I want to search for...
Permit #2021051750
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00550-0110 |
| CONDITIONED SPACE: 1215 sqft |
| CONDITIONED SPACE: 1215 sqft |
| GARAGE: 280 sqft |
| GARAGE: 280 sqft |
| OPENED PORCH (WITH ROOF) : 22 sqft |
| OPENED PORCH (WITH ROOF) : 22 sqft |
| OPENED PORCH (WITH ROOF) : 118 sqft |
| OPENED PORCH (WITH ROOF) : 118 sqft |
| Total Square Footage: 3270 sqft |
| Block: 00550 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: 863-845-6967 |
| Location Address: 16 WOOD ARBOR LN |
| Type: DU - DUPLEX |
| Issue Date: 02/01/2022 |
| NOC: RECORDED |
| Applicant name: LARRY SHERWIN THOMPSON |
| Owner: CARPENTER COMPANIES FL LLC |
|
Address 142 WEST PLATT ST STE 116 TAMPA, FL 33606 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
THOMCO OF FLORIDA LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
6381 ROBERTS RD KATHLEEN, FL 33849 |
CGC1513647 (Exp: 08/31/2024) | 863-845-6967 |
Sub Contractors
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/13/2023 | FINAL APPROVED | RMARTIN |
| Note: did this on 6/12/24 | |||
| U -UTILITY RESIDENTIAL FINAL | 06/13/2023 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 06/12/2023 | APPROVED | FSLADISH |
| Note: 06/12/23 CM FIXED LAST ISSUE WHILE I WAS THERE. LOOKED GOOD AT TIME OF INSPECTION. _____________________________________________________________________________________________________________________ 6/9/2023 - PREVIOUS INSPECTION NOTES 06/09/23 CANNOT PASS ROW FINAL UNTIL FIELD SURVEY PASSES. ___________________________________________________________________________________________________________________________ 6/8/2023 - PREVIOUS INSPECTION NOTES ** 006/08/23 final survey must be approved before the row final is done | |||
| ROW - FINAL APRON (AFTER POUR) | 06/12/2023 | APPROVED | FSLADISH |
| Note: 06/12/23 PIPE ELEVATION GOOD. CUTS MADE. CULVERTS CLEAR. SWALE FULL DUE TO DOWNSTREAM PROPERTIES HIGH SPOTS | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/12/2023 | APPROVED | FSLADISH |
| Note: 06/12/23 CORRECTIONS MADE. SWALE HOLDING WATER DUE TO DOWNSTREAM GRADES, HIGH CULVERTS ON DOWNSTREAM PROPERTIES. _______________________________________________________________________________________________________________________ 6/9/2023 - PREVIOUS INSPECTION NOTES 06/09/23 LEFT SIDE APPROXIMATELY HALF WAY DOWN IS DRAING ONTO NEIGHBORING PROPERTY. CAN NOT NEGATIVELY AFFECT ADJOINING PROPERTY OWNER. SHOWED REPRESENTATIVE AREA IN QUESTION AND LET HIM KNOW THEY NEED TO KEEP THE WATER ON THEIR PROPERTY AND IT MUUST FLOW DOWN THIER PROPERTY LINE AND NOT THE ADJACENT LOT. SWALE NEEDS TO MATCH GRADE ON BOTH SIDES. IT IS FULL OF WATER. _____________________________________________________________________________________________________________________ 6/8/2023 - PREVIOUS INSPECTION NOTES ** 06/08/23 final survey must be approved prior to doing a field survey | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/09/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 06/09/23 LEFT SIDE APPROXIMATELY HALF WAY DOWN IS DRAING ONTO NEIGHBORING PROPERTY. CAN NOT NEGATIVELY AFFECT ADJOINING PROPERTY OWNER. SHOWED REPRESENTATIVE AREA IN QUESTION AND LET HIM KNOW THEY NEED TO KEEP THE WATER ON THEIR PROPERTY AND IT MUUST FLOW DOWN THIER PROPERTY LINE AND NOT THE ADJACENT LOT. SWALE NEEDS TO MATCH GRADE ON BOTH SIDES. IT IS FULL OF WATER. _____________________________________________________________________________________________________________________ 6/8/2023 - PREVIOUS INSPECTION NOTES ** 06/08/23 final survey must be approved prior to doing a field survey | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/09/2023 | APPROVED | FSLADISH |
| Note: 06/023 SURVEY NUMBERS HAVE BEEN ADDED AND CORRECTED. ** 06/08/23 Adjacent driveway culverts and drainage features: Final Survey must include theinverts of adjacent developed property driveway culverts and any other drainage featureswithin 100 feet of the property lines. ( ** need elevation shots in rear yard for drainage conveyance | |||
| ROW - FINAL INSPECTION | 06/09/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 06/09/23 CANNOT PASS ROW FINAL UNTIL FIELD SURVEY PASSES. ___________________________________________________________________________________________________________________________ 6/8/2023 - PREVIOUS INSPECTION NOTES ** 006/08/23 final survey must be approved before the row final is done | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/08/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/08/23 final survey must be approved prior to doing a field survey | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/08/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/08/23 Adjacent driveway culverts and drainage features: Final Survey must include theinverts of adjacent developed property driveway culverts and any other drainage featureswithin 100 feet of the property lines. ( ** need elevation shots in rear yard for drainage conveyance | |||
| ROW - FINAL INSPECTION | 06/08/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 006/08/23 final survey must be approved before the row final is done | |||
| U-CROSS CONNECTION | 06/08/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: both units have irrigation meters coupled wth PVB -no cross connections | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/07/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01(4,5,6) "The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. Section 300, Drawing 300.D,Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’. | |||
| ELECTRIC - EARLY POWER | 05/30/2023 | Disapproved - NO FEE | RSIMS |
| Note: 5/30/23: Unit B (right side) - exterior outlet at irrigation control box is missing the cover. | |||
| ELECTRIC - EARLY POWER | 05/30/2023 | APPROVED | RSIMS |
| Note: 5/30/23: Virtual received for missing box cover. approved FPL notified to release power. 5/30/2023 - PREVIOUS INSPECTION NOTES 5/30/23: Unit B (right side) - exterior outlet at irrigation control box is missing the cover. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/05/2023 | APPROVED | GBERTOLA |
| Note: 5/5/23=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL 5/4/2023 - PREVIOUS INSPECTION NOTES 5/4/23 CULVERT PIPE STILL OUT OF TOLERANCE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/3/2023 - PREVIOUS INSPECTION NOTES 05/3/23= CULVERT PIPEV IS OUT OF TOLERANCE BOTH END. THE WINGS ON THE APRON NEED TO BE 36 INCH MINIMUM | |||
| ROW- PRE-APRON (PRE-POUR) | 05/04/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 5/4/23 CULVERT PIPE STILL OUT OF TOLERANCE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/3/2023 - PREVIOUS INSPECTION NOTES 05/3/23= CULVERT PIPEV IS OUT OF TOLERANCE BOTH END. THE WINGS ON THE APRON NEED TO BE 36 INCH MINIMUM | |||
| ROW- PRE-APRON (PRE-POUR) | 05/03/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 05/3/23= CULVERT PIPEV IS OUT OF TOLERANCE BOTH END. THE WINGS ON THE APRON NEED TO BE 36 INCH MINIMUM | |||
| INSULATION | 02/21/2023 | APPROVED | MKRASKI |
| GRAVITY SEWER TEST | 02/21/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS IS A REINSPECTION SEWER NOT RAN . THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 02/21/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| FIREWALL FINAL | 02/09/2023 | APPROVED | MKRASKI |
| FIREWALL DRYWALL NAILING | 02/03/2023 | APPROVED | FWILLIS |
| Note: 1/26/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 Metal conduits at the fire wall for wire and cable the ends are to be sealed with fire caulk not fire foam. Unit A install nail plate at the UFB wire, garage wall. No water pressure. Seal the dryer and mirowave duct fittings completely. 1-26-23 1. Need to resolve all prior notes before calling additional inspections. not all notres above were resolved. 2. Fire detail calls for cemnt coated nails (screws were used 3. when a revision is approved it needs to replace the old document. having the old sheet on site can cause a failed inspection. | |||
| FIREWALL DRYWALL NAILING | 01/26/2023 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspector Notes from Inspection 2420 Metal conduits at the fire wall for wire and cable the ends are to be sealed with fire caulk not fire foam. Unit A install nail plate at the UFB wire, garage wall. No water pressure. Seal the dryer and mirowave duct fittings completely. 1-26-23 1. Need to resolve all prior notes before calling additional inspections. not all notres above were resolved. 2. Fire detail calls for cemnt coated nails (screws were used 3. when a revision is approved it needs to replace the old document. having the old sheet on site can cause a failed inspection. | |||
| ALL ROUGH | 01/18/2023 | APPROVED - AS NOTED | JWALKER |
| Note: Metal conduits at the fire wall for wire and cable the ends are to be sealed with fire caulk not fire foam. Unit A install nail plate at the UFB wire, garage wall. No water pressure. Seal the dryer and mirowave duct fittings completely. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/17/2023 | APPROVED | MKRASKI |
| Note: | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/06/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1/6/23 1. All items below need to be corrected before calling in for re-inspection, stopped inspection 2. All trade work shall not begin untill after this inspection has been passed per Cheif Building Inspector 12/16/2022 - PREVIOUS INSPECTION NOTES 1. Party wall not per detail, missing 2x blocking and straps at each end 2. Gable end bracing missing on both units A side 1. Truss's CJ5 (2), CJ3 (2), CJ5, HJ7 missing nails B side 1. Truss's EJ7, CJ5 (2), CJ3 missing nails 2. MGT on truss T01 is not bolted to CMU Checked only strapping and gable ends, Stopped inspection | |||
| LATH/BRICK/ WATER BARRIER | 01/03/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/16/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Party wall not per detail, missing 2x blocking and straps at each end 2. Gable end bracing missing on both units A side 1. Truss's CJ5 (2), CJ3 (2), CJ5, HJ7 missing nails B side 1. Truss's EJ7, CJ5 (2), CJ3 missing nails 2. MGT on truss T01 is not bolted to CMU Checked only strapping and gable ends, Stopped inspection | |||
| ROOF VALLEY & METAL | 11/22/2022 | APPROVED | DCUSHING |
| Note: New inspection due to canceled inspection 11/16/2022 - PREVIOUS INSPECTION NOTES 1. Drip edge over lap not installed properly | |||
| ROOF VALLEY & METAL | 11/17/2022 | CANCELLED BY APPLICANT | WEB |
| Note: 11/16/2022 - PREVIOUS INSPECTION NOTES 1. Drip edge over lap not installed properly | |||
| ROOF VALLEY & METAL | 11/16/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Drip edge over lap not installed properly | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/03/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: 11/1/2022 - PREVIOUS INSPECTION NOTES 10/26/2022 - PREVIOUS INSPECTION NOTES Roof sheathing in damaged in 2 location on back of the roof 10.27.22 - Multiple trusses are weathered and deteriorated. Provide a letter from truss engineer that these are still acceptable for use. 11/1/22 Roof sheathing only, 2 sections of roof sheathing are damaged or delaminating on back right corner looking from the back of the home 11/3/22 Roof sheathing approved | |||
| WALL SHEATHING | 11/03/2022 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/01/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 10/26/2022 - PREVIOUS INSPECTION NOTES Roof sheathing in damaged in 2 location on back of the roof 10.27.22 - Multiple trusses are weathered and deteriorated. Provide a letter from truss engineer that these are still acceptable for use. 11/1/22 Roof sheathing only, 2 sections of roof sheathing are damaged or delaminating on back right corner looking from the back of the home | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2022 | Disapproved - NO FEE | DCUSHING |
| Note: 10/26/2022 - PREVIOUS INSPECTION NOTES Wall sheathing in damaged in 2 location on back of the roof 10.27.22 - Multiple trusses are weathered and deteriorated. Provide a letter from truss engineer that these are still acceptable for use. | |||
| WALL SHEATHING | 10/27/2022 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: 10/26/2022 - PREVIOUS INSPECTION NOTES Wall sheathing not nailed properly 10.27.22 - No field nails present at gables above entries. Needs blocking and field nailing. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/26/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Wall sheathing in damaged in 2 location on back of the roof | |||
| WALL SHEATHING | 10/26/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Wall sheathing not nailed properly | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/25/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/05/2022 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 06/23/2022 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/17/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 06/17/2022 | Disapproved - NO FEE | MGIBSON |
| Note: SEWER NOT RAN | |||
| WATER METER INSTALLATION REQUEST | 04/08/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/29/2023 | 03/29/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/31/2022 | 10/31/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/27/2022 | 07/27/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/27/2022 | 07/27/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/12/2022 | 07/12/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY.PDF | |||
| ELEC | COMPLETE | 04/13/2022 | 04/13/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/13/2022 | 04/13/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 02/02/2022 | 02/02/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Reccessed cans in garage need to be fire rated. FRC 2020 R302.5 | |||
| ZON | COMPLETE | 11/02/2021 | 11/02/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/02/2021 | 11/02/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/02/2021 | 11/09/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/20/2021 | 10/20/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: AC pad location different on floor plan, landscape plan and site plan Driveways must be a minimum of 16ft in width on both sides so if one driveway for both it must be 32ft wide within the first 20ft of the garage. Please show this on the site plan for review Noticed in the notes it states that driveway could be asphalt millings but driveways can only be solid concrete or pavers. Please correct notes to state either concrete or pavers Please make sure all setbacks are visible on survey/site plan | |||
| SW1 | COMPLETE | 10/20/2021 | 10/25/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/20/2021 | 10/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/22/2021 | 09/22/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC pad location different on floor plan,landscape plan and site plan Driveways must be a minimum of 16ft in width on both sides so if one driveway for both it must be 32ft wide within the first 20ft of the garage. Please show this on the site plan for review Noticed in the notes it states that driveway could be asphalt millings but driveways can only be solid concrete or pavers. Please correct notes to state either concrete or pavers | |||
| BLD | COMPLETE | 09/22/2021 | 09/23/2021 |
| Note: Released By: JPI Review previously complete | |||
| ENGIN1 | COMPLETE | 09/22/2021 | 09/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/22/2021 | 09/29/2021 |
| Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. | |||
| MECH | COMPLETE | 09/08/2021 | 09/08/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/08/2021 | 09/11/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 09/08/2021 | 09/15/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/08/2021 | 09/08/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway and driveway Site and landscape plan layout doesn't match. Driveways must be a minimum of 16ft in width on both sides so if one driveway for both it must be 32ft wide This house backs to a public right of way. Windows and doors on rear must have banding. Banding on garage area must wrap corners at least two foot on each side | |||
| ELEC | COMPLETE | 09/08/2021 | 09/09/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/08/2021 | 09/08/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/27/2021 | 05/31/2021 |
| Note: Held By: JPI 1. Sections A and B on page S-2A both reference GA File ASW 1002 for separation above block wall. However, file provided on same page is ASW 0810. Please clarify which is appropriate and correct to match. 2. Page 6, roof framing plan indicates incorrect section through rated partition. Floor plan, page 2, indicates Section B with curb. 3. Correct sheet numbering. Foundation and floor plan both labelled page 2. 4. Missing sheet 3A. Complete review cannot be performed. 5. Product Approval Spec Sheet provided, and Product Approval #’s provided for on drawings, page PA. Numbers do not match for multiple products. Please review and either provide matching numbers or eliminate one. | |||
| CUSVC | COMPLETE | 05/27/2021 | 06/04/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/27/2021 | 06/01/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/27/2021 | 05/27/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/27/2021 | 06/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/27/2021 | 05/28/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs for both sides of duplex | |||
| SW1 | HOLD | 05/27/2021 | 06/04/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM “The minimum driveway width is 16 feet for at least 20 feet from the garage doors. They may then be reduced to a minimum of 10 feet to the roadway.” | |||
| ZON | HOLD | 05/27/2021 | 06/07/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show the width and material of front entry walkway and driveway No landscape plan submitted Must have a total of four trees for this lot size Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. Please state on color sheet that stucco and siding will all be one color. Driveways must be a minimum of 16ft in width This house backs to a public right of way. Windows and doors on rear must have banding. Banding on garage area must wrap corners at least two foot on each side | |||
| SWALE | COMPLETE | 05/27/2021 | 08/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 05/31/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/31/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/31/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/31/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/31/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/31/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/31/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 05/31/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 05/31/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 05/31/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 05/31/2023 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/01/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤79.98) | 02/01/2022 |
| SEWER CREDIT | (¤2,932.00) | 02/01/2022 |
| SEWER INSPECTION | ¤25.00 | 02/01/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 02/01/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 02/01/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 02/01/2022 |
| BUILDING DISCOUNT 100% | (¤1,476.80) | 02/01/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 02/01/2022 |
| IMPACT FEE FIRE | ¤734.00 | 02/01/2022 |
| IMPACT FEE PARKS | ¤2,398.24 | 02/01/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 02/01/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,666.00 | 02/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 02/01/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 02/01/2022 |
| NEW RESIDENTIAL INSPECTIONS | ¤608.00 | 02/01/2022 |
| SITE PLAN 20 | ¤20.00 | 02/01/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/01/2022 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/01/2022 |
| CONNECTION FEES | ¤2,155.76 | 02/01/2022 |
| METER - DEPOSIT | ¤120.00 | 02/01/2022 |
| METER - DEPOSIT | ¤60.00 | 02/01/2022 |
| WATER-METER | ¤467.09 | 02/01/2022 |
| WATER- TURN ON | ¤25.00 | 02/01/2022 |
| WATER- TURN ON | ¤50.00 | 02/01/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 02/01/2022 |
| INSPECTION- ELECTRICAL | ¤242.40 | 02/01/2022 |
| INSPECTION - MECHANICAL | ¤242.40 | 02/01/2022 |
| INSPECTION - PLUMBING | ¤242.40 | 02/01/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤121.60 | 02/01/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤30,504.16 |