023 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2490 Insulation numbers need to be on site | |||
| INSULATION | 01/13/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Insulation numbers need to be on site | |||
| WINDOW NAILING | 01/06/2023 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 Window nailing inspection added. 5ft head test failed Garage door bucking anchors missing 2x2 washers | |||
| ALL ROUGH | 12/08/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: Window nailing inspection added. 5ft head test failed Garage door bucking anchors missing 2x2 washers | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/01/2022 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 10/21/2022 | APPROVED | KSANDOE |
| WALL SHEATHING | 10/20/2022 | APPROVED | KSANDOE |
| Note: 9/27/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 9/19/22 Trusses on site have been stored improperly for an extended period of time. Prior to use, provide a sealed engineer certification to the building department verifying the integrity of the trusses for approval. 9/27/22 Above notes have not been adhered to. Trusses have been installed. No further inspections are to be scheduled until truss integrity is verified. 110.6 Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or con cealed until authorized by the building official. | |||
| ROOF SHEATHING | 10/20/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: 9/27/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 9/19/22 Trusses on site have been stored improperly for an extended period of time. Prior to use, provide a sealed engineer certification to the building department verifying the integrity of the trusses for approval. 9/27/22 Above notes have not been adhered to. Trusses have been installed. No further inspections are to be scheduled until truss integrity is verified. 110.6 Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or con cealed until authorized by the building official. 10/20/22 Trusses need to be cleared of collected dirt in accordance with evaluation. | |||
| ROOF SHEATHING | 09/27/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Inspector Notes from Inspection 2340 9/19/22 Trusses on site have been stored improperly for an extended period of time. Prior to use, provide a sealed engineer certification to the building department verifying the integrity of the trusses for approval. 9/27/22 Above notes have not been adhered to. Trusses have been installed. No further inspections are to be scheduled until truss integrity is verified. 110.6 Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or con cealed until authorized by the building official. | |||
| WALL SHEATHING | 09/27/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Inspector Notes from Inspection 2340 9/19/22 Trusses on site have been stored improperly for an extended period of time. Prior to use, provide a sealed engineer certification to the building department verifying the integrity of the trusses for approval. 9/27/22 Above notes have not been adhered to. Trusses have been installed. No further inspections are to be scheduled until truss integrity is verified. 110.6 Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or con cealed until authorized by the building official. | |||
| TIE BEAM / LINTEL | 09/19/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: 9/19/22 Trusses on site have been stored improperly for an extended period of time. Prior to use, provide a sealed engineer certification to the building department verifying the integrity of the trusses for approval. | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/19/2022 | APPROVED | AMOBLEY |
| MONOLITHIC SLAB | 07/22/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Slab is washed out due to rain. Please walk your jobs prior to scheduling. 7/22/22 No termite paperwork onsite Stopped inspection | |||
| MONOLITHIC SLAB | 07/22/2022 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 07/21/2022 | CANCELLED BY APPLICANT | KSANDOE |
| Note: THIS IS A REINSPECTION Slab is washed out due to rain. Please walk your jobs prior to scheduling. | |||
| MONOLITHIC SLAB | 07/20/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Slab is washed out due to rain. Please walk your jobs prior to scheduling. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/14/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION WATER DISTRIBUTION LINES ARE APPROVED, 5' HEAD TEST NOT HOLDING 7/11/22 5FT head still not holding | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/11/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: THIS IS A REINSPECTION WATER DISTRIBUTION LINES ARE APPROVED, 5' HEAD TEST NOT HOLDING 7/11/22 5FT head still not holding | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/08/2022 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: WATER DISTRIBUTION LINES ARE APPROVED, 5' HEAD TEST NOT HOLDING | |||
| WATER METER INSTALLATION REQUEST | 04/08/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 06/27/2023 | 06/27/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your file to 'final survey' | |||
| MECH | COMPLETE | 04/04/2023 | 04/04/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/07/2022 | 11/07/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Update mechanical subcontractor. Current says deceased | |||
| BLD | COMPLETE | 10/20/2022 | 10/20/2022 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/19/2022 | 09/19/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/19/2022 | 09/19/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 09/16/2022 | 09/16/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM THIS IS NOT A FOUNDATION SURVEY YOU WILL NEED TO SUBMIT A FOUNDATION SURVEY | |||
| ZON | COMPLETE | 10/07/2021 | 10/07/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/07/2021 | 10/08/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/22/2021 | 09/23/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Noticed in notes on site plan that driveway may be asphalt millings or crushed concrete fines. Driveways must be solid concrete or pavers per the ldc. Please correct site plan/survey to specify the correct approved material | |||
| ENGIN1 | COMPLETE | 09/22/2021 | 09/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/22/2021 | 09/29/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/08/2021 | 09/08/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway | |||
| ENGIN1 | COMPLETE | 09/08/2021 | 09/08/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/08/2021 | 09/15/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/12/2021 | 08/12/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway and driveway House layout on landscape plan doesn't match plans and site plan Must have a total of four trees for this lot size Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home AC pad must be screened with 7 gallon shrubs | |||
| BLD | COMPLETE | 08/12/2021 | 08/16/2021 |
| Note: Released By: JPI | |||
| BLD | HOLD | 06/24/2021 | 06/24/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM PLAN REVIEW COMMENT NO. 1 FROM PREVIOUS REVIEW HOLD HAS BEEN REMOVED. PLEASE RESPOND TO REMAINING COMMENT BELOW. 2. Product Approval Spec Sheet provided, and Product Approval #’s provided for on drawings, page PA. Numbers do not match for multiple products. Please review and either provide matching numbers or eliminate one. | |||
| BLD | HOLD | 05/27/2021 | 05/31/2021 |
| Note: Held By: JPI 1. Correct sheet numbering and/or append missing sheets. 2. Product Approval Spec Sheet provided, and Product Approval #’s provided for on drawings, page PA. Numbers do not match for multiple products. Please review and either provide matching numbers or eliminate one. | |||
| CUSVC | COMPLETE | 05/27/2021 | 06/04/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/27/2021 | 06/01/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/27/2021 | 05/27/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/27/2021 | 06/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/27/2021 | 05/28/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/27/2021 | 06/04/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/27/2021 | 06/07/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway and driveway House layout on landscape plan doesn't match plans and site plan Must have a total of four trees for this lot size Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home Please always state on color sheet that stucco and siding will all be same color | |||
| SWALE | COMPLETE | 05/27/2021 | 08/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 07/20/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/20/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/20/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/20/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/20/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/20/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/20/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/20/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/20/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/20/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/20/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 07/20/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 01/10/2022 |
| CONNECTION FEES | ¤1,077.88 | 01/10/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/10/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 01/10/2022 |
| SEWER CREDIT | (¤1,147.00) | 01/10/2022 |
| SEWER INSPECTION | ¤25.00 | 01/10/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 01/10/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 01/10/2022 |
| BUILDING DISCOUNT 100% | (¤1,128.20) | 01/10/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 01/10/2022 |
| IMPACT FEE FIRE | ¤367.00 | 01/10/2022 |
| IMPACT FEE PARKS | ¤1,199.12 | 01/10/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/10/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 01/10/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/10/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/10/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 01/10/2022 |
| NEW RESIDENTIAL INSPECTIONS | ¤442.00 | 01/10/2022 |
| SITE PLAN 20 | ¤20.00 | 01/10/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/10/2022 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/10/2022 |
| METER - DEPOSIT | ¤60.00 | 01/10/2022 |
| METER - DEPOSIT | ¤60.00 | 01/10/2022 |
| WATER-METER | ¤467.09 | 01/10/2022 |
| WATER- TURN ON | ¤25.00 | 01/10/2022 |
| WATER- TURN ON | ¤25.00 | 01/10/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 01/10/2022 |
| INSPECTION- ELECTRICAL | ¤192.60 | 01/10/2022 |
| INSPECTION - MECHANICAL | ¤192.60 | 01/10/2022 |
| INSPECTION - PLUMBING | ¤192.60 | 01/10/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤88.40 | 01/10/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,501.33 |